Q_A_Set_1_Big_Bend_Ph_1_0001.pdf
PDF 102 KB Posted
- Attached to
- BIBE 317515 Replace Park Water System Federal contract opportunity
- Solicitation number
- 140P2023R0048
About this file
This document contains questions and answers regarding solicitation number 140P2023R0048 from the National Park Service to replace and rehabilitate water infrastructure systems at Big Bend National Park in Texas. The solicitation seeks design-build services to replace source, treatment, and distribution components for two public water systems at the park due to increased demand and deferred maintenance. Key personnel may perform multiple roles except for quality control and safety managers. Past performance may include projects up to ten years old that are at least 50% complete. Bonding letters and resumes may deviate from the specified templates if requirements are still met.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P2023R0048_Amd_0002.pdf | ||
| Sol_140P2023R0048_Amd_0001.pdf | ||
| B08_140P2023R0048.pdf | ||
| B08_Attachment_05Construction_Contract_Administration.pdf | ||
| B08_Attachment_4_Solit_PSP_Vol_I_PastPerf_REQD.pdf | ||
| B08_Attachement_1_Key_Personnel_Resume_Form.pdf | ||
| B08_Attachment_2_Letter_of_Comm__Design_Build.pdf | ||
| Sol_140P2023R0048.pdf | ||
| B08_Attachment_3__Solit_PSP_Vol_I_Exp_REQD.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design-Build Rehabilitate Park Water Systems
Big Bend National Park, Texas
PHASE 1
RFP 140P2023R0048, BIBE 317515
Q&A Set 1
1. Section L, Factor 1: For Key Personnel, can a single individual perform the roles of Prime
Superintendent and Prime Safety Manager, or Prime Quality Control Manager and Prime Safety
Manager?
Answer: The Prime Safety Manager may a perform the role as a Prime Superintendent. The
Prime quality Control Manager cannot perform the role of Prime Safety Manager.
2. Section L, Factor 3: The past performance requested is for projects submitted under Factor 1.
Under Factor 1, the requirements are allowing “projects that are currently well underway
(designed and at least 50% construction progress completed) or completed and turned over no longer than ten (10) years preceding the date of this solicitation”. However, Factor 3 states projects “within five (5) years preceding the date of this solicitation.” Please clarify/revise Factor
3 to also state projects within ten (10) years.
Answer: Yes, factor 3 will be within ten (10) years preceding the date of this soliciation
3. Section L, Factor 4: Is a Bonding Letter that has a visible, raised seal (by pencil shading the back to make it visible electronically) included as part of our electronic proposal sufficient to satisfy this requirement?
Answer: Yes, this is acceptable.
4. Please confirm whether Key Personnel Resumes must be provided using Attachment 1 Key
Personnel Resume forms? Or is submission of company-specific resumes (in lieu of the Key
Personnel Resume form) allowable so long as the resumes meet the necessary criteria outlined in Section L of the Solicitation?
Answer: Yes, an alternate form is acceptable.