This document is an amendment to a solicitation for the Rainie Falls Trail Clearing and Reconstruction project for the BLM-Medford District Office and Grants Pass Field Office.

The amendment provides details on the April 4th site visit attendance, and answers to 11 questions asked by contractors during the site visit. The key details include:

  • Clarification that only hand tools can be used, and that loose rocks must be cleared from the trail to restore the original grade.
  • Guidance on which trees can remain versus which must be removed.
  • Requirements for the wall replacement at station 12+30.
  • Confirmation that existing bedrock does not need to be chipped down if it is not loose rock.

The overall period of performance for this contract is May 1, 2024 to October 27, 2024. No other changes have been made to the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to C RAINIE FALLS TRAIL CLEARING & RECONSTR, newest first.
File Type Posted
Sol_140L4324R0010_Amd_0001.pdf PDF
Sol_140L4324R0010.pdf PDF
B08_Sol_140L4324R0010_RainieFallsTrailClearing.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE

0001 03/26/2024

6. ISSUED BY CODE LHA

BLM OR-ST OFC PROC MGMT BR(OR952)

1220 SW 3rd Avenue, 12th Floor

PORTLAND OR 97204

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

1. CONTRACT ID CODE

4. REQUISITION/PURCHASE REQ. NO.

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NO.

140L4324R0010

X

9B. DATED (SEE ITEM 11)

03/26/2024

I

PAGE OF PAGES

1 I 3

5. PROJECT NO. (If applicable)

CODE I

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

IXI The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers Dis extended. ra is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

E. IMPORTANT:

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Contractor Dis not Dis required to sign this document and return ______ _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Rainie Falls Trail Clearing and Reconstruction for the ELM-Medford District Office and

Grants Pass Field Office.

The purpose of Amendment 0001 is to post the attendance record from the April 4th site visit and to provide answers to the questions that were asked while the contractors were on site (see attached document).

Period of Performance: 05/01/2024 to 10/27/2024

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 1 0A, as heretofore changed, remains unchanged and in full force and effect .

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

(Signature of person authorized to sign)

Previous edition unusable

Fortunato Sapida Jr

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT 0001 – April 10, 2024

Site visit attendance (04/04/2024):

1. Paul Nowak Construction

2. West Coast Contractors

Answers to questions asked at site visit:

Q1: Can we use a Dingo walk behind piece of equipment?

A1: No. See Solicitation Page 7 of 128 Description of work…“utilizing hand tools”.

Q2: Can we use a chipper or a grinder (these are larger than typical hand tools - as indicated in Contract docs)?

A2: No. See Solicitation page 7 of 128 Description of work…“utilizing hand tools”.

Q3: Does all the loose rock need to be cleared off the trail?

A3: Yes. See Solicitation page 22 of 128 in Section 201 Clearing and Grubbing…“work consists of clearing”…“loose rocks".

Q4: Is the intent of the rock clearing to get back to original grade?

A4: Yes.

Q5: Can we leave the humps in the trail as long as we maintain a trail width of 36"?

A5: No (see above Q4 and A4). The intent is to clear the loose rock back to the original grade.

Q6: Do the live trees near station 5+00 have to be cleared?

A6: No. The burned 34" Madrone near this station is to remain, and the live fir tree is to remain. The burned and dead fir tree is to be cleared. With trees in the clearing zone over 6" diameter, consult with the COR as to whether they get cleared or remain. The overall intent is keeping live trees and to remove hazard trees and trees that are already dead or imminently dying.

Q7: Does the vertical Bedrock have to be chipped in areas where the trail is less than 3' wide?

A7: No. See solicitation Section B-Bid Schedule Page 5 of 128, and Page 23 and 28 of 128, which indicates trail widening.

Q8: Does the 6" madrone near station 11+00 need to be cleared?

A8: No.

Page 2 of 3Rainie Falls Trail Clearing, Josephine County, Oregon BLM-Medford District Office

Q9: Does the 10" madrone near station 14+00 with a large branch over the trail need to be cleared?

A9: No.

Q10: Does the wall at station 12+30 need to be replaced in kind, or replaced with the type of walls that are indicated in the plans.

A10: Replace wall at 12+30 with a type of wall that is indicated in the plans (pages 119, 120, 121, 122, 123, and 124 of 128) and specifications (section 204, 209, 253, and 717).

Q11: If there is existing bedrock poking up through the trail (such as 8" pointy rock near station 14+00) - does that need to be chipped down to be even with the trail?

A11: No. Solicitation page 22 of 128 only indicates removal of loose rock.