Sol_140L3724Q0002_Amd_0001.pdf
PDF 93 KB Posted
- Attached to
- Banta Ridge Mastication 628 acres Federal contract opportunity
- Solicitation number
- 140L3724Q0002
About this file
This document contains answers to questions about solicitation number 140L3724Q0002 from the Department of the Interior Bureau of Land Management Idaho Region for the Banta Ridge Mastication project involving 628 acres.
The solicitation requires mastication of all juniper trees 18 inches or less in diameter at breast height on site. Acceptable equipment includes rubber-tired mulching machines in good working condition equipped with hydro-axe/Fecon cutting heads capable of operating on slopes up to 30 percent and processing trees or logs up to 16 inches in diameter. Tracked equipment is not allowed due to potential ground disturbance issues. A minimum of two rubber-tired machines that each meet the specified horsepower requirements must be available to the contractor to minimize downtime in case of equipment failure. A KMZ file of the project area is available by emailing the specified request address.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NWDF_WRFO_Banta_Ridge_2023.pdf | ||
| Map.doc | DOC document | |
| SOW_Banta_Ridge_Mechanical.pdf | ||
| Wage_Determination_2015-5439_r21.pdf | ||
| Sol_140L3724Q0002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L3724Q0002 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LFA
BOISE ID 83705
3833 S. DEVELOPMENT AVE.
BLM FA-NTL INTRAGCY FIRE CTR(FA250)
12/04/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/15/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0001 is issued to answer questions received about the RFQ.
Q1. Has the project area been treated before? If yes, when?
A1. The project site has not been mechanically treated before.
Q2. Are current pictures for the landscape available?
A2. No
Q3. Is there a preferred location for a "base camp"?
A3. As long as a camp is based on BLM lands and no new roads/two tracks are established
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140L3724Q0002/0001 to/from the camping site, there is no preferred camp site.
Q4. Will rubber tracked, low ground pressure mulching machines be acceptable?
A4. Tracked equipment is not allowed for fuels treatments within this field office. The dry upland sites are susceptible to invasion from cheatgrass once the ground has been disturbed.
Rubber tired equipment is much less likely to cause ground disturbance than tracked equipment.
Soil compaction is not considered an issue in this field office.
Q5. Can we temporarily place bulk fuel on-site?
A5. As long as the bulk fuel tank is not leaking, temporary bulk fuel tanks are allowed on site.
Q6. Are there any restrictions on working hours?
A6. During summer months when fire restrictions may be in place is the only time when there are restrictions on working hours.
Q7. We are getting ready to put in a bid on the above listed job and I have a question on the specifications. (Mastication specifications require rubber-tired mulching machines in good running conditions that are equipped with a hydro-axe/fecon cutting heads capable of working slopes up to 30 percent and mulching trees or logs up to 16 inches in DBH.) Would rubber tracks on a compact skid loader be technically acceptable? I think it would be a safer option on those slopes and would apply approximately 4.2 pounds per square inch on the ground. That would be less per square inch than the rubber tires..?
A7. Tracked equipment is not allowed for fuels treatments within this field office. The dry upland sites are susceptible to invasion from cheatgrass once the ground has been disturbed.
Rubber tired equipment is much less likely to cause ground disturbance than tracked equipment.
Soil compaction is not considered an issue in this field office.
Q8. Would a tracked mulching machine be an acceptable equivalent in place of the rubber-tired mulching machine?
A8. Tracked equipment is not allowed for fuels treatments within this field office. The dry
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140L3724Q0002/0001 upland sites are susceptible to invasion from cheatgrass once the ground has been disturbed.
Rubber tired equipment is much less likely to cause ground disturbance than tracked equipment.
Soil compaction is not considered an issue in this field office.
Q9. I wanted to reach out and see if I can get some clarification on the 84 Mesa Mastication project and the Banta Ridge Mastication. Looking at the maps provided there doesn't seem to be a lot of trees per acre. I see that there is a minimum of 2 wheeled machines needed for these projects and was curious about the reason behind this requirement. To me there is not enough work for two machines. There is plenty of time in the allotted window to finish both of these projects with a single machine. We have 4 rubber-tired machines so that is not a problem for us to bring two, just want to make sure I'm not missing an important detail in the scope of work . Are the areas of concern really as sparse as it looks on google earth? All juniper trees 18" at DBH or less will be masticated on site. We are trying to keep our bids as competitive as possible in order to win both jobs.
A9. The SOW states that vendors must HAVE ACCESS to two rubber tired machines that meet the minimum horse power specs... we don't require that the vendor has to have more than one on site. This requirement is meant to minimize
'down time' in the case of a catastrophic failure of the primary machine. Depending on the polygon, there is a low to moderate density of trees that are at or under the 18" DBH requirement.
Q10. Is a kmz file available?
A10. Yes but the format is not compatible with sam.gov. Request the file by emailing lstjohn@blm.gov.
end -