This document contains an amendment to a federal solicitation for construction services. The solicitation being amended is for Grub Dam Repairs with number 140L3623Q0050 issued by the Department of the Interior Bureau of Land Management. The amendment provides answers to questions from interested offerors, including confirming that a concrete mix design submitted without specified pozzolans but including a lithium additive would be acceptable for the project. Offerors must acknowledge receipt of the amendment by the specified date and time to have their offers considered.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_3_0003.pdf | ||
| Sol_140L3623Q0050_Amd_0002.pdf | ||
| Attachment_2_-_Wage_Determination_0001.pdf | ||
| Sol_140L3623Q0050_Amd_0001.pdf | ||
| 140L3623Q0050_0001.pdf | ||
| Amendment_01_0001.pdf | ||
| Attachment_3_-_Reference_List_0001.pdf | ||
| Attachment_1_-_SOW_Grub_Dam_Repairs_0001.pdf | ||
| Solicitation_Package_0001.pdf | ||
| Attachment_5_-_SF25A_Payment_Bond_0001.pdf | ||
| Attachment_4_-_Past_Performance_Questionnaire_0001.pdf | ||
| Sol_140L3623Q0050.pdf | ||
| SOW_GRUB_DAM_REPAIRS_2023_(08-07-23).docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L3623Q0050 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LMA
BILLINGS MT 59101
5001 SOUTHGATE DR.
BLM MT STATE OFC(MT935)
LMA
BILLINGS MT 59101
5001 SOUTHGATE DR.
BLM MT-STATE OFC(MT935)
09/05/20230003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/18/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See below for changes incorporated by this amendment.
Period of Performance: 09/18/2023 to 12/01/2023
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jorge Alvarez
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
PROJECT DESCRIPTION: Grub Dam Repairs Solicitation No. 140L3623Q0050
Description of Changes - This amendment incorporates the following information:
1. The Government is providing the Question received from an interested offeror and the associated Answer provided by the Government.
Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).
Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
PROJECT DESCRIPTION: Grub Dam Repairs Solicitation No. 140L3623Q0050
Questions and Answers
1. Please see the attached concrete mix design from Fossum Ready Mix in Glasgow, MT.
See below. Would it be approved? It does not contain the specified pozzolans.
• The absence of pozzolans is acceptable as long as an additive that accounts for potentially damaging reactions associated with the soils is substituted. The original work at Grub Dam mitigated these reactions using a Lithium additive. Utilizing the same design mixture as the original dam contract would be an acceptable alternative to a non-pozzolan mixture. The mixture, as submitted, does not contain the Lithium additive needed for approval.
LETTER OF TRANSMITTAL
TO: FROM:
Jorge Alvarez
Tyler Youderian
Acting Supervisory PA/Contracting Officer DATE:
9-1-23
Bureau of Land Management
EMAIL: EMAIL:
Alvarez, Jorge A <jalvarez@blm.gov> Tyler@youderianconst.com
PHONE NUMBER: PHONE NUMBER::
406-490-7708
RE: TOTAL NO. OF PAGES, INCLUDING COVER:
RFQ 140L3623Q0050 - GRUB DAM
REPAIRS
DESCRIPTION:
☐ SUBMITTAL PAY REQUEST CHANGE ORDER COPY OF LETTER REQUEST FOR INFO
Please see the attached concrete mix design from Fossum Ready Mix in Glasgow, MT.
Would it be approved? It does not contain the specified pozzolons.
lab:875B992C-C4F8-4770-AA43-A4E60065765E sig:454DC136-9E74-4ABF-A7FA-A5E8003C0316 accred:3
Mix Data Mix Submitted By: Fossum Materials Supplier: Fossum Materials Plant: Fossum Materials Plant Mix Name: 2022 - MDT Class General Specified Design Strength (psi): 4000 at age 28 days Design Unit Weight (pcf): 143.6 Water Cement Ratio (lb/lb): 0.40
Material Source Amount Moisture Cement (lb) GCC IL 611 N/A Coarse Agg (lb) Tampico Pit 1720 Fine Agg (lb) Tampico Pit 1300 Admix 1 (oz) BASF - AE 90 6.1 N/A Admix 2 (oz) BASF - Polyheed 997 24.4 N/A Water (gal) Tampico Pit 29.5 N/A
Sample Details Date Sampled: 04/05/22 Date Received: 04/06/22 General Location: Rimrock Engineering, Inc. Laboratory Sample Location: Rimrock Engineering, Inc. Laboratory Curing Method: Laboratory Cure Field Sample No.: Field Cure Temp (°F) High: 70 Low: 70 Contractor:
Ticket no.: Truck No.:
Sampled By: Jeremy Johnson, ACI #: 01237785 Submitted By: Jeremy Johnson, ACI #: 01237785 Weather:
Est. Wind (mph): Est. Rh (%):
Specification:
Measured Specified Slump (in): ASTM C 143 4 3.00 to 6.50 Slump w/ plasticizer (in): N/A Air Temp (°F): 70 Concrete Temp (°F): ASTM C 1064 69 Air Content (%) ASTM C 231 5.7 5.0 to 8.5 Unit Weight (pcf): ASTM C 138 140.9 143.6 Volume of Density Measure (ft³): 0.249 Batch Size (yd³): 0.10 Time Batched:
Yd³ Placed: Time Sampled:
Water Added (gal) Before: Time Placed:
After: Time in Truck (mins):
Compressive Strength of Concrete Cylinders ASTM C 39 Specimen ID Date Tested Age
(Days) Diameter
(in) Length
(in) Area (in²)
Type of Cap
Maximum Load (lbf)
Fracture Type / Remarks
Compressive Strength (psi)
22-8798\1 04/08/22 3 4.01 8.00 12.63 U 33660 5 2670 22-8798\2 04/08/22 3 4.01 8.00 12.63 U 35780 2 2830 22-8798\3 04/08/22 3 4.01 8.00 12.63 U 34140 3 2700 22-8798\4 04/12/22 7 4.01 8.00 12.63 U 47140 5 3730 22-8798\5 04/12/22 7 4.01 8.00 12.63 U 46580 5 3690 22-8798\6 04/12/22 7 4.01 8.00 12.63 U 45970 3 3640 22-8798\7 05/03/22 28 4.01 8.00 12.63 U 66790 5 5290 22-8798\8 05/03/22 28 4.01 8.00 12.63 U 65760 5 5210 22-8798\9 05/03/22 28 4.01 8.00 12.63 U 68490 2 5420
5310Average 28 Day Compressive Strength (psi) 4000Required Strength (psi)
Project:
RIMROCK
ENGINEERING, INC.
Concrete Test Report Report No: CTR:22-W837-C1 Issue No: 4
2022 Concrete Mix Designs
Job No: 18257-22264
Accreditation is granted by AAP and this accreditation is limited to the laboratory and the standards for which the laboratory is accredited. The results shown on this report relate only to the items inspected or tested. This report shall not be reproduced, except in full, without the prior written approval of Rimrock Engineering, Inc.
Client: Century Companies, Inc.
Reviewed By: Sheri Dorn 5/25/2022Date of Issue:
PO Box 579 Lewistown MT 59457
Fort Peck, Montana
CC:
Title: SET, Laboratory and Field Manager
5440 Holiday Avenue • Billings, MT 59101 • 406.294.8400 • www.rimrock.biz
Page 1 of 1Form No: 18947, Report No: CTR:22-W837-C1 © 2000-2022 QESTLab by SpectraQEST.com
Fracture Type: 2 = Cone & Shear, 3 = C39: Vert cracking/no cones; C1314: Cone & Split, 5 = Semi-Conical Break Curing Method: ASTM C511
Notes Remarks
1. Sampling to ASTM C 172
2. Specimen(s) prepared to ASTM C 31
3. Capping: B = Bonded ASTM C 617,U = Unbonded ASTM C 1231
Plant: Trident Cement Type:
Address: 4070 Trident Road ASTM C1157 GU HS MH
Three Forks, MT 59752 Date Issued: 5-Jan-23
Contact: Cesar Rodriguez Production Period: 1-Dec-22
Phone: (720) 413-8077 To: 31-Dec-22
ASTM Test ASTM Test
Method Method
SiO2 C114 A Blaine Fineness (m2/kg) C204 A A
Al2O3 (%) C114 A Fineness 45 µm (No. 325) Sieve (% retained) C430 A A
Fe2O3 (%) C114 A Density (g/cm3) C188 A A
CaO (%) C114 A Air Content of Mortar (volume %) C185 12 max 12 max
MgO (%) C114 A Autoclave Test, Contraction / Expansion (%) C151 -0.20 min / 0.80 max 0.80 max
SO3 (%) C114 3.0 maxB Time of Initial Setting / Vicat (minutes) C191 45 min / 420 max 45 min / 420 max
Loss on Ignition (%)C C114 10.0 max Compressive Strength
3 Days, MPa (psi) C109 13.0 (1890) min 13.0 (1890) min 30.1 4370
7 Days, MPa (psi) C110 20.0 (2900) min 20.0 (2900) min 37.1 5380
28 Days, MPa (psi)D C111 25.0 (3620) min 28.0 (4060) min 42.6 6180
Mortar Bar Expansion C1038 (%) C1038 0.020 max 0.020 max
ASTM Test
Method
Early Stiffening, Final Penetration (%) C451 A 50 min
ASTM Test ASTM Test
Method Method
CaCO3 in Limestone (%) C150 70 min Sulfate ResistanceE
Expansion at 180 Days (%) C1012 0.05 A 0.05
Heat of HydrationF
3 Days, kJ/kg (cal/g) C1702 A 335 (80) max 267.15 (64)
A Not applicable B It is permissible to exceed the specification limit provided that ASTM C1038 Mortar Bar Expansion does not exceed 0.020 % at 14 days.
C This alternative analysis has been qualified in accordance with ASTM C114 and meets requirements of Table 1 D Test result of prior month E ASTM C1012 Sulfate Resistance testing has been performed at WJE, an AASHTO R-18 certified facility.
F ASTM C1702 Heat of Hydration testing has been performed by GCC Pueblo Cement Plant, an AASHTO R-18 certified facility.
GCC cement is warranted to conform at the time of shipment with current ASTM C595/AASHTO M 240/ASTM C1157. No other warranty is made or implied. Having no control over the use of its cements, GCC does not guarantee finished work. GCC is not responsible for any additives not stated in this Material Certification Report.
SPECIAL PHYSICAL REQUIREMENTS
REQUIREMENTS OF LIMESTONE FOR USE IN BLENDED CEMENTS
LIMESTONE
Item
ASTM C595
Spec. Limit Test Result
PHYSICAL OPTIONAL
Item
ASTM C595
Spec. Limit
ASTM C1157
Spec. Limit Test Result
PHYSICAL REQUIREMENTS FOR SPECIAL PROPERTIES ASTM C595/ASTM C1157
Item High Sulfate
Resistance (HS)
Moderate Heat of
Hydration (MH) Test Result
4.5
Equivalent Alkalis in
Portland Cement (%)
0.012
65.6
2.2
2.7
-0.01
C114 A 0.20
3.4 3.11
Item
ASTM C595 IL
Spec. Limit Test Result Item
ASTM C595 IL
Spec. Limit
ASTM C1157 GU
Spec. Limit Test Result
19.4 446
4.0 1.4
CHEMICAL PHYSICAL
600 S. Cherry Street, Suite 1000, Glendale, CO 80246
Customer Service: (800) CALL GCC / (800) 225-5422
MATERIAL CERTIFICATION REPORT
ASTM C595 IL(10) HS MH
GCC TRIDENT IS AN ISO 9001 CERTIFIED FACILITY
STANDARD REQUIREMENTS ASTM C595/AASHTO M 240/ASTM C1157
RIMROCK ENGINEERING, INC.
RIMROCK ENGINEERING, INC. 5440 Holiday Avenue. Billings, MT 59101. Phone: 406.294.8400 Fax: 406.294.8405
PHYSICAL PROPERTIES OF AGGREGATE
Client Name: Century Companies, Inc. Project No: 18257 Address: P.O. Box 579 Date of Report: 2/15/2023 Lewistown, Montana 59457
Project Name: 2023 Concrete Aggregate Tests Sample No: See Below
Sampled By: Century Companies, Inc. Type of Aggregate: See Below Submitted By: Century Companies, Inc. Source of Sample: Tampico Pit
GRADATION ASTM C-136, C-117
Lab No. 23-368-01
ASTM C-33 Size 67 Specifications
Lab No. 23-368-02 ASTM C-33 Fine
Aggregate Specifications Description
Tampico Concrete Rock Description
Tampico Concrete Sand
1” 100 100 3/8” 100 100
3/4” 96 90-100 No. 4 99 95-100
1/2" 56 -- No. 8 85 80-100
3/8” 35 20-55 No. 16 69 50-85
No. 4 1 0-10 No. 30 52 25-60
No. 8 0 0-5 No. 50 18 5-30
-- -- -- No. 100 3 0-10 -- -- -- No. 200 0.6 0-3 / 0-5
Fineness Modulus 2.7 ASTM C - 33 Specifications - 2.3 - 3.1 SPECIFIC GRAVITY and ABSORPTION ASTM C-127, C-128
Bulk, SSD Coarse Aggregate
2.61 Fine Aggregate
2.60
Absorption, % 1.0 1.5
BULK DENSITY (UNIT WEIGHT) ASTM C-29
Unit Weight, Rodded, lbs./ft³ 103.1 --
LOS ANGELES ABRASION ASTM C-131
Grading B ASTM C-33 Specification Loss, % 23 50% Maximum
MAGNESIUM SULFATE SOUNDNESS ASTM C-88
Coarse, Loss, % * ASTM C-33 Specification Fines, Loss % * 12% Maximum
ORGANIC IMPURITIES ASTM C-40
Lighter than Standard Color No. 3 < 3 CLAY LUMPS and FRIABLE PARTICLES ASTM C-142
% 0.2 ASTM C-33 Specifications - 3% Maximum
LIGHTWEIGHT PARTICLES ASTM C-123
% 0.04 ASTM C-33 Specifications - 1% Maximum
*Test in progress
Reviewed By:_____________________________________________