Questions and Answers Final_0002.docx
DOCX document 16 KB Posted
- Attached to
- GOUGE EYE AND PATTERSON CHAINING 2020 Federal contract opportunity
- Solicitation number
- 140L3920Q0071
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3920Q0071_Amd_0002.pdf | ||
| Sol_140L3920Q0071_Amd_0001.pdf | ||
| SCA WD 1969 0113_0001.pdf | ||
| Chaining Techniques.pdf | ||
| WD 2015-5599.pdf | ||
| Maps Patterson Pass Chaining 2020.pdf | ||
| Maps Gouge Eye Chaining 2020.pdf | ||
| SOW Gouge Eye_Patterson Pass 2020.doc | DOC document | |
| Sol_140L3920Q0071.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gouge Eye & Patterson Pass Chaining 2020 Issuing Office: BLM Nevada State Office Location: BLM Ely Field Office Solicitation Number: 140L3920Q0071_002 Questions and Answers
Q#1: Will there be a formal site visit pre-award for this project?
A#1: There is not a formal site survey for this project. Per the Statement of Work, it is recommended that potential offerors conduct a site inspection on the public lands prior to bidding.
Q#2: Does the Period of Performance includes the time needed to mobilize and travel to the project sites? Is an extension possible?
A#2: The awarded contract’s period of performance will include all actions from the date of award till the end of the period of performance. Offerors should include in their bids the time required to meet all the requirements per the statement of work.
Q#3: If there is a need to stop work for environmental conditions, who do we let know, and is an extension of the period of performance available?
A#3: if work has to stop for reasons outside of the vendor’s control (Example; Extreme Weather, National Emergency, Natural Disaster), the vendor would have to email the Contracting Officer and request a no-cost period of performance extension and detail the justification.
Q#4: Is there a requirement for a specific make and/or model of GPS tacking equipment?
A#4: No, any GPS equipment or software will need to support the import and export of shape files to meet the requirements in the Statement of Work .
Q#5: Can Drones be used for surveys of the Project area?
A#5: Vendors would have to research the FAA rules for the project areas. There are no known local BLM-Nevada restrictions for the specific areas designed in the Solicitation.