Questions_and_Answers_0002.pdf
PDF 361 KB Posted
- Attached to
- REPLACE GATES AT KIMO VC Federal contract opportunity
- Solicitation number
- 140P5323R0066
About this file
This document contains questions and answers regarding a federal contract solicitation to replace gates at a visitor center. The solicitation, issued by the National Park Service Southeast Region under number 140P5323R0066, asks whether a separate electrical meter will be required for the project. The response provided is that according to the statement of work design documents, a separate meter is not needed or required, as power will be supplied from the visitor center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5323R0066_Amd_0002.pdf | ||
| Sol_140P5323R0066_Amd_0001.pdf | ||
| DRAWING_-_Install_Automatic_Gate_Systems_CD_Drawings1.pdf | ||
| Sol_140P5323R0066.pdf | ||
| SOW.pdf | ||
| DRAWING_-_Parking_Lot_31.pdf | ||
| Wage_Rate_Determination.pdf | ||
| Specifications.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| Construction_Contract_Administration.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
1. Will we (the contractor) be responsible for setting up a meter for the electrical part of this project or is there one we will be able to use, and if so are you able to tell me the location of the meter? The power will be supplied from the visitor center and a separate meter will not be required and/or needed according to the design documents provided in the
SOW.