140G0320Q0155 Amendment 5 - Final Q and A_0005.pdf

PDF 113 KB Posted

Attached to
DESIGN-BUILD CONCRETE ADA RAMPCONSTRUCTION PROJE Federal contract opportunity
Solicitation number
140G0320Q0155
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

View the file

Other files for this federal contract opportunity

Other files attached to DESIGN-BUILD CONCRETE ADA RAMPCONSTRUCTION PROJE, newest first.
File Type Posted
Sol_140G0320Q0155_Amd_0005.pdf PDF
Sol_140G0320Q0155_Amd_0004.pdf PDF
Sol_140G0320Q0155_Amd_0003.pdf PDF
Sol_140G0320Q0155_Amd_0002.pdf PDF
Sol_140G0320Q0155_Amd_0001.pdf PDF
Sol_140G0320Q0155.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140G0320Q0155 Amendment 5 P. 2 of 2

Solicitation 140G0320Q0155 Amendment 5 – Poured Concrete ADA Ramp Vendor Questions and USGS Responses

QUESTION: Do we need to follow the American barricades Act and the American Disabilities Act in design and installation?

ANSWER: The design must be compliant with both the Architectural Barriers Act and the American

Disabilities Act.

QUESTION: Does the concrete need to be broom finish?

ANSWER: Yes.

QUESTION: Do we have to strip the existing coating currently on the staircase?

ANSWER: On the stairs, no; on the platform, yes.

QUESTION: If so, do we have to recoat the entire newly poured concrete?

ANSWER: No

QUESTION: Are we being allowed to tie into existing staircase to create new landing and then ramp detail?

ANSWER: Yes

QUESTION: Does the garden area in questions need to be graded back to the height of the current asphalt curb?

ANSWER: This is design dependent.

QUESTION: During design stage will we be allowed extra time for proper survey details and access to the building to determine all threshold heights?

ANSWER: Yes

QUESTION: Are the quotes really due on Labor Day?

ANSWER: Yes; this is to allow maximum time to the vendors. The Contracting Officer will look at them Tuesday morning.