Questions_and_Answers_0002.pdf

PDF 361 KB Posted

Attached to
REPLACE GATES AT KIMO VC Federal contract opportunity
Solicitation number
140P5323R0066
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This document contains questions and answers regarding a federal contract solicitation to replace gates at a visitor center. The solicitation, issued by the National Park Service Southeast Region under number 140P5323R0066, asks whether a separate electrical meter will be required for the project. The response provided is that according to the statement of work design documents, a separate meter is not needed or required, as power will be supplied from the visitor center.

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE GATES AT KIMO VC, newest first.
File Type Posted
Sol_140P5323R0066_Amd_0002.pdf PDF
Sol_140P5323R0066_Amd_0001.pdf PDF
DRAWING_-_Install_Automatic_Gate_Systems_CD_Drawings1.pdf PDF
Sol_140P5323R0066.pdf PDF
SOW.pdf PDF
DRAWING_-_Parking_Lot_31.pdf PDF
Wage_Rate_Determination.pdf PDF
Specifications.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Construction_Contract_Administration.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

1. Will we (the contractor) be responsible for setting up a meter for the electrical part of this project or is there one we will be able to use, and if so are you able to tell me the location of the meter? The power will be supplied from the visitor center and a separate meter will not be required and/or needed according to the design documents provided in the

SOW.