Sol_140L3724Q0001_Amd_0002.pdf

PDF 95 KB Posted

Attached to
84 Mesa Mastication, 771 acres Federal contract opportunity
Solicitation number
140L3724Q0001
Issued by
Department of the Interior Bureau of Land Management Idaho Region

About this file

This document is an amendment to a solicitation for the 84 Mesa Mastication project on 771 acres. The Bureau of Land Management Idaho Region seeks to award a contract for mechanical treatment of juniper trees 18 inches or less in diameter by breast height using rubber-tired mastication equipment. The amendment provides answers to potential offerors' questions to clarify requirements. Phase I was conducted by Colorado Parks and Wildlife. Phase II was awarded to Western Timber Management for $215,325 on August 31, 2022. Phase III was awarded to Delbert Johnson Tree and Stump for $90,903 on May 12, 2023. At least two rubber-tired mastication machines must be available for use, though only one needs to be on-site at a time, to minimize downtime in case of equipment failure. Work may begin December 15, 2023 and must be complete by November 30, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to 84 Mesa Mastication, 771 acres, newest first.
File Type Posted
84_Mesa_Phase_4_NAIP_0001.pdf PDF
84_Mesa_Phase_4_0001.pdf PDF
Sol_140L3724Q0001_Amd_0001.pdf PDF
Sol_140L3724Q0001.pdf PDF
Wage_Determination_2015-5439_r21.pdf PDF
Maps.doc DOC document
84_Mesa_Mechanical_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L3724Q0001 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LFA

BOISE ID 83705

3833 S. DEVELOPMENT AVE.

BLM FA-NTL INTRAGCY FIRE CTR(FA250)

12/01/20230002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

11/14/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

84 Mesa Mastication, 771 acres

Amendment 0002 is issued to answer questions received about the RFQ.

Question 1: Would a tracked mulching machine be an acceptable equivalent in place of the rubber-tired mulching machine?" and " Will rubber tracked, low ground pressure mulching machines be acceptable?"

Answer 1: Tracked equipment is not allowed for fuels treatments within this field office.

The dry upland sites are susceptible to invasion from cheatgrass once the ground has been disturbed. Rubber tired equipment is much less likely to cause ground disturbance than tracked equipment.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L3724Q0001/0002

Question 2: "I was looking on SAM for the award results for the previous 84 Mesa project that went out for bid earlier this year, but was unable to find anything. Was this bid awarded, and if so, could you tell me the award amount?"

and "Who were the Vendors for phases 1, 2, & 3 of this project and what was their pricing? "

Answer 2:

Phase I: Phase I was conducted by Colorado Parks and Wildlife, we do not have information about the order

Phase II: Western Timber Management, order #

140L3722P0061, 8/31/22, $215,325.00

Phase III: Delbert Johnson Tree and Stump, order

#140L3723P0032, 5/12/23, $90,903.00

Question 3: I wanted to reach out and see if I can get some clarification on the 84 Mesa

Mastication project... Looking at the maps provided there doesn't seem to be a lot of trees per acre. I see that there is a minimum of 2 wheeled machines needed for these projects and was curious about the reason behind this requirement. To me there is not enough work for two machines. There is plenty of time in the allotted window to finish both of these projects with a single machine. We have 4 rubber-tired machines so that is not a problem for us to bring two, just want to make sure I'm not missing an important detail in the scope of work . Are the areas of concern really as sparse as it looks on google earth? All juniper trees 18" at DBH or less will be masticated on site. We are trying to keep our bids as competitive as possible in order to win both jobs.

Answer 3: The SOW states that vendors must HAVE

ACCESS to two rubber tired machines that meet the minimum horse power specs... we don't require that the vendor has to have more than one on site. This requirement is meant to minimize

'down time' in the case of a catastrophic failure of the primary machine. Depending on the polygon, there is a low to moderate density of trees that are at or under the 18" DBH requirement.

Question 4: Has the project area been treated before? If yes, when?

Answer 4: The project site has not been

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L3724Q0001/0002 mechanically treated before.

Question 5: Are current pictures for the landscape available?

Answer 5: No

Question 6: Is there a preferred location for a

"base camp"?

Answer 6: As long as a camp is based on BLM lands and no new roads/two tracks are established to/from the camping site, there is no preferred camp site.

Question 7: Can we temporarily place bulk fuel on-site?

Answer 7: As long as the bulk fuel tank is not leaking, temporary bulk fuel tanks are allowed on site.

Question 8: Are there restrictions on working hours?

Answer 8: During summer months when fire restrictions may be in place is the only time when there are restrictions on working hours.

Question 9: Is a kmz file available?

Answer 9: Yes but the format is not compatible with sam.gov. Request the file by emailing lstjohn@blm.gov.

end of Q&A -

Period of Performance: 12/15/2023 to 11/30/2024

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .