Questions_and_Technical_Answers_0001.pdf

PDF 393 KB Posted

Attached to
Renovate Sewer Systems Federal contract opportunity
Solicitation number
140P6421R0016
Issued by
Department of the Interior National Park Service Midwest Region

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Sewer Systems, newest first.
File Type Posted
Boring_Logs_0002.pdf PDF
Sol_140P6421R0016_Amd_0002.pdf PDF
Boring_Location_Plans_0002.pdf PDF
Sol_140P6421R0016_Amd_0001.pdf PDF
Wage_Determination.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Bid_Schedule_-_Renovate_Sewer_Systems.pdf PDF
Technical_Questionnaire.docx DOCX document
Drawings.pdf PDF
Notice_to_Contractors.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
Sol_140P6421R0016.pdf PDF
Specifications.pdf PDF
Bid_Schedule_-_Renovate_Sewer_Systems.xlsx XLSX spreadsheet
Updated_-_COVID-19_Mask_Policy.pdf PDF
Technical_Questionnaire.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Headquarters Site beginning excavation?

Q: Will the removal of the existing manhole jeopardize the foundation of the Headquarters building?

Miner’s Castle

Q: Will the underground electric from existing lift station to the panel be located?

General:

Q: Is there a preferred staging and trailer location?

Q: Should delays be encountered with obtaining any of the permits, will a contract extension be granted extending the overall duration of 120 days?

Q: Is the National Park Service willing to consider a solution where Phases 1, 2 & 3 are under construction at the same time?

Q: Reference drawing Sheet C8: It references to connect to existing sewer. What material is the existing sewer main? The 4-inch sewer pipe exiting the Headquarters building is ductile iron pipe.

Q: Is it up to the contractor to spot buried propane line? Or will the National Park Service locate prior to The NPS will be able to give general location only. The contractor will be responsible for locating the propane line.

No The existing manhole is very shallow (1-3ft.) and the existing HQ building outside wall is approximately 12-inch thick reinforced concrete with footings at approximately > 8 ft. of depth.

The contractor will be responsible for locating the existing underground electrical line.

The Park's COR will work with the contractor to establish preferred staging and trailer location.

Yes

Additional contractor question:

The plans call for boring to install the runs of sewer pipe in all locations for a less intrusive installation.

Should we price into our bid the cost of possibly encountering rock/granite or is the National Park Service willing to include a rock/granite adder if we encounter such?

Rock excavation is not anticipated on this construction project. Encountering rock would be considered a differing site condition and the contract may be modified to include extra time and compensation.

That will be addressed if it occurs