Sol_140G0118Q0003.pdf

PDF 363 KB Posted

Attached to
HOT SPRING HIGHWAY BYPASS Federal contract opportunity
Solicitation number
140G0118Q0003
Issued by
Department of the Interior US Geological Survey

About this file

140G0118Q0003

View the file

Other files for this federal contract opportunity

Other files attached to HOT SPRING HIGHWAY BYPASS, newest first.
File Type Posted
Attachment_E_WH347.pdf PDF
Attachment_C_Release_of_Claims_DI-137.doc DOC document
Attachment_A_DRILL_SITES.pdf PDF
Attachment_B_AR53.pdf PDF
Attachment_D_Statement_and_Acknowledgement__Form_1413.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

USGS OAG RESTON ACQUISITION BRANCH

205 NATIONAL CENTER

12201 SUNRISE VALLEY DRIVE

RESTON VA 20192

GRB

Sheryl Carriere, Contracting Officer by eMail at carrieres@usgs.gov

Sheryl Carriere 703-648-7390

110/18/2017

140G0118Q0003

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 60 calendar days and complete it within ________________ ________________ calendar days after receiving

Clause 52.211-10

11/06/2017

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USGS OAG RESTON ACQUISITION BRANCH

205 NATIONAL CENTER

RESTON VA 20192

GRB

Sheryl Carriere

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 34

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140G0118Q0003

This requirement is for installation of (7) monitoring wells in the proposed Highway Bypass

Area near Hot Springs, AR per Performance Based

Work Statement. The goal is to collect hydrogeologic information to increase the understanding of shallow groundwater in route of the proposed area and to identify potential effects of shallow aquifer systems that serves as part of the HOSP Thermal Springs Area.

*Note: See Section L. INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS. Please e-mail your entire offer to carrieres@usgs.gov. Include

140G118Q0003 and your company name in the subject line.

**Please complete and return the SF 1442, Pages

1-3, complete blocks 14, 15,16, 17, 18, 19 and

20a-c with your offer.

Provide your Company D&B

Number:___________________________________

Delivery: 60 Days After Notice to Proceed

Delivery Location Code: 0006366830

USGS Arkansas Water Science Center

401 Hardin Road

Little Rock AR 72211 US

FOB: Destination

00010 SERVICES, NON-PERSONAL TO PROVIDE ALL PLANT,

EQUIPMENT, LABOR AND MATERIALS(UNLESS OTHERWISE

PROVIDED HEREIN) NECESSARY TO PERFORM

Installation and drilling of 7 gage wells in accordance with the clause entitled "Performance

Work Statement"

Note: Line Item Pricing should be fixed priced for (7) wells- 75 feet deep.

00020 Overage depths greater than 75 feet up to 400 feet - Provide fixed priced per foot

Questions regarding this solicitation should be emailed to Sheryl Carriere @ carrieres@usgs.gov

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

140G118Q0003 Page 4 of 34

SECTION A. SCHEDULE OF SUPPLIES/SERVICES

Page intentionally left blank

140G118Q0003 Page 5 of 34

SECTION A. SCHEDULE OF SUPPLIES/SERVICES 1

SECTION B. SUPPLIES OR SERVICES AND PRICES/COSTS 8

B.1. Schedule of Supplies/Services 8 B.2. Contract Type 8

SECTION C. DESCRIPTIONS/SPECIFICATION/STATEMENT OF WORK 8

C.1. Performance Work Statement 8 C.2. Performance Measurements & Deliverables 10 C.3. Green Acquisition 10 C.4. GS0342 Hazardous Material Identification March 2008 11 C.5. GS0343 Energy Efficient Products March 2008 11 C.6. GS0346 Construction Waste Management March 2008 11

SECTION D. PACKAGING AND MARKING 12

SECTION E. INSPECTION AND ACCEPTANCE 12

E.1. 52.246-12 Inspection - Dismantling, Demolition, or Removal of Improvements (AUG 1996) 12

SECTION F. DELIVERIES AND PERFORMANCE 12

F.1. Deliverables 12 F.2. Period of Performance 13 F.3. Place of Performance 13 F.4. 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) 13 F.5. 52.242-14 Suspension of Work (APR 1984) 13 F.6. GS0919 Legal Holidays January 2002 13 F.7. GS1125 Schedule of Prices (Construction) July 2001 14 F.8. GS1354 List of Subcontractors(Constructin) July 2001 14

SECTION G. CONTRACT ADMINISTRATION DATA 14

G.1. Contract Administration Requirements 14 G.2. DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Internet Payment Platform

(IPP) (September 2011) 14 G.3. Unilateral Deobligation of Unexpended Funds (May 2013) 15 G.4. 52.000S-5079 Technical Liaison - Technical Direction October 1997 15

SECTION H. SPECIAL CONTRACT REQUIREMENTS 15

H.1. 52.900S-1152 Drilling-Government Representative October 1997 15 H.2. 52.900S-1153 Drilling-Site Prep Restoration October 1997 16 H.3. 52.900S-1154 Drilling-Permits October 1997 16 H.4. 52.900S-1155 Drilling-Toilet Facilities October 1997 16 H.5. 52.900S-1156 Drilling-Abandoned Hole October 1997 16 H.6. 52.900S-1157 Drilling-Contractor Representative May 2005 16 H.7. 52.900S-1160 Drilling-Drilling Equipment October 1997 16 H.8. 52.900S-1161 Drilling-Government Liability for Damage October 1997 16 H.9. 52.900S-1162 Drilling-Responsibility for Damage to Contractors Equip. October 1997 16 H.10. 52.900S-1163 Drilling-Safety and Health October 1997 17 H.11. 52.900S-1164 Drilling-Labor, Materials October 1997 17 H.12. 52.900S-1165 Drilling-Compliance with Applicable Laws October 1997 17 H.13. 52.900S-1166 Drilling-Investigation October 1997 17 H.14. 52.900S-1167 Drilling-Contractor Responsibility October 1997 17 H.15. 52.900S-1169 Drilling-Contractor Evaluation October 1997 17 H.16. 52.900S-1171 Drilling-Notice to the Government of Delays October 1997 18 H.17. 52.900S-1172 Drilling-Preaward October 1997 18 H.18. 52.900S-1173 Drilling-Representative of the Government October 1997 18 H.19. GS1315 Drill Site Protection and Restoration July 2001 18 H.20. GS1316 Drilling Down Time July 2001 18 H.21. GS0917 Scheduling of Daily Work Hours July 2001 18 H.22. GS1310 Organizational Conflicts of Interest—General July 2001 18 H.23. GS1326 Indemnity (July 2001) 19 H.24. GS1338 Notice to the Government of Delays (July 2001) 19 H.25. GS1346 Compliance with Occupational Safety and Health Act -- Government-Owned Facilities/Equipment April

2003 19 H.26. GS1348 Accident Reporting (April 2003) 19

140G118Q0003 Page 6 of 34

H.27. GS1440 Wage Determination Applicable(July 2001) 19 H.28. Incorporation of Contractor Proposal into Government Contract 19

SECTION I. CONTRACT CLAUSES 19

I.1. 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2015) 19 I.2. 52.204-19 – Incorporation by Reference of Representations and Certifications (DEC 2014) 20 I.3. 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or

Proposed for Debarment (OCT 2015) 20 I.4. 52.211-13 Time Extensions (SEP 2000) 20 I.5. 52.213-4 Terms and Conditions – Simplified Acquisitions (Other Than Commercial Items) (JAN 2017) 20 I.6. 52.215-8 Order if Precedence-Uniform Contract Format(OCT 1997) 20 I.7. 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 20 I.8. 52.219-28 Post-Award Small Business Program Rerepresentation (JUL 2013) 20 I.9. 52.222-6 Construction Wage Rate Requirements (MAY 2014) 20 I.10. 52.222-7 Withholding of Funds (MAY 2014) 20 I.11. 52.222-8 Payrolls and Basic Records (MAY 2014) 20 I.12. 52.222-9 Apprentices and Trainees (JUL 2005) 20 I.13. 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 20 I.14. 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 20 I.15. 52.222-12 Contract Termination - Debarment (MAY 2014) 20 I.16. 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) 20 I.17. 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 20 I.18. 52.222-15 Certification of Eligibility (MAY 2014) 20 I.19. 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 20 I.20. 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2015) 21 I.21. 52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997) - Alternate I (JUL 1995) 21 I22. 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (MAY 2008)21 I.23. 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving(Aug 2011) 21 I.24. 52.225-9 Buy American Actg-Construction Materials(MAY 2014) 21 I.25. 52.227-4 Patent Indemnity--Construction Contracts (DEC 2007) 23 I.26. 52.228-2 Additional Bond Security(OCT 1997) 24 I.27. 52.228-11 Pledge of Assets (JAN 2012) 24 I.28. 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 24 I.29. 52.228-13 Alternative Payment Protections (Jul 2000) 24 I.30. 52.228-14 Irrevocable Letter of Credit (NOV 2014) 24 I.31. 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 24 I.32. 52.232-23 Assignment of Claims (MAY 2014) 24 I.33. 52.232-27 Prompt Payment for Construction Contracts(MAY 2014) 24 I.34. 52.236-2 Differing Site Conditions (APR 1984) 24 I.35. 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 25 I.36. 52.236-5 Material and Workmanship (APR 1984) 25 I.37. 52.236-7 Permits and Responsibilities (NOV 1991) 25 I.38. 52.236-17 Layout of Work (APR 1984) 25 I.39. 52.236-26 Preconstruction Conference (FEB 1995) 25 I.40. 52.243-5 Changes and Changed Conditions (APR 1984) 25 I.41. 52.246-21 Warranty of Construction (MAR 1994) 25 I.42. 52.246-21 Warranty of Construction (MAR 1994) - Alternate I (APR 1984) 25 I.43. 52.252-2 Clauses Incorporated by Reference (FEB 1998) 25 I.44. GS1452.04-70 Release of Claims(JUL 1996) 26 I.45. 1452.228-70 Liability Insurance – Department of the Interior (JUL 1996) 26

SECTION J. LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS 26

J.1. Attachment A - Exhibit A Figure 1-12b 26 J.2. Attachment B - Davis Bacon Act Wage Determination 26 J.3. Attachment C – DI-137 Release of Claims 26 J.4. Attachment D – Standard Form 1413 Statement and Acknowledgement 26 J.5. Attachment E – Form WH-347Wage and Hour Division 26

SECTION K. REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS

K.1. 52.204-8 Annual Representations and Certifications (JAN 2017) 26

SECTION L. INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS 26

140G118Q0003 Page 7 of 34

L.1. Instructions to Offerors, NAICS and Magnitude of Construction 31 L.2. 52.204-7 System for Award Management (OCT 2016) 31 L.3. 52.222-5 Construction Wage Rate Requirements – Secondary Site of the Work (MAY 2014) 31 L.4. 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for

Construction (FEB 1999) 31 L.5. 52.225-10 Notice of Buy American Act Requirement - Construction Materials (MAY 2014) 31 L.6. 52.236-27 Site Visit (Construction) (FEB 1995) 33 L.7. 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998) 33 L.8. GS2116 Distortions in Drawings (July 2001) 33 L.9. GS2130 Use of PPIRS Past Performance Data (January 2003) 33

SECTION M. EVALUATION FACTORS FOR AWARD 33

M.1. GS2320 Evaluation Factors (August 2001) – LPTA with Pass/Fail Past Performance 33

SECTION B. SUPPLIES OR SERVICES AND PRICES/COSTS

B.1. Schedule of Supplies/Services

CLIN DESCRIPTION QTY UNIT UNIT PRICE EXTENDED

PRICE

SERVICES, NON-PERSONAL TO PROVIDE ALL

PLANT, EQUIPMENT, LABOR AND

MATERIALS(UNLESS OTHERWISE PROVIDED

HEREIN) NECESSARY TO PERFORM

INSTALLATION OF SEVEN MONITORING

WELLS IN THE PROPOSED HIGHWAY BYPASS

AREA NEAR HOT SPRINGS, ARKANSAS in accordance with C.1. "Performance Work Statement” Note: Pricing should be fixed priced for (7) 75’ wells-

1 JOB

0002 Overage depths greater than 75’ up to 400’ -fixed priced per foot TBD Foot

B.2. Contract Type

Fixed-Price

140G118Q0003 Page 8 of 34

The contractor will be responsible for completion of seven monitor wells installed and completed following requirements outlined herein. Contractor should provide fixed prices for drilling (7) (total depths could range anywhere from a minimum of 75 ft to a maximum of 400 ft.) Pricing should be established at a fixed priced for minimum of 75 ft well plus adjustment pricing PLUS fixed priced per foot for overage depths greater than 75’ up to 400’. Final payment will be based on wells drilled and completed.

SECTION C. DESCRIPTION/SPECIFICATIONS/PERFORMANCE WORK STATEMENT

C.1. Performance Work Statement

General information: This performance-based statement of work (PB-SOW) describes site conditions, anticipated subsurface conditions, drilling requirements, monitoring-well specifications, and other information and requirements for seven monitoring wells to be installed east of the City of Hot Springs.

The precise drilling locations have not been determined. However, the wells will fall within the proposed bypass area shown in Exhibit A, fig. 1 -12b., a corridor of approximately 5 miles in length, and meet all Arkansas Department of Transportation (ArDOT) Permit Requirements, including final ArDOT approval.

Introduction: The ArDOT plans to construct a two-lane divided highway approximately five miles in length, east of the City of Hot Springs, that will traverse the eastern extent of the recharge area for the Hot Springs National Park 52(HOSP) geothermal flow system. In order to provide information regarding potential impacts to shallow wells and the hot springs of HOSP associated with the highway construction, the Arkansas Office of the Lower Mississippi- Gulf Water Science Center will install monitor wells to support research and assessment of potential effects on shallow groundwater from construction activities associated with the proposed bypass, east of Hot Springs, Arkansas.

Background: The monitor wells to be installed will be used to (1) collect hydrogeologic information to characterize and increase the understanding of the shallow groundwater system along the proposed bypass route prior to, during, and following construction activities for a proposed highway near Hot Springs, Arkansas, and (2) identify potential effects of construction on the regional, shallow aquifer system that serves as part of the HOSP thermal springs recharge area. Geophysical logging of wells will be conducted during the drilling and completion process. Travel distances will not be large as well will be drilled within an approximate 5-mile by 1-mile corridor. As highway construction has not been initiated as of yet, travel routes between sites will be indirect, using existing county roads, lease roads, and logging roads. The terrain in the area is steep and rugged; however, drilling locations will be selected near to passable roads.

Scope: This statement of work covers the installation of seven (7) monitoring wells completed in hard-rock sequences, at an average depth of approximately 150 feet for all wells (this will vary from well to well), along the proposed highway corridor (fig 1).

Work Requirements: A USGS geologist will ensure that contractors follow this PB-SOW and meet all requirements. Geophysical logging will be conducted after drilling, but prior to casing installation and completion of the monitoring well. Geophysical logging will take approximately three to six hours, depending on whether the well is cased prior to logging. Fewer logs will be run in cased wells, taking less time. USGS personnel will be on location during drilling, logging, and borehole-completion operations. Drill rig relocation will not be required for geophysical borehole logging.

140G118Q0003 Page 9 of 34

The contractor is responsible for providing all equipment, materials, and labor required to successfully complete monitoring well installation as described in this PB-SOW. The contractor will collect cuttings samples every five feet of drilling, at minimum. The driller will be responsible for any and all permits required by the State of Arkansas. The driller will conduct all field activities in a safe manner and remove all construction materials after well completion, in accordance with relevant OSHA, Federal, State, and local laws and regulations regarding environmental compliance, safe working conditions, etc. The contractor will document completion, including photos (before and after) with minimum of three different views with sufficient detail to see the entire work location; record and document any waste materials removed and delivered to approved disposal sites.

Technical Requirements (Exhibit B fig. 1): Travel time between all sites should be less than one hour, as all sites will be between Hwy 70 and Hwy 7/5 (approximately a 5-mile distance). Well drilling and completion techniques should be adopted and applied to allow annular space adequate for proper sealing of all casing and emplacement of screen (where necessary),sealing material will be emplaced to provide good hydraulic connectivity with the aquifer and vertical isolation from the surface, and from underlying and overlying formations. The contractor is responsible for providing all monitoring-well materials, including casing, annular seal, grout, cement, protective cover, etc. Materials will be as follows:

a. Monitoring Well Casing and Screen: Initial well-completion design calls for open-hole completion, wherein surface casing will be set from surface to a few feet into bedrock, and the remainder of the bore hole from bottom of surface casing to total depth will be open to the rock formation. Where bedrock is unstable and caving and closure of the borehole is a possibility, such as is common in highly fractured cherts and sandstones, the well will be cased and screened with PVC casing and screen to maintain the bore hole and allow hydraulic communication with target aquifers. Therefore, the driller should have casing and screen available (20-foot screened interval) to complete each boring. Final well casing will be a minimum 4-inch diameter (at least Schedule 40 thickness) PVC.

b. Annular Seal: The annulus (the space between the casing and borehole wall) above the screen and sand interval well in wells where casing is used will be back filled with a suitable approved material such as cuttings or by using a 5% bentonite-cement slurry emplaced using pressure grouting (i.e. through a tremie pipe) to ensure a competent and continuous fill between the casing and borehole wall.

c. Well Packing: Where open-hole completion is not feasible and the well is cased and screened, a coarse, clean sand approved as packing material for wells, should be emplaced across the screened zone. The sand will extend a minimum of 2 feet vertically above and below the screened interval to ensure that bentonite does not contact screen. A minimum of one-foot of bentonite will be emplaced above the sand pack and the annulus fill.

d. Well Completion: A steel protective casing equipped with a lockable cover shall be placed over the well casing.

The top of the casing should be slightly (1 – 3 inches) beneath the top of the protective casing (in the open position) such that a protective cap can be placed over the well casing which does not interfere with the opening or closing of the protective casing.

e. Concrete shall be used to fill the annulus between the inner casing and the protective casing from the top of the backfill up to the land surface, and as part of the same pour, a concrete pad will be poured around the protective casing to secure it. The concrete pad should be a minimum 3 feet square and 4 inches thick, and should slope away from the well protective casing to provide for drainage. A drainage hole of approximately ½-inch diameter shall be drilled into the side of the protective casing within one inch of the top of the concrete pad to drain any water that enters the annular space between the well casing and the protective casing. The annular space between the well casing and the protective casing above the level of the concrete pad shall be filled with clean sand or gravel to prevent insect entry through the weep hole and to prevent loss of items down the annular space. The USGS will provide a lock for the protective casing.

f. Well Development: Within two weeks after well construction is complete, but no sooner than 48 hours after installation of the annular seal is completed, the monitoring well should be developed. Well development shall not include the use of dispersing agents, acids, or explosives. The objectives of well development are:

1. Assure the groundwater enters the well freely, yielding accurate water-level measurement.

2. Remove very fine-grained sediment in the borehole and nearby surrounding formation, so that groundwater is not highly turbid and silting of the well does not occur. Break down any wall cake generated during drilling, remove blockage, and restore good hydraulic connectivity between the well and surrounding formation.

140G118Q0003 Page 10 of 34

The well will be developed by some combination of pumping at a high rate, bailing, and surging. Development shall continue until water representative of the screened formation is discharged–as indicated by stabilized specific conductance measurements and decreased turbidity. Monitoring of specific conductance will be done by on-site USGS geologist. At a minimum, the volume of water removed should exceed the volume of water lost during drilling and equal to at least 10 times the volume of water in the well bore. Once development is complete, any sediment that entered the well during the development process will be removed from the sediment trap.

Because subsurface conditions in the area will vary, the actual drilling plan for individual wells may be different than what is listed below. However, to maintain uniformity for all potential vendors, the following general, descriptive scenario will be used for proposal purposes.

a) A minimum 6-inch hole will be drilled from land surface to total depth. Total depths could range anywhere from a minimum of 75 ft to a maximum of 400 ft. Total drilling depth will be determined by the on-site USGS geologist and based on drilling to a depth 40 to 60 feet below the depth at which water is intercepted .

b) 4-inch diameter minimum schedule 40 PVC casing will be installed.

c) 4-inch diameter minimum schedule 40 PVC screen, slot size 0.010-inch slot size, will be installed

d) The costs for other items previously mentioned such as installation of protective cover, well development, etc. need to be included in the fixed price.

C.2. Performance Measures and Deliverables:

Work will be considered successful when all materials and equipment have been removed from the drill sites and all debris removed with document completion including site photos(before and after) with minimum of three different views with sufficient detail to see the entire work location; document any waste materials removed and delivery to the approved disposal site.

Quality: 100% compliance with applicable regulation

Workmanship: 100% documented as required.

C.3. Green Acquisition The USGS is committed to promoting the natural environment and protecting the health and well-being of people. In the performance of work under this contract, the Contractor shall exert its best efforts to provide services in a manner that will promote the natural environment and protect health and well-being. Green purchasing or environmentally preferable contracting includes the initiatives described below:

C.3.1. Alternative Fuels and Vehicles are described at http://www.afdc.energy.gov/afdc/

C.3.2. Biobased Products are described at http://www.biopreferred.gov/

C.3.3. Energy efficient products are described at http://energystar.gov/products for Energy Star products and at http://www.eere.energy.gov/femp/procurement for FEMP designated products

C.3.4. Environmentally Preferable Computers are described at http://www.epeat.net

C.3.5. Non-Ozone Depleting Products are described at http://www.epa.gov/Ozone/snap/index.html

C.3.6. Recycled Products are described at http://epa.gov/cpg

C.3.7. Water efficient products are described at http://epa.gov/watersense/

C.4. GS0342 Hazardous Material Identification March 2008

(a) In accordance with clause FAR 52.223-3, Hazardous Material Identification and Material Safety Data, Alternate I, the contractor shall provide Materials Safety Data Sheets (MSDS) for the following products prior to their use

140G118Q0003 Page 11 of 34 under this contract: adhesives, caulking, sealants, insulating materials, fireproofing or firestopping materials, paints, carpets, floor and wall patching or leveling materials, lubricants, clear finish for wood surfaces, janitorial cleaning products, pesticides, rodenticides, and herbicides.

(b) The Government reserves the right to review such products at any time. The Contracting Officer may eliminate from permitted use under this contract products with significant quantities of toxic, flammable, corrosive or Carcinogenic material and products with potential for harmful chemical emissions.

C5. GS0343 Energy Efficient Products March 2008

(a) The clause FAR 52.223-15, Energy Efficiency in Energy-Consuming Products, applies to any power-consuming equipment to be installed or used in USGS facilities, whether title to the equipment will pass to the Government or BBBbe retained by the Contractor.

(b) For products that consume power in a standby mode (as listed on FEMP’s Standby Power Devices product listing), the contractor shall –

(1) Purchase items which meet FEMP’s standby power wattage recommendation or document the reason for not purchasing such items; or

(2) If FEMP has listed a product without a corresponding wattage recommendation, purchase items which use no more than one watt in their standby power consuming mode. When it is impracticable to meet the one watt requirement, purchase items with the lowest standby wattage practicable.

(c) The requirements of this clause do not apply if (1) no compliant product’s utility and performance can meet the contractor’s need or contract specifications, (2) compliance would not be life-cycle cost effective or (3) compliant solutions are otherwise not available.

(d) Information is available via the Internet about - ENERGY STAR® at http://www.energystar.gov/; and FEMP at http://www.eere.energy.gov/femp/procurement.

C.6. GS0346 Construction Waste Management March 2008

(a) Items and material existing in the space or to be removed from the space during the demolition phase are eligible for reuse in the construction phase of the project. The reuse of items and materials is preferable to recycling them;

however, items considered for reuse must be in refurbishable condition, and must meet the quality standards set forth by the Government in this solicitation/contract. In the absence of definitive quality standards, the contractor is to ensure that the quality of the item(s) in question will meet or exceed accepted industry or trade standards for first quality commercial grade applications. Before use, the contractor shall submit a reuse plan to the Contracting Officer. The Government will not pay for existing fixtures and other existing improvements accepted in place.

(b) Recycling construction waste means providing all services necessary to furnish construction materials or wastes to organizations which will employ these materials or wastes in the production of new materials. Recycling includes required labor and equipment necessary to separate individual materials from the assemblies of which they form a part.

(c) The Offeror shall maintain a recycling program to dispose of or recycle construction waste in compliance with this clause. The program must cover the following requirements.

(1) The contractor will provide continuous facilities for the recycling of incidental construction waste during initial construction.

(2) Products may be excluded from the recycling program when the small quantity of material involved, the extraordinarily complex nature of the waste disposal method, or prohibitive expense for recycling would represent a genuine hardship.

(3) Records of construction materials recycled shall be maintained and accessible to the Contracting Officer.

Records shall include materials recycled or landfilled, quantity, date, and identification of hazardous wastes.

(d) As a minimum, the contractor will recycle lighting and associated support system, carpet and carpet pad, hardware, drywall, and electrical components during both the demolition and construction phases of the project, subject to economic evaluation and feasibility.

(e) If any waste materials encountered during the demolition or construction phase are found to contain lead, asbestos, PCBs (such as fluorescent lamp ballasts), or other harmful substances, they are to be handled and removed in accordance with State and Federal laws and requirements concerning hazardous waste.

http://www.eere.energy.gov/femp/procurement

140G118Q0003 Page 12 of 34

(f) The requirements of paragraphs (b) through (d) of this clause do not apply when no construction recycling and salvage operation is reasonably available in the locality where work is to be performed.

SECTION D. PACKAGING AND MARKING

[Reserved]

SECTION E. INSPECTION AND ACCEPTANCE

E.1. 52.246-12 Inspection - Dismantling, Demolition, or Removal of Improvements (AUG 1996)

(a) Unless otherwise designated by the specifications, all workmanship performed under the contract is subject to Government inspection at all times and places where dismantling or demolition work is being performed. The Contractor shall furnish promptly, and at no increase in contract price, all reasonable facilities, labor, and materials necessary for safe and convenient inspection by the Government. The Government shall perform inspections in a manner that will not unduly delay the work.

(b) The Contractor is responsible for damage to property caused by defective workmanship. The Contractor shall promptly segregate and remove from the premises any unsatisfactory facilities, materials, and equipment used in contract performance, and promptly replace them with satisfactory items. If the Contractor fails to proceed at once in a workmanlike manner with performance of the work or with the correction of defective workmanship, the Government may -

(1) By contract or otherwise, replace the facilities, materials, and equipment or correct the workmanship and charge the cost to the Contractor; and

(2) Terminate for default the Contractor's right to proceed. The Contractor and any surety shall be liable, to the extent specified in the contract for any damage or cost of repair or replacement. (End of clause)

SECTION F. DELIVERIES AND PERFORMANCE

F.1. Deliverables

Deliverable Reference Due Deliver To All labor, materials and equipment necessary to construct all items described in performance work statement and attachments

Performance Work Statement NTP + 60 days USGS

List of Subcontractors Section F: GS1354 Within 10 days after receipt of award

CO

Payment Bond or Irrevocable Letter of Credit

Section I: 52.228-13 Within 10 days after receipt of contract award

CO

Proof of Liability Insurance

Section I: 1452.228-70 Within 10 days after receipt of contract award

CO

Site Photos(before and after) with minimum of three difference views with sufficient detail to see the entire work location;

document any waste materials removed and delivered to approved disposal site

Performance Work Statement Prior to submitting final invoice

Technical Liaison

Invoices Section H: DOI Electronic Invoicing Section G: GS1126

No more often than monthly

IPP Web Page

DI-137 Release of Claims Section I: 1452.204-70 Prior to submitting final invoice

CO

Final Invoice N/A After submitting IPP

140G118Q0003 Page 13 of 34

Release of Claims Weekly Payrolls for contractor and each subcontractor

Section I: 52.222-8

The contractor is required to submit copies of all payrolls. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. This information may be submitted in any form.

The optional form WH-347 from the Department of Labor may be used and is available at:

http://www.dol.gov/whd/forms/wh347.pdf

Within 7 days after regular payment date of the payroll week covered

CO

Ref: FAR 22.406-6© for examination of payrolls and statements.

Further compliance checking may be done IAW FAR 22.406-7.

SF-1413 Statement and Acknowledgment (including the subcontractor’s signed and dated acknowledgment that the clauses set forth in paragraph (b) of FAR 52.222-11 have been included in the subcontract)

Section I: 52.222-11

The contractor is required to submit statement and acknowledgement to the Contracting Officer on the Standard Form

(SF) 1413.

Within 10 days after award of this contract and within 10 days after the award of each subcontract thereafter

CO

F.2. Period of Performance

Work will begin within 10 days of r notice to proceed and shall be completed within 60 days from that date.

F.3. Place of Performance

Hot Springs, AR (see Exhibit A Figure 1)

F.4. 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 days the time stated for completion shall include final cleanup of the premises.

(End of clause)

F.5. 52.242-14 Suspension of Work (APR 1984)

F.6. GS0919 Legal Holidays January 2002

The following legal holidays are observed by this Government agency:

New Year's Day January 01 Martin Luther King's Birthday 3rd Monday in January Presidents Day 3rd Monday in February Memorial Day Last Monday in May Independence Day July 04 Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans Day November 11 Thanksgiving Day 4th Thursday in November Christmas Day December 25

When a holiday falls on Saturday or Sunday, it is observed on the adjacent Friday or Monday, respectively.

In addition to the holidays listed above, the contractor agrees to observe leave days or closures designated by Federal Statute, Executive Order, or Presidential Proclamation.

F.7. GS1125 Schedule of Prices (Construction) July 2001 http://www.dol.gov/whd/forms/wh347.pdf

140G118Q0003 Page 14 of 34

In accordance with the clause FAR 52.232-05, Payments under Fixed-Price Construction Contracts, the contractor shall, within 10 days after receipt of notice of award, submit to the Contracting Officer for approval, a Schedule of Prices. This schedule shall consist of a detailed breakdown of the contract price, segregated under each of the significant construction categories. It shall state the quantities for each of the various types of work, the unit prices, and extended totals. Subcontractors who may be involved in more than one category of work must provide the same breakout data for each category. The submission of the required data shall not otherwise affect the contract terms.

F.8. GS1354 List of Subcontractors (Construction) (July 2001)

For purposes of monitoring compliance with the insurance and payroll reporting requirements of this contract, the contractor shall furnish a listing of all subcontractors to the Contracting Officer within 10 calendars days after contract award.

SECTION G. CONTRACT ADMINISTRATION DATA

G.1. Contract Administration Requirements

G.1.1. The following items must be submitted to the Contracting Officer (mail items to the address provided in your award notice) within 10 days after contract award:

G.1.1.1. Payment protection - Standard Form 25a payment bond preferred (see clause 52.228-13, payment bond only

– no performance bond needed at this dollar amount), G.1.1.2. Insurance certificate (see clause 1452.228-70)

G.1.1.3. List of all subcontractors (see clause GS1354).

Upon receipt and approval of these documents, a Notice to Proceed will be issued.

G.1.2. In accordance with clause 52.211-10, the contractor must commence work under this contract within 10 calendar days after Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 days after Notice to Proceed.

G.1.3. Coordinate the scheduling of all work to be performed and technical questions regarding the project with Technical Liaison. The Technical Liaison will be provided at the time of award.

G.1.4. The contractor is required to submit copies of all payrolls to the Contracting Officer at carrieres@usgs.gov. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. This information may be submitted in any form. The optional form WH-347 from the Department of Labor may be used and is available at: http://www.dol.gov/libraryforms/forms/ESA-WHD/Form_WH-347.pdf

G.1.5. Note the requirement to submit invoices through U.S. Department of the Treasury's Internet Payment Platform System (IPP). See DOI Electronic Invoicing clause at G.2 for instructions.

G.2. DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Internet Payment Platform (IPP) (September 2011)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Internet Payment Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice [CO to edit and include the documentation required under this contract]:

Vendor’s internal invoice.

The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The http://www.dol.gov/libraryforms/forms/ESA-WHD/Form_WH-347.pdf

140G118Q0003 Page 15 of 34

Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Clause)

G.3. Unilateral Deobligation of Unexpended Funds (May 2013)

The contractor shall submit all invoices under the award no later than 90 calendar days after the period of performance has expired, unless a request for extension has been submitted to the Contracting Officer. After 120 days has passed since the expiration of the performance period, the government reserves the right to issue a unilateral modification deobligating any unexpended funds, and to initiate closeout procedures.

G.4. 52.000S-5079 Technical Liaison - Technical Direction October 1997

(a) The performance required herein shall be subject to the technical direction of the Technical Liaison (TL) as identified below. As used herein, "technical direction" is defined as direction to the contractor that fills in details, suggests possible lines of approach, or otherwise supplements the scope of the work set forth herein and shall not constitute a new assignment, and does not supersede or modify any article or clause of this contract.

(b) The Technical Liaison is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government. Only a warranted Contracting Officer is authorized to obligate funds on this or any other contract action.

(c) The contractor shall immediately notify the Contracting Officer in writing if the Technical Liaison has taken an action (or fails to take action) or issues direction (written or oral) that the contractor considers to exceed the above limitations.

(d) The Technical Liaison assigned for this contract is:

Name: To Be Determined Telephone Number: To Be Determined U.S. Geological Survey (Enter address here.)

(e) Only the Contracting Officer may designate a different Technical Liaison.

SECTION H. SPECIAL CONTRACT REQUIREMENTS

H.1. 52.900S-1152 Drilling-Government Representative October 1997

The performance required herein shall be subject to the technical direction of a government representative. As used herein, "technical direction" is defined as direction to the contractor that fills in details, suggests possible lines of approach, or otherwise supplement the scope of the work set forth herein, will not constitute a new assignment, and does not supersede or modify an article or clause of this contract. The government representative will be named at time of award.

H.2. 52.900S-1153 Drilling-Site Prep Restoration October 1997

After completion of all other work described herein and before final acceptance by the government representative, the site shall be restored (to the appropriate state restoration requirement applicable) to its original condition. Such restoration may include, but is not restricted to the following: 1. All equipment belonging to the contractor shall be

140G118Q0003 Page 16 of 34 removed from the site; 2. Holes shall be filled in and depressions and tire ruts smoothed out; 3. Any debris associated with the drilling shall be cleaned up and removed. The work specified in this contract shall not be considered complete, nor shall the final invoice for the work be approved, until site restoration is completed to the satisfaction of the representative.

H.3. 52.900S-1154 Drilling-Permits October 1997

The contractor shall be responsible for obtaining the necessary permits and for the disposal of all water pumped under this contract. The bidder shall be held as having examined the conditions in the field and shall have the responsibility of determining the system(s) to use as well as obtaining the necessary permits for using them.

Potential hazards during period of low temperatures can result from clogging of ditches by ice causing additional water to spread from the drainage ways onto the roadways and then freeze. The contractor shall provide all necessary means to prevent erosion or sedimentation along the ditches and shall maintain the culverts and ditches during the period of discharge to them.

H.4. 52.900S-1155 Drilling-Toilet Facilities October 1997

The contractor shall provide and maintain sanitary toilet facilities for his personnel, which shall be removed upon completion of this contract, leaving the premises clean.

H.5. 52.900S-1156 Drilling-Abandoned Hole October 1997

A satisfactory well that is acceptable under these specifications shall be completed to the depth designated by the government representative. Any hole that does not satisfy the requirements described herein and which cannot be made acceptable shall be declared an abandoned hole. Any hole in which the contractor voluntarily stops work and/or fails to complete in a satisfactory manner shall be considered as abandoned by him. An abandoned well is of no value to the government; therefore, no payment will be made for the drilling, casing, development or supplies of the abandoned well. An abandoned well shall be filled with puddled clay, cement, and/or fine drilling cuttings from the bottom of the hole to the land surface by contractor at his own expense. The contractor shall then move to another government designated location and drill a second hole in accordance with these specifications.

H.6. 52.900S-1157 Drilling-Contractor Representative May 2005

The contractor shall have an experienced foreman or driller, with full authority to act on behalf of the contractor in directing all field operations, constantly in charge of the work at the drill site when work is underway. This representative shall be experienced in cable installation of casing and well development as described herein. This representative must be acceptable to the government representative in the event that he becomes unacceptable to the representative, the contractor shall receive written notice from the government and shall replace him with an acceptable representative within five (5) working days of receipt of the notice.

H.7. 52.900S-1160 Drilling-Drilling Equipment October 1997

The contractor shall maintain all equipment in satisfactory operating condition for the duration of the contract. If, based on the work completed to date the equipment is considered unsatisfactory by the government representative, thus endangering performance under this contract, the representative shall notify the contractor of such in writing, and a copy of such notification shall be sent to the contracting officer for corrective action. The contractor shall then cease work immediately and within ten (10) days of receipt of notice replace the unsatisfactory equipment with equipment approved by the government representative. Acceptance of replacement equipment shall be made only by the government.

H.8. 52.900S-1161 Drilling-Government Liability for Damage October 1997

The government will not be liable for any injury to contractor liability personnel or damage to contractor injury or property unless such injury or damage is due to negligence on the part of the government.

H.9. 52.900S-1162 Drilling-Responsibility for Damage to Contractors Equip. October 1997

The contractor shall assume all responsibility for damage to his equipment whether from elements, vandalism, operation under the contract, or moving to, from or between drilling locations.

H.10. 52.900S-1163 Drilling-Safety and Health October 1997

The contractor shall take all reasonable precautions in the performance of the work under this contract to protect the safety and health of contractor employees, government employees, and the public shall comply with all applicable

140G118Q0003 Page 17 of 34 safety and health regulations and requirements (including reporting requirements) of the government. The contracting officer shall notify, in writing, the contractor of any noncompliance with the provisions of this clause and the corrective action to be taken.