Sol_140P6220R0005_Amd_0001.pdf

PDF 99 KB Posted

Attached to
PERI VISITOR CENTER HVAC REPLACEMENT Federal contract opportunity
Solicitation number
140P6220R0005
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document is an amendment to a solicitation for the PERI Visitor Center HVAC Replacement Project. The amendment provides responses to ten questions from potential offerors, notes that the chiller has already been removed, and extends the closing date for receipt of offers to September 17, 2020. Key details include responses that clarify the boiler pump requirements, provide a link to and copy of the existing roof warranty, specify that a COVID plan will be due after award, and note that open cell spray foam cannot be used for attic insulation. The amendment also communicates that the chiller removal is no longer required. Offerors are instructed to consider the amendment information in their proposals.

View the file

Other files for this federal contract opportunity

Other files attached to PERI VISITOR CENTER HVAC REPLACEMENT, newest first.
File Type Posted
B09 Amendment_Amendment Attachment A_0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P6220R0005 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PMM

Springfield IL 62701-1905 413 S. 8th Street NPS, MWR - Missouri MABO

09/11/20200001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/07/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment is to provide the government's responses to questions received and to make a change to the removal of the chiller.

1. QUESTIONS AND RESPONSES:

"Q" - Represents the question received.

"R" - Represents the Government's response to the question.

"AI" - Additional Information

Q-1: Looking at the plans I see what could develop into a problem. The existing three boilers are connected in a primary/secondary loop system. The boilers each have their own

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Kathryn Logsdon

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P6220R0005/0001 pump. The new plan does not show that type of system nor does it specify the two pumps necessary for the two new boilers. The main pumps alone will not provide the water flow that the new boilers will require and you will have system problems. I will quote the project the way it must be, however other bidders likely will not and will consequently have a price advantage. It would be best to see an amendment with the design and details corrected. There should also be a boiler piping detail showing flow control, isolation valves, and possibly a strainer.

R-1: The specified boiler has in integral pump for the secondary loop. Existing pumps WP-3 and

WP-4 are maintained as the primary pumps for the hot water distribution to the building. If alternate boiler is provided without integral secondary pump, contractor should provide external pump.

Q-2: Who had the original roofing contact, is the person that had the roofing contract also the holder of the warranty?

R-2: The Prime Contractor on the Visitor Center

Roof Project was Shearbilt Enterprises, Scott

Blackshear Owner, 501-617-5354. See Responses in

R-2, R-3, and R-4 regarding warranty.

Q-3: Can the contractor be provided with a copy of the current roofing warranty?

R-3: The roof is a commercial roof. The roof material is a brand known as CeDUR Shakes, which is a synthetic composite cedar Shake Roofing

Material. The CeDUR's standard warranty can be found at the following link:

https://static1.squarespace.com/static/595cf307299

4ca8947944b3f/t/5b16e2120e2e72611bf784fe/152822632

4341/Sample%2BWarranty.pdf, and is also included in this amendment as Amendment - Attachment A;

consisting of 2 pages.

Q-4: What is the time period of the current roof warranty?

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P6220R0005/0001

R-4: There are two warranties presently in effect. The first warranty is a one-year

Contractor's warranty on materials and workmanship which was provided by Contractor pursuant to FAR Clause 52.246-21. This warranty is valid for one year from the date of the

Government's final acceptance of the roofing project. That project was accepted by the

Government on 10/10/2019; therefore, that warranty of construction is valid up to, and including, October 9, 2020. The coverage of

Contractor's Warranty can be found in FAR Clause

52.246-21. The second warranty is a manufacturer's warranty. That warranty can be accessed at the link provided in R-3, as well as in the attached Amendment Attachment 1.

Q-5: Can the NPS make sure that the roofing contractor that is currently in possession of the warranty, provide bids to all potential bidding contractors?

R-5: No, this cannot be required.

Q-6: Will the NPS specify which one of the three boiler holes will be patched and which will be reused or is that at the contractor's discretion?

R-6: Roof penetration to be patched is at the contractor discretion, with choice left to simplify piping of new boiler vents through roof.

Q-7: It is important that in the attic there be some sort of climate control air exchange between the two conditioned spaces to mitigate the moisture that will be created from encapsulating the attic space with spray foam. Does the NPS want the contractor to provide some form of air supply and air return to dehumidify and condition the space inside the encapsulated attic? Not conditioning the attic space could lead to a mold problem.

R-7: Attic ventilation has been provided by EF-1 in attic space. EF-1 draws conditioned air through attic.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P6220R0005/0001

Q-8: Will the contractor be required to provide a COVID plan as part of the safety plan upfront or upon reward of contract?

R-8: COVID Plan will be due after award of contract and is to be submitted as part of Safety

Plan.

Q-9: Will the government substitute the following Alternate I FAR clause for FAR 52.219-3

(d)(4) Notice of HUBZone Set-Aside or Sole Source

Award with regard to specialty trade construction in place of the basic clause? "(4) For specialty trade construction, at least 25 percent of the cost of the contract performance to be incurred for personnel shall be spent on the concern's employees."

R-9: Pursuant to FAR Part 19, in order to waive the 50% requirement and reduce the requirement to

25%, a CO's determination had to have been made prior to soliciting the requirement as a HUBZone set-aside under 52.219-3. Since there was no such determination made, the CO is unable to substitute the original Clause 52.219-3 with

Clause 52.219-3 Alternate I.

Q-10: Can the contractor provide 6" of open cell instead of the 4" of closed cell spray foam for encasement of the attic space?

R-10: Attic insulation and ventilation has been designed for air-impermeable insulation. Open cell insulation is not allowed.

AI-1: On the design plans/drawings found at

Attachment 2, Detail 2 on M001 Ref Demo Note 3 states it is contractor responsibility to demo existing chiller. The Park has already had that chiller removed and it is no longer the responsibility of the Contractor to demo that chiller. This was also noted on the applicable photos in Attachment 3. NOTE: A revised set of design plans/drawings at Attachment 2 will not be issued to reflect this change.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

5 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P6220R0005/0001

2. Potential Offerors are to consider the information furnished in this Amendment in the preparation of his/her proposal.

3. Should any of the information in this

Amendment contradict, change, add, or delete any instructions, information, or work specifications provided in the original solicitation documents and/or its attachments, the information contained in this Amendment is deemed to take precedence and will supersede that specific information found to be contrary to, or lacking from the original solicitation documents and/or its attachments, except when a subsequent amendment has been issued for clarification or correction.

Other exceptions include apparent clerical errors, and minor informalities or irregularities that are merely a matter of form and not of substance.

4. Any and all amendments that have been issued against this solicitation are to be acknowledged by the Offeror and submitted with his/her quotation.

5. Reminder that instructions for submission of an offer can be found at Attachment 8.

6. SOLICITATION CLOSING DATE AND TIME has been extended to Thursday, September 17, 2020 at 3:00 p.m. central time. Offers are to be e-mailed to kathryn_logsdon@nps.gov so they are received by the Contracting Officer not later than that date and time.

7. The point of contact for this amendment is:

POC: Kathryn M. Logsdon, Contracting Officer

E-mail: kathryn_logsdon@nps.gov

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)