Attachment_1_-_Questions_and_Answers_0001.pdf

PDF 139 KB Posted

Attached to
PELICAN LAKE DOCK PURCHASE Federal contract opportunity
Solicitation number
140L5723Q0032
Issued by
Department of the Interior Bureau of Land Management Utah Region

View the file

Other files for this federal contract opportunity

Other files attached to PELICAN LAKE DOCK PURCHASE, newest first.
File Type Posted
Sol_140L5723Q0032_Amd_0001.pdf PDF
Sol_140L5723Q0032.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pelican Lake Dock 140L5723Q0032 Amendment 00001 6/23/2023

Attachment 1

Questions and Answers

Q1: Can you please give me the specific LxWxH of this floating dock?

A1: Please see the Statement of Need, Part 1: Requirements, 2. Dimensions:

Dock length shall be a minimum of 42 feet and maximum of 48 feet.

Dock width shall be a minimum of 6 feet and maximum of 8 feet.

Dock ramp shall be a minimum of 5 feet wide and 12 feet long and include a transition plate.

Dock shall meet ADA guidelines for accessibility.

Q2: What freeboard are you looking for?

A2: It’s best if the dock can sit as close to level with the water as possible. For this type of dock, we are looking for decking that is ~ 13 to 18 inches above the water surface to make getting on and off the boat comfortable and safe (this is the average).

Q3: What is the purpose of this dock?

A3: The purpose is to have this site serve as a boat dock (motorized and non), fishing pier, and a kayak, and canoe launch.

Q4: Do you have any sketches or layouts of this project or of the floating truss?

A4: No pictures or layouts will be provided for this solicitation. Please refer to the Statement of Need, Part 1: Requirements, 4. Submittal:

A. Bidder shall provide specific descriptions of all items that will be supplied together with detailed shop drawings showing finished dimensions, size and layout of all components including reinforcing hardware, and all other information necessary to determine conformance with this specification.

B. Bidder shall include user manual or similar for customer assembly.

C. Bidder shall provide color samples for any color options proposed.

Q5: How is this dock being held in place?

A5: The dock will be held in place by cable anchoring or something similar.