B08_Solicitation_-_Revised_Price_Schedule_-_Rainwater_Basin_Wells.pdf

PDF 176 KB Posted

Attached to
Construct Two (2) Replacement Water Wells in the R Federal contract opportunity
Solicitation number
140F0618R0012
Issued by
Department of the Interior Fish and Wildlife Service Region 9 Headquarters

About this file

B08 Solicitation - Price Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Construct Two (2) Replacement Water Wells in the R, newest first.
File Type Posted
Sol_140F0618R0012_Amd_0002.pdf PDF
FedConnect File —

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM

NO.

DESCRIPTION QTY UNIT UNIT PRICE SUB TOTAL

1 Drill Borehole to accommodate 16" casing 200 feet

2 16" PVC casing 140 feet

3 16" PVC screen 60 feet

4 Filter pack, bentonite, cement, concrete pad 1 each

5 Submersible electric motor, pump (1,200 gpm), electrical connections 1 each

6 Drop Pipe (per ft), installation labor, wellhead fittings 175 feet

7 Discharge pipe (per ft), fittings and valves, flow meter 22 feet

8 Mobilization 1 each

9 Well development, Pump Test, Registration 1 each

10 Pump control panel, 75 ft buried electric line 1 each

11 New 3-phase electric line, 1 new meter 450 feet

12 Decommission Old well 1 each

1 Drill Borehole to accommodate 16" casing 210 feet

2 16" PVC casing 140 feet

3 16" PVC screen 70 feet

4 Filter pack, bentonite, cement, concrete pad 1 each

5 Submersible electric motor, pump (1,200 gpm), electrical connections 1 each

6 Drop Pipe (per ft), installation labor, wellhead fittings 175 feet

7 Discharge pipe (per ft), fittings and valves, flow meter 22 feet

8 Mobilization 1 each

9 Well development, Pump Test, Registration 1 each

10 Pump control panel, 75 ft buried electric line 1 each

11 New 3-phase electric line, 1 new meter 2,300 feet

12 Decommission Old well 1 each

GRAND TOTAL

Hansen WPA and Hultine WPA Well Replacement - Rainwater Basin Wetland Management District, Clay

Center, NE

PRICE SCHEDULE

Furnish all labor, materials, and equipment to complete the following work in accordance with the attached descriptions/specifications and drawings.

HANSEN WPA

HANSEN WPA TOTAL

HULTINE WPA TOTAL

HULTINE WPA