Questions_Address-_Site_Visit_Tour_Notes_0001.docx

DOCX document 19 KB Posted

Attached to
National Minerals Laboratory Electrical Work Federal contract opportunity
Solicitation number
140L6224Q0004
Issued by
Department of the Interior Bureau of Land Management Wyoming Region

About this file

This document contains notes from a site visit and questions and answers related to a federal solicitation for electrical work. The solicitation is to install three government furnished electrical panels at the National Minerals Laboratory in Worland, Wyoming, and run circuits from the panels to various receptacles. Specifically, the contractor will be responsible for disconnecting and moving a transformer, running circuits from the new panels to two 220V receptacles for an X-ray diffractometer and heat exchanger, both of which will require disconnects, as well as two quad receptacles and two 110V outlets on the south wall of the north bay. The site visit was held on January 11, 2024 to review the work locations. The response deadline and award information are not provided.

View the file

Other files for this federal contract opportunity

Other files attached to National Minerals Laboratory Electrical Work, newest first.
File Type Posted
State_Lab_North_Bay_Identified_Location_0001.pdf PDF
Bid_Schedule_Revised_0001.xlsx XLSX spreadsheet
State_Lab_1ph_and_3ph_Panel_0001.pdf PDF
Site_Visit_Sign-in_Sheet_0001.xlsx XLSX spreadsheet
Sol_140L6224Q0004_Amd_0001.pdf PDF
Statement_of_Work_Revised_0001.pdf PDF
Attachment_5-__SF_1442_Completion_Instructions.pdf PDF
Attachment_1-_Statement_of_Work.pdf PDF
Attachment_6-_Limitations_on_Subcontracting_Breakout.pdf PDF
Attachment_4-_Wage_Determination_WY20230035.docx DOCX document
Attachment_2-_Drawing.pdf PDF
Attachment_3-_Bid_Schedule.xlsx XLSX spreadsheet
Sol_140L6224Q0004.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMD 001

140L6224Q0004 NML Electrical Work Questions Addressed

1. Move transformer or remove?

a. Remove transformer and disconnect to off premises per 01009 3.3 Disposal of Debris.

2. New panels have secondary breaker?

a. Yes

3. Could you provide the specifications of the two panels that will be provided by the government?

a. Please see revised documents attached to the amendment.

4. Will any of the breakers described in Attachment 2 be provided?

a. Please see revised documents attached to the amendment.

5. Scope of work is not clear, could you provide a picture of the existing conditions.

a. Please see additional documents attached to the amendment.

Electric National Mineral Lab Site Visit 1/11/24 Notes:

Start tour by looking at where new panels go. Looked at new panels.

All connections outside get reused.

600 amp existing coming into building.

All existing panels and breakers throughout building stay as is with the exception of the replacement of the service panels.

Add receptacles on the south wall (marked) of the north bay. 2- 220 outlets, 2- quad receptacle 110 outlet. Contractor shall be responsible for all wires and accessories from the panel to the receptacles. All wires shall be contained in conduit to the receptacles.

Specifications for the 220V receptacle for XRD shall be 3Ø, 200 VAC 50/60 Hz 30 A Specifications for the 220V receptacle for Heat Exchanger:

Electrical: 208-230V-1Ø-60Hz -5%+10% Min. Circuit Ampacity: 12.1 A Max. Overcurrent Protection: 15 A Power Cord: 10 ft included, Contractor shall install plug Both XRD and Heat Exchanger shall have disconnects.