Sol_140L1722R0004_Amd_0001.pdf

PDF 91 KB Posted

Attached to
BLM-CO Mud Springs Campground Improvements Federal contract opportunity
Solicitation number
140L1722R0004
Issued by
Department of the Interior Bureau of Land Management Colorado Region

About this file

This solicitation seeks proposals for campground improvement work on federal land. The selected contractor will demolish and dispose of existing structures, install new restrooms, water systems, and recreational amenities. Additional scope includes constructing parking areas, walkways, and placing aggregate surfacing. The work site is Mud Springs Campground in Colorado. The period of performance is September 2022 through May 2023, with an estimated budget between $500,000 to $1,000,000. Responses are due by the closing date to the Bureau of Land Management contracting officer. Eligible small businesses are encouraged to respond.

View the file

Other files for this federal contract opportunity

Other files attached to BLM-CO Mud Springs Campground Improvements, newest first.
File Type Posted
Attachment_5_-_Wage_Determination.pdf PDF
Attachment_4_1_-_Specifications_-_updated.pdf PDF
Attachment_2_-_Materials_Quantities.pdf PDF
Attachment_6_-_Pre-Bid_Sign_In.pdf PDF
Attachment_3_-_Schedule_of_Items_-_Worksheet.pdf PDF
Sol_140L1722R0004.pdf PDF
Attachment_1_-_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L1722R0004 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LRA

LAKEWOOD CO 80215

2850 YOUNGFIELD STREET

COLORADO STATE OFFICE

06/13/20220001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/13/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

BLM-CO - Mud Springs Campground Improvements - Questions and Answers

Q1: My supplier tells me that there is not enough (361 @ 3¿ and 48 @ 4¿) RED or TAN granite boulders available in the valley at any given time. My questions are: Will the government accept an alternate boulder type/color? And, will the alternate be of the same material, granite?

A1: The Government has contacted a local supplier and he verified that they would be able to supply this quantity with a few weeks notice. We will not accept an alternate type or color of boulder from that specified, except for boulders with a slight greyish tint.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

David Thomas

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L1722R0004/0001

Q2: 1. Is there a ¿buy America¿ requirement for the waterline fittings and the wire rope?

A2: Yes, the buy America requirement applies to all construction material unless you request a waiver and it is approved prior to award. See I.2

FAR 52.225-9 BUY AMERICAN¿CONSTRUCTION MATERIALS

(NOV 2021) for details.

Q3: Since clearing & grubbing is incidental to the work and there are no quantities outlined in the project documents, I would assume that the construction should take place so as to not damage/remove any of the aspen trees. Does the government foresee any of the existing aspen trees to be removed?

A3: Yes, it is anticipated that some of the Aspen trees fall within the proposed work areas and will need to be removed. Trees that fall outside of the proposed work areas shall not be removed or damaged.

Q4: Is the contractor responsible for replacing the campsite, the campground and the roadway signs/markers?

A4: No, the contractor is not responsible for replacing the signs/markers after removal. The government shall shall be responsible for the re-installation of those items.

Q5: Does the existing waterline have to be removed?

A5: No, the buried waterline does not need to be removed. Only items associated with the waterline as described in Section 02223, 3.2, C are to be removed.

Period of Performance: 09/06/2022 to 05/26/2023