Schedule_of_Items.pdf
PDF 178 KB Posted
- Attached to
- DEAD HORSE DAM RECON 2019 Federal contract opportunity
- Solicitation number
- 140L3619R0001
About this file
Schedule of Items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Past_Performance_Questionnaire.pdf | ||
| Dead_Horse_Dam_Drawings_Final_11x17.pdf | ||
| Dead_Horse_TechSpecs_8-7-18_mjm.pdf | ||
| Sol_140L3619R0001.pdf | ||
| Davis_Bacon_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. Description Unit Price Total Cost
10 Mobilization & Preparatory Work (10%) 1 LS $
11 Topsoil Stripping & Replacement 1 LS $
12 Outlet Demolition 1 LS $
13 Common Excavation 3,387 CY $
14 Inlet Muck Excavation 180 CY $
15 Outlet Muck Excavation 240 CY $
16 Compacted Embankment 2,755 CY $
17 Filter Sand 274 CY $
18 Drain Gravel 107 CY $
19 Dam Crest Road Gravel 951 Ton $
20 Riprap Slope Protection 268 Ton $
21 Riprap Outlet Basin 1 LS $
22 Spillway Tower 1 LS $
23 Outlet Conduit 1 LS $
24 Stabilization Fabric 300 SY $
25 Water Control/Dewatering 1 LS $
26 Lime Amended Embankment 1,500 CY $
101A Alternate 1 - Mobilization and Preparatory Work (10%) 1 LS $
101B Alternate 1 - Downstream Embankment Common Excavation 6,655 CY $
101C Alternate 1 - Downstream Embankment Compacted Embankment 7,763 CY $
101D Alternate 1 - Downstream Embankment Topsoil Stripping & Replacement 1 LS $
BASE SUBTOTAL
ALTERNATE 1 SUBTOTAL
TOTAL ESTIMATED COST
Dead Horse Dam Reconstruction
Bureau of Land Management
Schedule of Items
Quantity
\\ilmmtso3ds1\so\users\blinford\My Documents\Contract Files 2018\Dead Horse Dam\DEAD HORSE BID SCHEDULE 8-8-18 mjm - Dead Horse-Final