140P8521Q0012 Solicitation Package.pdf

PDF 3 MB Posted

Attached to
Remove and replace existing Heating Ventilation an Federal contract opportunity
Solicitation number
140P8521Q0012
Issued by
Department of the Interior National Park Service

View the file

Other files for this federal contract opportunity

Other files attached to Remove and replace existing Heating Ventilation an, newest first.
File Type Posted
Sol_140P8521Q0012.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park

Section Title

Part I—The Schedule

A Solicitation/contract form

B Bid schedule

C Specifications/Drawings

D Packaging and marking

E Inspection and acceptance

F Deliveries or performance

G Contract administration data

H Special contract requirements

Part II—Contract Clauses

I Contract clauses

Part III—List of Documents, Exhibits, and Other Attachments

J List of attachments

Part IV—Representations and Instructions

K Representations, certifications, and other statements of offerors

L Instructions, conditions, and notices to offerors

M Evaluation factors for award

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040512118

NPS, PWR - SF/SEA MABO

333 Bush Street

Suite 500 San Francisco CA 94104

PPO

Alexander Salgado (415) 623-2253

105/18/2021

140P8521Q0012

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Project requirement is to Remove and Replace Existing Heating, Ventilation, and Air

Conditioning (HVAC) Units at Two Apartment Buildings for the National Park Service, with-in Yosemite National Park, located in El Portal, CA. The project magnitude for this requirement is between $100,000 and $250,000.

Contractor DUNS: ________________________________

Contractor Point of Contact (Email):_________________________________

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 60 calendar days and complete it within ________________ ________________ calendar days after receiving

See FAR clause 52.211-10

06/09/2021

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

NPS, PWR - SF/SEA MABO

333 Bush Street

Suite 500 San Francisco CA 94104

PPO

Peter Passe

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 44

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P8521Q0012

Legacy Doc #: NPS

Delivery: 60 Days After Notice to Proceed

Delivery Location Code: 0009060678

NPS, Yosemite NP

PO Box 700-W

5083 Foresta Road

El Portal CA 95318 US

Period of Performance: 09/01/2021 to 10/31/2021

00010 Remove and replace existing Heating Ventilation and Air Conditioning (HVAC) units at apartments

743 and 744.

Product/Service Code: N041

Product/Service Description: INSTALLATION OF

EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND

AIR CIRCULATING EQUIPMENT

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 4 of 44

SECTION B – BID SCHEDULE

This requirement is for one (1) Firm Fixed Price Construction contract for Remove and Replace Existing Heating

Ventilation and Air Conditioning (HVAC) Units at Two Apartment Buildings in El Portal, CA – Yosemite National

Park.

BASE

Item no. Item Description Quantity

Unit of

Measure Unit Price Total

0001 Remove and Replace HVAC –

Apartment 743 and 744

1 LS $ $

GRAND TOTAL $

*Estimated Quantity

LS = Lump Sum

PERFORMANCE PERIOD: See clause 52.211-10 in Contract Clauses Section

THIS SOLICITATION IS SET ASIDE FOR TOTAL SMALL BUSINESS CONCERNS.

(End of Section B)

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 5 of 44

SECTION C – SPECIFICATIONS/DRAWINGS

Statement of Work

Objective

Yosemite National Park has the need to remove and replace existing Heating Ventilation and Air Conditioning

(HVAC) units at two apartment buildings in El Portal, Ca. Units will be installed at the following locations atop existing concrete pads.

El Portal Apartment Building 743, 9737 Barium Mine Road El Portal, Ca. 95318, eight (8) units.

El Portal Apartment Building 744, 9759 Barium Mine Road El Portal, Ca. 95318, eight (8) units.

Background

The existing units at these locations are outdated and utilize refrigerants and parts that are no longer available.

The location of the work to be done is at about 2,000 feet above sea level. Weather conditions October- April may range from high temperatures, to rain or snow.

Scope

The contractor shall provide all necessary supervision, management, labor, transportation, equipment, materials, any other direct incidental costs, overhead and profit to replace the existing HVAC units that currently serve 16 apartments.

There are eight (8) one-bedroom units which measure approximately 575 square feet. There are eight (8) two-bedroom units which measure approximately 990 square feet.

The contractor shall be responsible for the proper removal and disposal of all sixteen HVAC units, condenser and evaporator coils, compressors, fans, interior thermostats, refrigerant, and refrigerant lines, The contractor shall place the new HVAC units on the existing 36” X 39 ½” concrete pads.

The contractor shall provide for the successful installation of sixteen fully functioning, code compliant HVAC systems, each shall include the following components:

• Multi position furnace with electronically communicated motor (ECM)

• There are two different sized of condensers needed (this size variation is due to difference in square footage of the apartments) The contractor shall provide appropriately sized condensers for each individual apartment unit.

• Digital programmable thermostat

• 5/8-inch x 3/8-inch refrigerant line sets from air handlers to new outdoor units with filter driers and site glasses

• Emergency condensate safety float for all units

• New electrical whips on each unit

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 6 of 44

The contractor shall use existing supply and return plenums.

The contractor shall install all units/components listed above and perform the following tasks:

• The contractor shall utilize existing 20-amp cutler-hammer breakers for outdoor units

• Refrigerant lines shall be run through existing piping routes.

• The contractor shall perform all brazing using nitrogen flow and a nitrogen flow indicator.

• The contractor shall seal all penetrations with mini 1/8-inch hardware cloth for Hanta Virus prevention.

• The contractor shall evacuate and charge with R410A refrigerant.

• The contractor shall start and test each unit to generate a temperature and balance (TAB) report. The NPS does not require this to be a certified TAB report, the NPS will review the report provided to determine if results are acceptable.

• The contractor shall install new 2” PVC furnace exhaust pipes to horizontally through mechanical closet wall, with 1/8” screen covering end of the pipe at each unit. The wall is conventional 2x6 wood framing with drywall interior and stucco exterior.

The contractor shall provide the following warranties in digital and hard copy format:

• 1-year workmanship and materials

• 10 years on parts by manufacturer

• 10 years on compressor by manufacturer

The contractor shall not dispose of any waste using NPS dumpsters within Yosemite National Park or the surrounding communities

The work shall be performed by certified technician in compliance with 40 CFR § 82.161.

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 7 of 44

SECTION D – PACKAGING AND MARKING

Section Does Not Apply

(End of Section D)

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 8 of 44

SECTION E – INSPECTION AND ACCEPTANCE

The following clauses are incorporated by reference:

52.246-12 INSPECTION OF CONSTRUCTION AUG 1996

(End of Section E)

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 9 of 44

SECTION F – DELIVERIES OR PERFORMANCE

F.1.0 PERIOD OF PERFORMANCE

See clause 52.211-10 in Contract Clauses section.

F.2.0 PROGRESS PLAN

At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.

(End of Section F)

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 10 of 44

SECTION G – CONTRACT ADMINISTRATION DATA

G.1.0 In accordance with FAR clause 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts, the Contractor is required to annually report the product types and dollar value of any USDA-designated biobased products purchased during the previous fiscal year (October 1-

September 30) through the System for Award Management (SAM). The report is due no later than October

31 of each year during contract performance and at the end of contract performance. Failure to submit the report into SAM in a timely manner may result in contractual remedies.

G.2.0 In accordance with FAR clause 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration

Equipment and Air Conditioners, the Contractor is required to track and report on an annual basis the amount in pounds of hydrofluorocarbons (HFCs) or refrigerant blends containing HFCs contained in the equipment and appliances delivered under this contract. For FY16 you are required to submit this report directly to the Contracting Officer; for FY17 and after you must submit the information to the System for

Award Management (SAM).

The following local clauses are provided in full text:

CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)

(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The

Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System

(CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR42.15.

(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.

(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at http://www.cpars.csd.disa.milJ. The CPARS

User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.

(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation, and the report will be accessible at http://www.cpars.csd.disa.mil/. Contractor

Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement http://www.cpars.csd.disa.milj/ http://www.cpars.csd.disa.mil/

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 11 of 44 in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.

(f) The following guidelines apply concerning your use of the past performance evaluation:

(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.

(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.

(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the

Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.

(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for

Government use supporting source selection actions after it has been finalized.

(End of clause)

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)

(APR 2013)

Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice

Processing Platform System (IPP).

“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable

Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions –

Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

1. Invoice billed according to contract line items and rates.

2. Certified payrolls and Statement of Compliance in accordance with clause 52.222-8.

3. If the partial payment is billed and the invoice states a lump sum, the invoice shall include an itemized breakdown and narrative progress summary of the work performed during this invoice period.

4. If final payment is billed, the last invoice shall state “FINAL”.

5. Contractor’s Release of Claims shall be submitted with the final invoice.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The

Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP

Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

https://www.ipp.gov/

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 12 of 44

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the

Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

(End of Section G)

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 13 of 44

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1.0 ACCESS

In the event of a site/facility closure, the Contractor shall not perform or make deliveries to the site/facility until it is reopened by the Government, unless otherwise instructed by the Contracting Officer or their designated representative.

H.2.0 WORK HOURS

Work shall be generally performed during normal business working hours of 8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.

H.3.0 ENVIRONMENTAL INTERRUPTION OF WORK

H.3.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. An allowance has been included in the contract time for all environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.

H.3.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species

Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species are discovered to be present in or adjacent to the project area.

H.4.0 DRAWINGS

H.4.1 Reduced Size Drawings. Drawings appearing in this package may be photographically reduced in size.

Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. The Contractor may request full-size drawings from the Contracting Officer.

H.5.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA

H.5.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.

H.5.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the

Contracting Officer immediately in writing giving the location and nature of the findings.

H.5.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract

Clauses Section of this contract.

H.5.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.

H.6.0 SUBSTITUTION – PROCESSION OF WORK

Any proposed key personnel, minimum qualifications for incoming or replacement key personnel, subcontractors, processes, procedures or materials included in the quotation are hereby incorporated into

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 14 of 44 the contract. Performance shall be limited to the personnel, qualifications, firms, procedures, and materials that were specifically identified in the quotation accepted. The Contractor shall obtain the Contracting

Officer’s written consent before making any substitutions or changes. All substitutions or replacements shall comply with the terms and conditions of the contract.

H.7.0 ENVIRONMENTAL IMPACT

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13

October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control

Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);

the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control

Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16

U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the

Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the

United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the

Government for all such liability.

H.8.0 HAZARDOUS MATERIALS

Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.

Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR

1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.

H.9.0 GREEN PROCUREMENT REQUIREMENTS

In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:

• U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.

• USDA Biobased product listings published at www.biopreferred.gov.

• Energy Star® product listings published at www.energystar.gov/products.

• FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories

Contractor shall comply with all reporting requirements stated in the applicable clause(s):

• 52.223-1 Biobased Product Certification

• 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts

• 52.223-4 Recovered Material Certification http://www.epa.gov/cpg/products.htm http://www.bioprefferd.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories http://energy.gov/eere/femp/covered-product-categories

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 15 of 44

• 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items

• 52.223-15 Energy Efficiency in Energy Consuming Products

• 52.223-17 Affirmative Procurement of EPA Designated Items in Service and Construction Contracts

H.10.0 UNAUTHORIZED PERSONNEL

The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.

H.11.0 CONSTRUCTION WAGE RATE REQUIREMENTS APPLICABLE TO TRUCK DRIVERS

29 CFR 5.2(j) limits coverage of construction contractor or subcontractor employees performing as truck drivers under the Construction Wage Rate Requirements (FAR 52.222-6) to only their time spent directly upon the "site of the work" or when hauling between the site of the work and a facility which is dedicated to and located in the proximity of the actual construction location. Other transportation of materials or supplies to or from the site of work by employees of the construction contractor or subcontractor is not

“construction” at the site of work and accordingly is not subject to the Construction Wage Rate

Requirements.

H.12.0 COVID-19 Safety Measures

• Procedures for on-site work, to include daily symptom assessment prior to work, answering a question related to any recent exposure/confirming they have not had any exposure to COVID+ or symptomatic individuals in the last 14 days, and a required temperature screening upon arrival at the job site (this is now required under DOI).

• Contractors should have clear procedures in place for their staff in the event someone reports any symptom(s) of COVID (e.g., they should self-isolate for a 10 day period from date of symptom onset and not return until that time has passed, symptoms have resolved including no fever in the last 24 hours prior to returning). Full symptom list is found here: Symptoms of Coronavirus | CDC. Generally speaking, the guidance for mild symptoms (e.g., runny nose, fatigue, headache) is to treat as COVID and isolate, with the exception of if the symptom resolves quickly and the receive a negative test result sooner than that 10 day period.

• Contractors should have clear procedures in place for quarantine of their employees after a potential exposure either out of work or at work. Quarantine guidance has shifted a bit since the start of the pandemic, but generally speaking people are advised to self-quarantine for a 14 day period after a potential exposure to monitor themselves for symptoms; they should monitor for the full 14 day period but state public health guidance permits them returning to work at the 10 day mark if still reporting no symptoms, just reiterating still the importance of symptom monitoring for the full 14 day period. If an individual becomes symptomatic during the quarantine period, they follow the self-isolation guidance listed above and start the 10 day count on the day symptoms appeared. Important to note that once one has been identified as a close contact of a case and advised to quarantine, they're unable to "test out" of the quarantine by receiving a negative test result during the quarantine period - this is just due to the fact that symptoms can still show up anywhere in the 14 day window even if one tests negative early on.

• Contractors should be aware that facial coverings are now required inside federal buildings and on federal land when 6 feet cannot be maintained. There are a lot of different type of masks out there and so it may be helpful to relay the CDC guidance on this, which specifies what is and is not recommended or effective: Your Guide to Masks | CDC

H.13.0 HAULING RESTRICTIONS

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.cdc.gov%2Fcoronavirus%2F2019-ncov%2Fsymptoms-testing%2Fsymptoms.html&data=04%7C01%7CStephanie_Bartholomew%40nps.gov%7Ca2d4469a02c94c98864008d8c4b37b5e%7C0693b5ba4b184d7b9341f32f400a5494%7C0%7C0%7C637475622429648458%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=HqD9u8r2B0Q2uXDv%2Fo9Kam0TI65phsV1CPdZ3NCak3w%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.cdc.gov%2Fcoronavirus%2F2019-ncov%2Fprevent-getting-sick%2Fabout-face-coverings.html&data=04%7C01%7CStephanie_Bartholomew%40nps.gov%7Ca2d4469a02c94c98864008d8c4b37b5e%7C0693b5ba4b184d7b9341f32f400a5494%7C0%7C0%7C637475622429653436%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=hUSQcSeNe9LD%2BY2l%2FeXOeZ4bdUXQ78bCS52w8BHZk20%3D&reserved=0

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 16 of 44

• Vehicles over 45 feet are prohibited and 1-way controlled traffic for all other vehicles 20 miles East of

Mariposa (Mariposa County) 24 hours per day, seven days per week due to rockslide repairs.

H.14.0 BEAR/ ANIMAL SAFETY

• Bears and other animals are active in Yosemite and surrounding areas. It is necessary for all visitors to practice bear and animal safety. Food items are not to be left in work trucks or anywhere else. The NPS provides bear boxes in campgrounds for food storage. Bear incidents are a ticketable offense in Yosemite.

(End of Section H)

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 17 of 44

SECTION I – CONTRACT CLAUSES

The following clauses are incorporated by reference:

Clause Title Date

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS

JUN 2020

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS OR STATEMENTS

JAN 2017

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS

JUN 2020

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT 2018

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE AUG 2020

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE,

AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB

AND OTHER COVERED ENTITIES

JUL 2018

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN

TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES

OR EQUIPMENT

AUG 2020

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS

NOV 2015

52.211-13 TIME EXTENSIONS SEPT 2000

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE NOV 2020

52.219-14 LIMITATIONS ON SUBCONTRACTING MAR 2020

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION NOV 2020

52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS AUG 2018

52.222-7 WITHHOLDING OF FUNDS MAY 2014

52.222-8 PAYROLLS AND BASIC RECORDS AUG 2018

52.222-9 APPRENTICES AND TRAINEES JULY 2005

52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS FEB 1988

52.222-11 SUBCONTRACTS (LABOR STANDARDS) MAY 2014

52.222-12 CONTRACT TERMINATION – DEBARMENT MAY 2014

52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE

REQUIREMENTS AND RELATED REGULATIONS

MAY 2014

52.222-14 DISPUTES CONCERNING LABOR STANDARDS FEB 1988

52.222-15 CERTIFICATION OF ELIGIBILITY MAY 2014

52.222-3 CONVICT LABOR JUNE 2003

52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR 2015

52.222-26 EQUAL OPPORTUNITY SEP 2016

52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR

CONSTRUCTION

APR 2015

52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES JUN 2020

52.222-50 COMBATING TRAFFICKING IN PERSONS OCT 2020

52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 NOV 2020

52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 JAN 2017

52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER

SERVICE AND CONSTRUCTION CONTRACTS

SEPT 2013

52.223-6 DRUG-FREE WORKPLACE MAY 2001

52.223-12 MAINTENANCE, SERVICE, REPAIR, OR DISPOSAL OF

REFRIGERATION AND AIR CONDITIONERS

JUN 2016

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT

MESSAGING WHILE DRIVING

JUN 2020

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES FEB 2021

52.227-1 AUTHORIZATION AND CONSENT JUN 2020

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 18 of 44

52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND

COPYRIGHT INFRINGEMENT

JUN 2020

52.227-17 RIGHTS IN DATA – SPECIAL WORKS DEC 2007

52.228-2 ADDITIONAL BOND SECURITY OCT 1997

52.228-11 INDIVIDUAL SURETY - PLEDGES OF ASSETS FEB 2021

52.228-14 IRREVOCABLE LETTER OF CREDIT NOV 2014

52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS MAY 2014

52.232-11 EXTRAS APR 1984

52.232-23 ASSIGNMENT OF CLAIMS MAY 2014

52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS JAN 2017

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR

AWARD MANAGEMENT

OCT 2018

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

CONTRACTORS

DEC 2013

52.233-1 DISPUTES MAY 2014

52.233-1 DISPUTES – ALTERNATE I DEC 1991

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT 2004

52.236-2 DIFFERING SITE CONDITIONS APR 1984

52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK APR 1984

52.236-5 MATERIAL AND WORKMANSHIP APR 1984

52.236-6 SUPERINTENDENCE BY THE CONTRACTOR APR 1984

52.236-7 PERMITS AND RESPONSIBILITIES NOV 1991

52.236-8 OTHER CONTRACTS APR 1984

52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,

EQUIPMENT, UTILITIES, AND IMPROVEMENTS

APR 1984

52.236-10 OPERATIONS AND STORAGE AREAS APR 1984

52.236-11 USE AND POSSESSION PRIOR TO COMPLETION APR 1984

52.236-12 CLEANING UP APR 1984

52.236-13 ACCIDENT PREVENTION NOV 1991

52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS APR 1984

52.236-17 LAYOUT OF WORK APR 1984

52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION FEB 1997

52.236-26 PRECONSTRUCTION CONFERENCE FEB 1995

52.242-14 SUSPENSION OF WORK APR 1984

52.243-5 CHANGES AND CHANGED CONDITIONS APR 1984

52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS NOV 2020

52.246-21 WARRANTY OF CONSTRUCTION MAR 1994

52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT

(FIXED-PRICE)

APR 2012

52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT

(FIXED-PRICE) – ALTERNATE I

SEP 1996

52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) APR 1984

52.253-1 COMPUTER GENERATED FORMS JAN 1991

The following clauses are provided in full text:

52.211-10 – COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 19 of 44 work ready for use not later than sixty(60) days after the date the contractor receives the notice to proceed The time stated for completion shall include final cleanup of the premises.

(End of Clause)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror’s attention is called to the Equal Opportunity clause and the Affirmative Action Compliance

Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for Minority Participation for Each Trade Goals for Female Participation for Each Trade

19.8% 6.9%

These goals are applicable to all the Contractor’s construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract

Compliance Programs office.

(c) The Contractor’s compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on

(1) its implementation of the Equal Opportunity clause,

(2) specific affirmative action obligations required by the clause entitled “Affirmative Action Compliance

Requirements for Construction,’’ and

(3) its efforts to meet the goals.

The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to

Contractor, or from project to project, for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract

Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer’s identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 20 of 44

(e) As used in this Notice, and in any contract resulting from this solicitation, the “covered area” is __Mariposa, CA

– Mariposa County_________

(End of Provision)

52.223-11 – OZONE-DEPLETING SUBSTANCES AND HIGH GLOBAL WARMING POTENTIAL

HYDROFLUOROCARBONS (JUN 2016)

(a) Definitions. As used in this clause--

“Global warming potential” means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon Dioxide’s global warming potential is defined as 1.0.

“High global warming potential hydrofluorocarbons” means any hydrofluorocarbons in a particular end use for which EPA’s Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables of alternatives available at (http://www.epa.gov/snap/ ).

“Hydrofluorocarbons” means compounds that only contain hydrogen, fluorine, and carbon.

“Ozone-depleting substance” means any substance the Environmental Protection Agency designates in 40 CFR Part

82 as--

(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or

(2) Class II , including, but not limited to hydrochlorofluorocarbons.

(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), (d), and (e) and 40 CFR Part 82, Subpart E, as follows:

Warning

Contains (or manufactured with, if applicable) *_______, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.

* The Contractor shall insert the name of the substance(s).

(c) Reporting. For equipment and appliances that normally each contain 50 or more pounds of hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons, the Contractor shall—

(1) Track on an annual basis, between October 1 and September 30, the amount in pounds of hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons contained in the equipment and appliances delivered to the Government under this contract by—

(i) Type of hydrofluorocarbon (e.g., HFC-134a, HFC-125, R-410A, R-404A, etc.);

(ii) Contract number; and

(iii) Equipment/appliance;

http://www.epa.gov/snap

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 21 of 44

(2) Report that information to the Contracting Officer for FY16 and to www.sam.gov, for FY17 and after00

(i) Annually by November 30 of each year during contract performance; and

(ii) At the end of contract performance.

(d) The Contractor shall refer to EPA’s SNAP program (available at http://www.epa.gov/snap ) to identify alternatives. The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables available at http://www.epa.gov/snap .

(End of Clause)

52.225-9 – BUY AMERICAN–CONSTRUCTION MATERIALS (Feb 2021)

(a) Definitions. As used in this clause—

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation

(FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means— http://www.sam.gov/ http://www.epa.gov/snap http://www.epa.gov/snap https://www.acquisition.gov/far/part-2#FAR_2_101

Remove and Replace Existing Heating Ventilation and Air Conditioning (HVAC) SOLICITATION NO. 140P8521Q0012

NPS – Yosemite National Park Page 22 of 44

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if–

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United

States…