Questions_and_Answers_0001.pdf
PDF 77 KB Posted
- Attached to
- REPLACE GATE VALVES AT CONVOY POINT BISCAYNE NATIO Federal contract opportunity
- Solicitation number
- 140P5423R0033
About this file
This document contains questions and answers related to solicitation 140P5423R0033 to replace gate valves at Convoy Point in Biscayne National Park. The solicitation is seeking a contractor to replace gate valves behind the park headquarters building. Testing of the water system will not be required as the park's water plant operator will handle any necessary sampling. If there are no protected mangroves, the contractor will be responsible for removing any trees obstructing access to the gate valves.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5423R0033_Amd_0001.pdf | ||
| Sol_140P5423R0033.pdf | ||
| BISC_Geotech_KBC_1993.pdf | ||
| BISC_Geotech_KBC_1988.pdf | ||
| A04_Construction_Specifications_Vol__2.pdf | ||
| Price_Sheet.pdf | ||
| Wage_Determination.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| A06_Drawings.pdf | ||
| A04_Construction_Specifications_Vol__1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 140P5423R0033
Replace Gate Valves at Convoy Point
Biscayne National Park
Questions and Answers
1) We understand the system will need to remain live at all times. Does that mean pressure testing and chlorination will not be required?
Testing will not be required. If any testing needs to be done, the park will have our own water plant operator do all the sampling.
2) Will tree removal be allowed in the area behind the Headquarters building?
If there are no mangroves that need to be removed, the park will get compliance to remove any tree’s that are in the way of the gate valves. The contractor will need to handle the removal.