Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Replacement Vertical Turbine Pumps, newest first.
File Type Posted
Vertical_Turbine_Pump_SOW_draft2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Vertical Turbine Pump Furnish three (3) high volume Floway or Engineer-approved equivalent pumping units for the purpose of sump dewatering. Each pump shall move sump water up a column with a minimum total head of 60 feet at a minimum rate of 5000 gallons per minute (GPM). Each unit shall conform to size and configuration requirements of existing system as specified on the Drawing.

Salient Characteristics Pump Flow rate/head 5000 GPM @ 60’

RPM 1,180

Bowl Suction bell, cast iron Bowl shaft 1.50” DIA. stainless steel Impeller Enclosed, stainless steel Lubrication Oiled shaft tube Strainer material Stainless steel

Motor Power requirement 100 HP Power input 2300 V / 60 Hz / 3 phase; part winding start Drive coupling 1.50” DIA.

Stand Fabricated steel

Column Pipe 16” DIA sch. 30 steel with flanged ends; corrosion resistant coating Line shaft 1.50” DIA stainless steel with stainless steel couplings Shaft tube 2.50” DIA. sch. 80 steel Bushings Water-lubricated bronze Discharge flange 16” 150# ANSI flat face flange Discharge head Steel with corrosion resistant coating Discharge distance 301.5” underground discharge centerline from bottom of motor stand

Required Submittals Prior to Final Payment:

• Complete detailed data and specifications, including complete parts list and performance curves

• Mechanical drawing of actual dimensions (as delivered)

• Electrical drawing showing wiring and control schematics

• Installation diagrams and procedures

• Operation and maintenance manual

Delivery Address FOB Hoover Dam Warehouse #2 Hoover Dam Access Rd, NV State Route 172 US 93 Exit #2 Boulder City, NV 89005 Shipping volume: __________________ ft³ Cost - FOB Hoover Dam Warehouse: __________________ jgarcia Line jgarcia Line jgarcia Sticky Note Marked set by jgarcia