Questions and Responses_0001.pdf

PDF 75 KB Posted

Attached to
REPLACE DOORS, WINDOWS, AND SHUTTERS Federal contract opportunity
Solicitation number
140P5521R0010
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This document contains questions and responses related to a federal contract opportunity to replace doors, windows, and shutters at a national park site. The opportunity involves installing new windows at the site, with the windows to be fabricated off-site and transported for installation. The contractor will have limited storage and work space in a casemate near the Troops Quarters, and must barricade the area from public access. Electricity and water access will be provided to the contractor at the site for completion of the work, though generator use may be required for large equipment due to limited power availability. Offerors must RSVP by March 22nd to attend an optional site visit related to the solicitation, and comply with COVID-19 masking guidelines during any site visit.

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE DOORS, WINDOWS, AND SHUTTERS, newest first.
File Type Posted
Sol_140P5521R0010_Amd_0003.pdf PDF
Sol_140P5521R0010_Amd_0002.pdf PDF
Sol_140P5521R0010_Amd_0001.pdf PDF
Drawings.pdf PDF
SOW.pdf PDF
Sol_140P5521R0010.pdf PDF
Bid Offer Sheet.pdf PDF
Executive Order 13991.pdf PDF
Map of Site Visit Location.pdf PDF
DBA Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1- Will the park to remain open to the public during construction? Yes, the park will remain open from 9:30am to 4:30pm during COVID. After COVID, it will remain open from 9am to 5pm. The contractor will be responsible for bringing in materials and equipment (via vehicle less than 10 tons) before opening the park. The contractor may work while the park is open but must protect the public.

It is expected that all the windows will be fabricated off-site. The contractor will transport all the windows on-site for installation.

2-where will the contract stage and store materials? We can offer a casemate near end of Troops Quarters. The contractor will be required to barricade the area from the public.

3-is there water and electrical access for the contractor? There is electricity available in the Troops Quarters. The amperage is limited (15 amps at 120V). Large equipment may require generator. There is water in a room across from the Troops Quarters and next to the restrooms. As well as a hose bib outside the restrooms.