This document contains questions and answers related to a federal solicitation for gravel surfacing services. The solicitation is for approximately 9,973 cubic yards of surface aggregate to be delivered and laid on an existing road operated by the Bureau of Land Management. Bidders are responsible for obtaining their own water source and any necessary permits. The gravel must meet specification requirements and be tested by a third party, who will recommend an appropriate chemical binder to be mixed in. The BLM will prepare the road surface in advance but no other preparation or surveying is included in the contract scope. Pricing is to be provided per cubic yard of aggregate delivered and installed. There are no liquidated damages specified.

View the file

Other files for this federal contract opportunity

Other files attached to GREEN MOUNTAIN GRAVEL, newest first.
File Type Posted
Attachment 1 - Specifications_0001.pdf PDF
Sol_140L0620R0044_Amd_0001.pdf PDF
Attachemnt 7 - SF1442 Continuation Pages_0001.pdf PDF
Attachment 5 - Pricing Worksheet_0001.xlsx XLSX spreadsheet
Attachment 4 - DOL Wage Determination.pdf PDF
Attachment 3 - Work Site Maps.pdf PDF
Attachment 5 - Pricing Worksheet.xlsx XLSX spreadsheet
Attachment 1 - Specifications.pdf PDF
Sol_140L0620R0044.pdf PDF
Attachment 2 - Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: 140L0620R0044

Title: Green Mountain Gravel

Attachment 6 - Contractor Questions and Answers (Q&As)?

Question 1: Could you give some clarification on the bid form/worksheet. There are no estimated quantities to base the bid on. Also, where do we put the CY price of gravel.

Response: The estimated quantity of surface aggregate for this project is 9,973 cubic yards. Attachment

5 – Pricing Worksheet has been revised in Amendment 0001 to add an estimated quantity column and

Price Per Unit column.

Question 2: The specs show payment based on the CY of gravel delivered?

Response: Correct. The estimated variation of quantity clause (52.211-18) applies to Section 02730

Aggregate Surfacing in Attachment 1 - Specifications.

Question 3: Do we had a water source?

Response: no, it was the contractor's responsibility to provide a water source and to get any permits that would be needed with a water source.

Question 4: Will mag chloride would work for the binder?

Response: The gravel was to be tested by a 3rd party and the lab would give us a recommendation of binder.

Question 5: Is the road being prepped by the BLM?

Response: The BLM would coordinate with the contractor and about 1 to 2 weeks before the gravel was being laid down, the BLM would shape the road surface.

Question 6: When would the job start?

Response: According to the solicitation, after the NTP is issued with a specified POP (365 days?).

Question 7: Do you have a preference on gravel pits we use?

Response: No. As long as all gravel meets the required specifications.

Question 8: Do compaction crews and area/station for them.

Response: The Government is uncertain what you are asking for this question.

Question 9: In the packet, there is a section for Stabilizing Compounds. Will we be required to put provide the stabilizing compounds once there is a recommendation? Or, is it only a recommendation?

Response: Per Section 02730, 2.2.C: Aggregate shall be mixed with an approved chemical mixture as indicated by test recommendation. Also Per Section 02730 3.1.F Stabilization shall be according to manufacturer’s recommendation or the recommendation of the laboratory. - The Contractor is responsible for providing this chemical and mixing it into the aggregate per the manufacture's and laboratory recommendations.

Question 10: In the packet, it mentions a surveyor. Is the surveyor to be provided by us or by the

BLM/state?

Response: Surveying is not needed in this contract and is not mentioned in the Specifications. The road is existing and the Government will prepare the road surface to the correct profile.

Question 11: Are there Liqudated damages for this contract?

Response: No.