This document appears to be an amendment containing questions and answers related to Solicitation #140FC124Q0026 for the Wheeler Shop Power Re-route project at the Wheeler National Wildlife Refuge near Decatur, Alabama.

The key details are:

  • The project requires new wiring from the panel source to three separate buildings, while leaving the existing wiring from the panel source to the shop in place to maintain power.
  • Contractors are not required to submit a project-specific QA/QC plan or safety plan.
  • The project is not tax exempt, and bidders must pay normal taxes on their purchases.
  • The magnitude of construction is between $25,000 and $100,000. The NAICS code is 541330 with a $25.50 million small business size standard.
  • The basis of award will be lowest price, fair and reasonable.

View the file

Other files for this federal contract opportunity

Other files attached to AL-WHEELER NWR-COMPOUND ELECTRIC, newest first.
File Type Posted
Sol_140FC124Q0026_Amd_0004.pdf PDF
Sol_140FC124Q0026_Amd_0003.pdf PDF
Sol_140FC124Q0026_Amd_0002.pdf PDF
A04_SOW_0001_1.pdf PDF
B08_SOL_A-M_140FC124Q0026_0001.pdf PDF
Sol_140FC124Q0026_Amd_0001.pdf PDF
A04_SOW_0001.pdf PDF
Sol_140FC124Q0026.pdf PDF
A04_SOW.pdf PDF
B08_SOL_A-M_140FC124Q0026.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B09 AMENDMENT 0001 QUESTIONS FOR Solicitation #140FC124Q0026: Wheeler Shop Power Re-route

1. In executing this project, can one superintendent fulfill the supervision, safety, and QAQC roles?

Yes

2. Are contractors required to issue a contract specific QA/QC Plan?

No

3. Are contractors required to issue a contract specific Safety Plan?

No

4. Is this project tax exempt?

No, bidders must pay normal taxes on their purchases

5. Are they going to be determinating the wire from the panel that it’s fed to now?

New wiring is required from the Panel source to 3 separate buildings. The wiring from the Panel Source to the Shop should be left in place so power remains to the shop. the power to the 3 other buildings through the shop should be ended properly so no safety issues.