Sol_140P4222Q0053_Amd_0003.pdf

PDF 94 KB Posted

Attached to
ASIS-REPLACE ROOFING AND SIDING Federal contract opportunity
Solicitation number
140P4222Q0053
Issued by
Department of the Interior National Park Service Northeast Region

View the file

Other files for this federal contract opportunity

Other files attached to ASIS-REPLACE ROOFING AND SIDING, newest first.
File Type Posted
Amendment_0003_photos_0003.pdf PDF
amendment_0002_photos_0002.pdf PDF
Sol_140P4222Q0053_Amd_0002.pdf PDF
Sol_140P4222Q0053_Amd_0001.pdf PDF
Covid_Certification_of_Vaccination_0001.pdf PDF
Vaccination_Certification_Notification_0001.pdf PDF
Experience_Questionnaire.docx DOCX document
SOW_Replace_RM_Roof_Rehab_and_Repair_Maintenance_Building_Envelope_Repair_Project.pdf PDF
MD20220010.pdf PDF
Sol_140P4222Q0053.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P4222Q0053 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Philadelphia PA 19107 1234 Market Street, 20th Floor

PNC

South/Philadelphia MABO Northeast Regional Contracting National Park Service

DOI, NPS, NERO & NER SOUTH MABO

08/24/20220003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/08/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

1. Answer questions received:

Q1) Is the sliding door track and hardware set to be replaced?

A1) YES

Q2) What is the type of Roof on the maintenance building, as it is not specified? Is corrugated metal sheathing acceptable to match existing south side of the north section of the Maryland District Maintenance Building?

A2) ASPHALT SHINGLE. METAL IS ACCEPTABLE.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Jody Auerbach

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P4222Q0053/0003

Q3) Do Downspouts require splash block?

A3) YES ON MAINTENANCE BUILDING ONLY. NO GUTTERS

AND DOWNSPOUTS ARE TO BE INSTALLED ON THE

MARYLAND DISTRICT RESOURCE MANAGEMENT BUILDING.

Q4) There is exposed insulation in various places. Shall this be replaced? As it is not specified.

A4) NO

Q5) Is existing siding to be removed? If yes, will it require new sheathing and building wrap?

A5) NO, SIDING REMAINS AND REPAIRED WHERE DAMAGED.

Q6) Is new facia and soffits on north section of the Maryland District Maintenance Building to be metal to match south side of existing building?

A6) YES, SOW STATES DRIP EDGE, FACIA MOLDINGS AND

FLASHINGS SHALL BE CONSTRUCTED OF CORROSION

RESISTENT ALUMINUM OR EQUIVALENT PRODUCT

MATERIALS APPROVED BY THE COR.

Q7) In the SOW, section 3.2 Tasks to be performed by supplier, in the third bullet point it states

"all drip edge facia moldings and flashing shall be constructed of corrosion resistant aluminum or equivalent approved by COR." Does that apply to the north section District Maintenance Building and Assateague Island National Seashores Maryland

District Resource Building?

A7) DRIP EDGE, FACIA MOULDING AND FLASHINGS ON

THE MARYLAND DISTRICT MAINTENANCE BUILDING. DRIP

EDGE AND FLASHINGS ON THE MARYLAND RESOURCE

MANAGEMENT BUILDING, FACIA SHALL REMAIN AS

ROOFING MATERIAL ON THE MARYLAND DISTRICT

RESOURCE MANAGEMENT BUILDING.

Q8) Please confirm that the existing siding door is to be fitted with new padlock hardware set on the outside and an adjustable lever lock on the inside.

A8) NO PADLOCK HARDWARE IS TO BE INSTALLED ON THE

OUTSIDE, ADJUST LEVER LOCK TO BE INSTALLED ON THE

INSIDE.

Q9) Will there be accommodation for a dumpster, portable toilet, and a container for materials and miscellaneous, during the contract duration?

A9) THERE WILL BE A DESIGNATED AREA ONSITE FOR

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P4222Q0053/0003

CONTRACTOR SUPPLIED DUMPSTER, PORTABLE TOILET AND

A COTAINER FOR MATERIALS AND MISCELLANEOUS DURING

CONSTRUCTION.

Q10) Can the electrical panel located on the east wall of the north section of the maintenance building, be temporarily disconnected and partially detached to accommodate new wall components? Would this also apply to external electrical boxes and conduits?

A10) NO, ELECTRICAL PANEL CAN NOT BE TEMORARY

DISCONECTED. TRIM AROUND MOUNTED ELECTRICAL PANEL

IS ACCEPTABLE.

Q11) Please confirm that new 3'0" x 6'8" x 1 3/4" metal exterior door has to be fitted with upper door closer to match the hardware on the door on the south side of the building.

A11) DOOR CLOSER IS NOT REQUIRED.

Q12) Do you have any additional pictures beside the four that are online?

A12) YES, SEE ATTACHED

Q13) Will the contractor be responsible for any permits from the Township?

A13) NO

Q14) Have you selected the shingles you want installed?

A14) NO, CONTRACTOR WILL SUBMIT FOR COR APPROVAL.

2. The Attachments added via modification P0001 are hereby deleted. The Vaccination Certification

Notification and Covid_Certification of

Vaccination are not required.

Period of Performance: 09/26/2022 to 01/26/2023