DRAFT ACM REPORT - SHOSHONE OFFICE RESTROOM REMODEL

View the file

Other files for this federal contract opportunity

Other files attached to SHOSHONE OFFICE RESTROOM REMODEL, newest first.
File Type Posted
COMBINEDSETDWGS.pdf PDF
COMBINEDSPECIFICATIONS.pdf PDF
SF-24_Bid_Bond.pdf PDF
Sol_140L2618R0002.pdf PDF
Shoshone_Office_Restroom_Remodel_Bid_Schedule.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS-CONTAINING MATERIAL (ACM) SURVEY AND

ABATEMENT COST ESTIMATE

BLM Task Order 135, BPA L09PA00228 (NAB060001 Legacy Number)

L1053 - Office Building

42.93208 / -114.41353

Shoshone Field Office, Idaho

Report Date March 5, 2012 Site Survey Date January 4, 2012, 2011 ACM Identified in Building?* Yes ACM Abatement Cost Estimate* *Subject to the assumptions and limitations as described in the following report.

Submitted by:

Aarcher, Inc.

910 Commerce Road Annapolis, Maryland 21401 410-897-9100 Program Manager: Mark R. Serio, P.G.

Submitted to:

U.S. Department of the Interior Bureau of Land Management (BLM) Building 50, Denver Federal Center Denver, Colorado 80225-0047 Attn: Suzanne Buntrock, PE

DRAFT

Tetra Tech

3801 Automation Way, Suite 100, Fort Collins, Colorado 80526

Tel 970.223.9600 Fax 970.223.7171 www.tetratech.com

March 5, 2012

Aarcher, Inc.

Mr. Mark Serio Vice President 910 Commerce Road Annapolis, Maryland 21401

RE: Asbestos-Containing Materials Survey and Asbestos Abatement Cost Estimates L1053 - Office Building Shoshone Field Office, Idaho Tetra Tech Project Number 114-182213, Task 101

Dear Mr. Serio:

Tetra Tech is pleased to submit the attached Asbestos-Containing Materials Survey and Asbestos Abatement Cost Estimates report for the above-referenced site. This report includes the scope of work, procedures and methodologies, tables, figures, analytical laboratory results, and abatement cost estimate for each asbestos-containing material identified during this survey.

Tetra Tech appreciates the opportunity to perform these services for Aarcher, Inc. (AARCHER) and we look forward to working with you in the future. If you have questions or comments regarding the information in this report or if we can be of further assistance please do not hesitate to contact the Tetra Tech Fort Collins, Colorado office at (970) 223-9600.

Sincerely, Tetra Tech

Ryan Egan Mark Daley AHERA Accredited: AHERA Accredited:

Building Inspector/Management Planner Building Inspector/Management Planner Project Designer/Supervisor

Daniel Lawrence AHERA Accredited:

Building Inspector

Draft

L1053 - Office Building Shoshone Field Office, Idaho i

TABLE OF CONTENTS

1.0 PURPOSE AND SCOPE OF SERVICES

2.0 GENERAL SITE CONDITIONS

3.0 REGULATORY STANDARDS

4.0 ASBESTOS-CONTAINING MATERIALS SURVEY AND ASBESTOS ABATEMENT COST

ESTIMATES

4.1 Homogeneous Materials

4.2 Hazard Assessment Factors

4.3 Sampling Strategy

4.4 Suspect Asbestos-Containing Material

4.5 Laboratory Analytical Results

5.0 ASBESTOS-CONTAINING MATERIALS SURVEY AND ASBESTOS ABATEMENT COST

ESTIMATES SUMMARY TABLE

6.0 CONCLUSIONS

7.0 ASSUMPTIONS AND LIMITATIONS

LIST OF APPENDICES

Appendix A: ACM Laboratory Analytical Results Appendix B: Site Drawing Appendix C: Inspector and Laboratory Accreditations Appendix D: ACM Photographs

1.0 PURPOSE AND SCOPE OF SERVICES

The purpose of this project was to conduct an Asbestos-Containing Materials (ACM) survey and provide Asbestos Abatement Cost Estimates for identified ACM located in the L1053 - Office Building located at Shoshone Field Office, Idaho. Tetra Tech provided services as outlined below:

Conduct a representative asbestos survey of the identified building, which includes the following:

1. Review existing asbestos reports for the building areas, if provided;

2. Survey all of the interior and exterior areas of the building, including building roofs;

3. Identify accessible suspect ACMs using Environmental Protection Agency (EPA) Asbestos

Hazard Emergency Response Act (AHERA) protocols;

4. Collect and analyze bulk samples of suspect friable and non-friable materials to eliminate suspect materials as asbestos containing;

5. Quantify ACMs, including material condition and location; and

6. Provide ACM abatement cost estimates for ACM identified during the survey of the building.

2.0 GENERAL SITE CONDITIONS

The building is a one story, wood and concrete framed structure, situated on a slab-on-grade foundation, covered by a vinyl and foam roof. Reportedly, the building was constructed in 1975 and is approximately 8,741 gross square feet. Interior finishes include carpet, vinyl sheet flooring, vinyl wall covering, ceiling panels and textured drywall and compound. Exterior finishes consist of wood, brick and stone.

3.0 REGULATORY STANDARDS

The survey was performed in accordance with Federal, State and local rules for conducting asbestos surveys to meet Occupational Safety and Health Administration (OSHA) and United States Environmental Protection Agency (EPA) / National Emission Standards for Hazardous Air Pollutants (NESHAP) requirements. The work was also performed in general accordance with AARCHER Subcontract Number 020004-S-TT, dated September 18, 2011 and Task Orders 020004-S-TT-01, dated September 30, 2011 and 020004-S-TT-02, dated January 19, 2012.

4.0 ASBESTOS-CONTAINING MATERIALS SURVEY AND ASBESTOS

ABATEMENT COST ESTIMATES

Tetra Tech representatives Mr. Ryan Egan, Mr. Daniel Lawrence, and/or Mr. Mark Daley conducted the asbestos survey of the building on January 4, 2012. Mr. Egan is an AHERA accredited Building Inspector, Management Planner, Project Designer and Supervisor. Mr.

Daley is an AHERA accredited Building Inspector and Management Planner. Mr. Lawrence is an AHERA accredited Building Inspector. All field work was performed by and/or under the guidance of Mr. Ryan Egan.

The scope of the Asbestos-Containing Materials Survey included all of the accessible suspect building materials and finishes of the interior and exterior areas of the building, including building roofs. If ACM was identified in the building, Asbestos Abatement Cost Estimates were provided for each identified material.

Previous ACM survey reports for the building were not made available for review.

The building areas were visually inspected for the presence of building materials that are suspected to contain asbestos. Bulk samples of identified suspect ACMs were collected and placed into individual containers for transport to a National Voluntary Laboratory Accreditation Program (NVLAP)/American Industrial Hygiene Association (AIHA)-accredited laboratory for analysis. Materials visibly identified as non-asbestos (fibrous glass, foam rubber, wood, metal, etc.) were not sampled. The asbestos survey consisted of three basic procedures: 1) conducting a visual inspection of the structure and identifying functional spaces; 2) identifying homogeneous material areas of suspect surfacing, thermal system insulation, and miscellaneous materials; and 3) sampling accessible, friable and non-friable suspect materials.

4.1 Homogeneous Materials

Prior to collecting any samples, homogenous materials were identified and listed to develop a sampling strategy. A homogeneous material sampling area can be described as one or more areas of material that are similar in appearance and texture and that have the same installation date and function. The actual number of samples collected from each homogeneous sampling area was based upon criteria detailed in the following sections.

4.2 Hazard Assessment Factors

From the list of suspect homogeneous materials, a physical assessment was performed for each material on the list. A physical assessment includes evaluating the condition, assessing the potential for disturbance, and determining the friability of each material. Friability is a term used to describe the ease in which a building material inherently lends itself to disturbance. By definition, "friable" materials are those that can be crumbled or reduced to powder by hand pressure when dry. Each material on the list was further classified into one of three categories, which have specific sampling requirements for each category.

Surfacing Materials: Refers to spray-applied or troweled surfaces such as plaster ceilings and walls, fireproofing, textured paints, textured plasters, and spray applied acoustical surfaces.

Thermal System Insulation Refers to insulation used to inhibit heat gain or loss on pipes, boilers, tanks, ducts, and various other building components.

Miscellaneous Materials Refers to friable and non-friable products and materials that do not fit in any of the above two categories such as resilient floor covering, baseboards, mastics, adhesives, roofing material, caulking, glazing, and siding. This category also contains wallboard and joint compound wall systems and acoustical ceiling tile.

All confirmed ACMs were then assessed by their condition as good (no visible damage or showing only very limited damage or deterioration), damaged (less than 25% localized damage or 10% distributed damage), significantly damaged (25% or greater localized damage or 10% or greater distributed damage) per Title 40 Code of Federal Regulations Part 63.

4.3 Sampling Strategy

The asbestos inspection was conducted in general accordance with the AHERA requirements using a minimum number of samples collected for each homogenous material, which also meet the sampling requirement found in 29 CFR 1926.1101.

If the analytical results indicated that all the samples collected per homogenous material did not contain asbestos, then the homogenous material would be considered a non-ACM. However, if the analytical results of one or more of the samples collected per homogenous material indicate that asbestos is present in quantities of greater than 1 percent asbestos by weight (as defined by EPA), all of the homogenous material would be treated as an ACM regardless of any other analytical results. Material which can visually be determined to be non-asbestos (i.e., fibrous glass, foam rubber, metal, etc.) by the accredited inspector are not required to be sampled.

Miscellaneous materials require adequately representative sampling, which is typically done by collecting from one to three samples per material. Inspectors typically rely on other survey observations such as the condition, friability, and quantity of material to determine what would be a sufficient amount of samples to accurately evaluate the presence or absence of asbestos content. For this survey, three samples per each homogenous miscellaneous material were collected.

Actual collection of a bulk asbestos sample involves physically removing a small piece of material and placing it in a marked, airtight container. Sample containers are marked with a unique identification number, which is also noted in the field notes.

4.4 Suspect Asbestos-Containing Material

27 bulk asbestos samples were collected from the building and 35 sample layers were analyzed by Polarized Light Microscopy (PLM) based on the number of distinct layers (materials) associated with each bulk sample. For example, floor tile and associated mastic are collected as one bulk sample but are analyzed as two distinct materials by the asbestos laboratory, as required by NVLAP.

4.5 Laboratory Analytical Results

Bulk samples were analyzed by Reservoirs Environmental, Inc. analytical laboratory located in Denver, Colorado, using PLM according to EPA method 600/R-93/116. This laboratory participates in the NVLAP, a quality assurance program for PLM.

Any material that contains greater than 1 percent (>1%) asbestos by PLM is considered an ACM and must be handled according to OSHA, EPA, and applicable state and local regulations.

In addition, the U.S. Occupational Safety and Health Administration (OSHA) define asbestos as building materials containing between one tenth of one percent and one percent (0.1%-1%).

For friable materials, when the amount of asbestos in the sample material is reported as “None- Detected” by PLM analysis, no further verification of the sample results by Point Counting Methodology is recommended.

For friable materials, when the amount of asbestos in the sample material is reported as “Trace Asbestos Detected” or less than 10% asbestos by PLM analysis, the client may either assume the amount to be greater than 1% and treat the material as ACM or require further verification of the amount by Point Counting Methods. If the result obtained by Point Counting is different from the result obtained by PLM analysis, the Point Count Method result should be used.

For non-friable materials, when the amount of asbestos in the sample material is reported as greater than 1% asbestos by PLM analysis, no further verification of the sample results by alternative methods of identification such as Transmission Electron Microscopy (TEM) Chatfield Method is recommended.

For non-friable materials such as vinyl/asphaltic products (floor tiles/floor sheeting, mastics, shingles, etc.), where small, thin asbestos fibers may have been potentially milled into the nonorganic binder matrix, when the amount of asbestos in the sample material is reported as “None-Detected” by PLM analysis, due to the difficulty in analyzing such small, thin asbestos fibers in resinously bound materials by PLM analysis, EPA recommends but does not require that these types of materials, which were reported as non-ACMs by PLM, be further analyzed using TEM Chatfield Method. Tetra Tech did not conduct such analysis.

The results of the laboratory analysis are summarized in tabular form in Section 5.0. The laboratory analytical report and corresponding chain-of-custody documents are included in Appendix A. Results are reported in percent asbestos by volume and indicate the types of asbestos. Other common non-asbestos components may also be noted on the analytical reports. A drawing(s) showing bulk sample locations is provided in Appendix B. Inspector and laboratory accreditations are provided in Appendix C, and Appendix D presents photographs of all ACM’s identified in the building (if present).

5.0 ASBESTOS-CONTAINING MATERIALS SURVEY AND ASBESTOS ABATEMENT COST

ESTIMATES SUMMARY TABLE

ACM Bulk Sampling Results

L1053 - Office Building Shoshone Field Office, Idaho

Homogeneous Material

Material Category

Required Number of Samples to be Collected

Number of

Samples Collected

Sample Number(s) Location of Material Condition Friable

(Yes/No)

Approximate Material Quantity

Asbestos Content

ACM

Abatement

Cost Estimate

Vinyl sheet wall covering with inseparable felt backing

M N/A 3 F1.1A-C Conference room and janitor's closet G Yes 525 SF ND $0.00

Vinyl sheet flooring with inseparable felt backing

M N/A 3 F1.2A-C Restrooms and janitor's closet G Yes 85 SF ND $0.00

Vinyl sheet wall covering with inseparable felt backing

M N/A 3 F1.3A-C Restroom 117 G Yes 95 SF 30%

Vinyl sheet flooring with inseparable felt backing

M N/A 3 F1.4A-C Restroom 117 G Yes 95 SF 25%

Suspended ceiling panels M N/A 5 M5.1A-E Ceilings throughout structure G Yes 8,415 SF ND $0.00

Vinyl cove base and mastic M N/A 3 M11.1A-C Wall bases throughout structure G No 22 SF ND $0.00

Textured drywall and compound

SM 7 7 S1.1A-G

Walls and ceilings (includes above ceiling panels) throughout structure

G Yes 14,100 SF ND $0.00

AHERA Guidelines for Determining the Number of Samples to Collect ND = None Detected N/A = Not Applicable

MATERIAL CATEGORY:

M = Miscellaneous Material SM = Surfacing Material TSI = Thermal System Insulation

APPROXIMATE MATERIAL QUANTITIES:

SF = Square Feet LF = Linear Feet Ea = Each

CONDITION:

G = Good D = Damaged SD = Significantly Damaged

Homogeneous Material Category

Homogeneous Material Quantity Number of Samples Required

Surfacing Materials

<1000 SF 3

1000 - 5000 SF 5

>5000 SF 7 or more

Thermal System Insulation No Stipulation 3 (Must also sample all repair patches)

Miscellaneous Materials No Stipulation

Per AHERA, these materials must be sampled "in a manner sufficient to determine whether or not they contain asbestos." To satisfy National Emission Standards for Hazardous Air Pollutants (NESHAP) requirements, a minimum of 3 samples were generally collected.

6.0 CONCLUSIONS

The results of the asbestos survey conducted at the L1053 - Office Building, Shoshone Field Office, Idaho facility building indicate that: two (2) of the accessible suspect building materials sampled were found to contain more than 1% asbestos.

Contractors and employees working in this building should be made aware of the possibility that concealed ACMs may be found during demolition/renovation. They should be advised not to disturb known or suspect ACMs without owner approval.

Any concealed building materials discovered during maintenance or renovation activities, which are suspected to contain asbestos, should be sampled and analyzed to confirm the presence of asbestos prior to disturbing.

The EPA has not prohibited the manufacture and import of miscellaneous materials, such as vinyl floorings, mastics, roofing materials, etc. As a result, any future replacement materials should be checked for the presence of asbestos prior to installation.

7.0 ASSUMPTIONS AND LIMITATIONS

The results, findings, conclusions, and recommendations expressed in the report are based only on conditions that were noted during Tetra Tech’s inspection of the L1053 - Office Building structure located at the Shoshone Field Office, Idaho.

The selection of sample locations and frequency of sampling was based on Tetra Tech’s observations and the assumption that like materials in the same area are homogeneous in content. Limited destructive investigation was conducted as needed. Concealed ACMs may exist in concealed areas not investigated or identified.

The report is designed to aid the client in understanding the extent of ACM issues as they pertain to the “Recognition and Measurement of Asbestos-Related Cleanup Costs,” Technical Bulletin 2006-1, prepared by the Federal Accounting Standards Advisory Board, dated September 28, 2006 and to the renovation/demolition areas of the facility building areas. It should be noted that this report is not a complete Asbestos Abatement Specification or Work Plan.

Our professional services have been performed, our findings obtained, and our conclusions prepared in accordance with customary principles and practices in the fields of environmental science and engineering. This statement is in lieu of other statements either expressed or implied. This report does not warrant against future operations or conditions, nor does it warrant against operations or conditions present of a type or at a location not investigated.

Asbestos abatement cost estimates were obtained from asbestos abatement contractors who have not visited the site and have not seen the ACM to be abated. The costs provided herein, are magnitude estimates of costs with the following assumptions made:

Assumes free and clear access to the work area during working hours.

Assumes one mobilization to complete the abatement of one ACM.

Assumes both Power and water at no cost to contractor.

Assumes protect in place all above ceiling electrical wiring, fire alarm, and WiFi cables.

Does not include the demolition of any building components other than ACM.

Pricing assumes that any required inspections and air testing is provided by the building owner or owner’s representative.

Assumes that no special conditions are added by any State or local regulatory agency.

Work hours 7:00 AM to 5:00 PM Monday through Friday.

Not be held responsible for packaging, moving or damage to items being moved, nor for providing storage and/or inventory of these items. If storage or inventory is needed the owner will provide what is necessary. Responsibility of any personal items is the owner’s.

No delays interfering with the diligent execution of the work beyond the contractor’s control will be encountered.

APPENDIX A

ACM LABORATORY ANALYTICAL RESULTS

Laboratory Code: RES Subcontract Number: NA Laboratory Report: RES 229303-1 Project # / P.O. # 114-182213 Task 101 Project Description:

Ryan Egan

RES 229303-1

Sincerely, Anita Grigg Robert R. Workman Jr.

Bethany Nichols Anya Angst

February 15, 2012

Analyst(s): _________________________ Paul D. LoScalzo Wenlong Liu Michael Scales Adam Humphreys is the job number assigned to this study. This report is considered highly confidential and the sole property of the customer. Reservoirs Environmental, Inc. will not discuss any part of this study with personnel other than those of the client. The results described in this report only apply to the samples analyzed. This report must not be used to claim endorsement of products or analytical results by NVLAP or any agency of the U.S. Government. This report shall not be reproduced except in full, without written approval from Reservoirs Environmental, Inc. Samples will be disposed of after sixty days unless longer storage is requested. If you have any questions about this report, please feel free to call 303-964-1986.

Jeanne Spencer Orr President

Dear Customer, Reservoirs Environmental, Inc. is an analytical laboratory accredited for the analysis of Industrial Hygiene and Environmental matrices by the National Voluntary Laboratory Accreditation Program (NVLAP), Lab Code 101896-0 for Transmission Electron Microscopy (TEM) and Polarized Light Microscopy (PLM) analysis and the American Industrial Hygiene Association (AIHA), Lab ID 101533 - Accreditation Certificate #480 for Phase Contrast Microscopy (PCM) analysis. This laboratory is currently proficient in both Proficiency Testing and PAT programs respectively.

Reservoirs Environmental, Inc. has analyzed the following samples for asbestos content as per your request. The analysis has been completed in general accordance with the appropriate methodology as stated in the attached analysis table. The results have been submitted to your office.

Tetra Tech (Ft. Collins) 3801 Automation Way Ft. Collins CO 80525

BLM - L1053 / Shoshone - Office Building

P: 303-964-1986 F: 303-477-4275

5801 Logan Street, Suite 100 Denver, CO 80216

1-866-RESI-ENV

www.reilab.com

TABLE PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUME

RES Job Number:

Client:

Client Project Number / P.O.:

Client Project Description:

Date Samples Received:

Analysis Type:

Turnaround:

Date Analyzed:

Client Non Non- Sample Sub Asbestos Fibrous Number Physical Part Fibrous Components

Description (%) Mineral Visual Components (%) Estimate (%) (%)

S1.1A EM 861670 A White paint w/ white compound 2 ND 0 100

B White/brown drywall 98 ND 15 85

S1.1B EM 861671 A White paint w/ white compound 2 ND 0 100 B White/brown drywall w/ beige paint 98 ND 15 85

S1.1C EM 861672 A White paint 1 ND 0 100 B White tape 5 ND 95 5 C White compound 3 ND 0 100 D White/brown drywall 91 ND 15 85

S1.1D EM 861673 A White paint w/ white compound 3 ND 0 100 B White/beige paint w/ white/brown drywall 97 ND 15 85

S1.1E EM 861674 A White/multi-colored paint w/ white compound

3 ND 0 100

B White/brown drywall 97 ND 15 85

S1.1F EM 861675 A White/multi-colored paint w/ white compound

3 ND 0 100

B White/brown drywall 97 ND 15 85

S1.1G EM 861676 A White/brown drywall w/ white/multi-colored paint

100 ND 15 85

RESERVOIRS ENVIRONMENTAL, INC.

NVLAP Lab Code 101896-0

TDH Licensed Laboratory # 30-0136

ID Number L A Y E R

Lab

PLM, Short Report 3-5 Day

Asbestos Content

RES 229303-1

February 13, 2012

114-182213 Task 101 BLM - L1053 / Shoshone - Office Building

Tetra Tech (Ft. Collins)

February 8, 2012

ND=None Detected TR=Trace, <1% Visual Estimate Trem-Act=Tremolite-Actinolite Note: Further analysis by TEM is recommended for organically bound material (i.e. floor tile) if PLM results are <1%.

Data QA

RES Job Number:

Client:

Client Project Number / P.O.:

Client Project Description:

Date Samples Received:

Analysis Type:

Turnaround:

Date Analyzed:

Client Non Non- Sample Sub Asbestos Fibrous Number Physical Part Fibrous Components

Description (%) Mineral Visual Components (%) Estimate (%) (%)

RESERVOIRS ENVIRONMENTAL, INC.

NVLAP Lab Code 101896-0

TDH Licensed Laboratory # 30-0136

ID Number L A Y E R

Lab

PLM, Short Report 3-5 Day

Asbestos Content

RES 229303-1

February 13, 2012

114-182213 Task 101 BLM - L1053 / Shoshone - Office Building

Tetra Tech (Ft. Collins)

February 8, 2012

M5.1A EM 861677 A White/gray perlitic ceiling tile 100 ND 80 20

M5.1B EM 861678 A White/gray perlitic ceiling tile 100 ND 80 20

M5.1C EM 861679 A White/gray perlitic ceiling tile 100 ND 80 20

M5.1D EM 861680 A White/gray perlitic ceiling tile 100 ND 80 20

M5.1E EM 861681 A White/gray perlitic ceiling tile 100 ND 80 20

M11.1A EM 861682 A White compound 1 ND 0 100 B Off-white mastic 1 ND 0 100 C Beige cove base 98 ND 0 100

M11.1B EM 861683 A White compound 1 ND 0 100 B Off-white mastic 3 ND 0 100 C Beige cove base 96 ND 0 100

M11.1C EM 861684 A White compound 1 ND 0 100 B Off-white mastic 3 ND 0 100 C Beige cove base 96 ND 0 100

F1.1A EM 861685 A Tan/cream sheet vinyl w/ gray fibrous backing

100 Chrysotile 25 15 60

ND=None Detected TR=Trace, <1% Visual Estimate Trem-Act=Tremolite-Actinolite Note: Further analysis by TEM is recommended for organically bound material (i.e. floor tile) if PLM results are <1%.

RES Job Number:

Client:

Client Project Number / P.O.:

Client Project Description:

Date Samples Received:

Analysis Type:

Turnaround:

Date Analyzed:

Client Non Non- Sample Sub Asbestos Fibrous Number Physical Part Fibrous Components

Description (%) Mineral Visual Components (%) Estimate (%) (%)

RESERVOIRS ENVIRONMENTAL, INC.

NVLAP Lab Code 101896-0

TDH Licensed Laboratory # 30-0136

ID Number L A Y E R

Lab

PLM, Short Report 3-5 Day

Asbestos Content

RES 229303-1

February 13, 2012

114-182213 Task 101 BLM - L1053 / Shoshone - Office Building

Tetra Tech (Ft. Collins)

February 8, 2012

F1.1B EM 861686 Not Analyzed F1.1C EM 861687 Not Analyzed

F1.2A EM 861688 A Tan/brown sheet vinyl w/ gray fibrous backing

100 ND 40 60

F1.2B EM 861689 A Tan/brown sheet vinyl w/ gray fibrous backing

100 ND 35 65

F1.2C EM 861690 A Tan/brown sheet vinyl w/ gray fibrous backing

100 ND 40 60

F1.3A EM 861691 A Yellow/cream sheet vinyl w/ gray fibrous backing & gray mastic

100 Chrysotile 30 0 70

F1.3B EM 861692 Not Analyzed F1.3C EM 861693 Not Analyzed

F1.4A EM 861694 A Yellow/green sheet vinyl w/ gray fibrous backing & gray mastic

100 Chrysotile 25 10 65

F1.4B EM 861695 Not Analyzed F1.4C EM 861696 Not Analyzed

ND=None Detected TR=Trace, <1% Visual Estimate Trem-Act=Tremolite-Actinolite Note: Further analysis by TEM is recommended for organically bound material (i.e. floor tile) if PLM results are <1%.

APPENDIX B

SITE DRAWING

(100)

(102)

(103)

(104)

(105)

(106)

(107)

(108)

(109)

(110)

(111)

(112)

(113)

(114)

(115)

(101)

(116)

(117)

(118)

(119)

(120)

(121)

(122)

(123)

(128)

(129)

(130)

S1.1A

S1.1B

S1.1C

S1.1D

S1.1E

(124)

(125) (126)

(127)

S1.1F

S1.1G

M5.1A

M5.1B

M5.1C

M5.1D

M5.1E

M11.1A

M11.1B

M11.1C

F1.1A

F1.1B

F1.1C

F1.2A

F1.2B

F1.2C

F1.3A-C

F1.4A-C

NORTH

January 2012

Figure 1

Shoshone Field Office - Bldg L1053

Sample Location Map

Project No. 114-182213

Sample Location

NORTH

January 2012

Figure 2

Shoshone Field Office - Bldg L1053

RACM Vinyl Sheet Flooring Location Map

Project No. 114-182213

RACM Vinyl Sheet Flooring

ACM Wall Covering

APPENDIX C

INSPECTOR AND LABORATORY ACCREDITATIONS

United States Department of Commerce National Institute of Standards and Technology

Certificate of Accreditation to ISO/IEC 17025:2005

BULK ASBESTOS FIBER ANALYSIS

Denver, CO

NVLAP LAB CODE: 101896-0

Reservoirs Environmental, Inc.

is accredited by the National Voluntary Laboratory Accreditation Program for specific services, listed on the Scope of Accreditation, for:

This laboratory is accredited in accordance with the recognized International Standard ISO/IEC 17025:2005.

This accreditation demonstrates technical competence for a defined scope and the operation of a laboratory quality management system (refer to joint ISO-ILAC-IAF Communique dated January 2009).

2011-07-01 through 2012-06-30

Effective dates For the National Institute of Standards and Technology

NVLAP-01C (REV. 2009-01-28)

APPENDIX D

ACM PHOTOGRAPHS

Site & ACM Photographs Building L1053 - Office Building Shoshone Field Office - Idaho

Photograph 1 – ACM Vinyl Sheet Wall Covering

Photograph 2 – ACM Vinyl Sheet Flooring