QUESTIONS and ANSWERS SOLICITATION NO-EGH_0001.pdf
PDF 112 KB Posted
- Attached to
- Emergency Roofing Project Federal contract opportunity
- Solicitation number
- 140F0420R0032
About this file
This document provides questions and answers regarding Solicitation No. 140F0420R0032 for an Emergency Roofing Project at the DC Booth Historic National Fish Hatchery in Spearfish, Lawrence County, South Dakota. The solicitation involves re-roofing multiple buildings on the campus within 120 days of the notice to proceed. Drawings specify the location, number and type of roof for each building, which will consist of shingle roofs. Prospective bidders are advised to visit the project site to understand the scope of work, which does not include any non-shingled roofs. The type of shingles required for each building is also detailed in the drawings and specifications.
The related federal contract opportunity lists the solicitation number, names the project as an Emergency Roofing Project, and identifies the opportunity type as a solicitation issued by the Department of the Interior Fish and Wildlife Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003_0003.pdf | ||
| Sol_140F0420R0032_Amd_0003.pdf | ||
| Amendment 0002_0002.pdf | ||
| Sol_140F0420R0032_Amd_0002.pdf | ||
| Sol_140F0420R0032_Amd_0001.pdf | ||
| Solicitation Amendment 140F0420R0032_0001.pdf | ||
| B08-Solicitation 140F0420R0032.pdf | ||
| Sol_140F0420R0032.pdf | ||
| A06-Specifications.pdf | ||
| B03-Dol Wage Determination.pdf | ||
| A06-Drawings.pdf | ||
| Project Submittals.pdf | ||
| A06 Bid Schedule-Buildings.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO: 140F0420R0032
QUESTIONS-ANSWERS
EMERGENCY ROOFING PROJECT
DC BOOTH HISTORIC NATIONAL FISH HATCHERY
SPEARFISH, LAWRENCE COUNTY, SOUTH DAKOTA
QUESTIONS ANSWERS
Q1: What is the expected start date?
A1: The start date is as soon as possible after award.
Q2: What is the period of performance?
A2: 120 days (from Notice to Proceed)
Q3: How many buildings on the campus will be re-roofed?
A3: Refer to the provided drawings for the number, location and type of roof being installed on the noted buildings.
Q4: There are mostly shingled roofs on the buildings. Are there any non-shingled roofs being re-done?
A4: No. It is highly recommended that prospective bidders visit the project site prior to bidding to get and understanding of the project.
Q5: What type of shingles are required (shake, architectural, standard 3 tab)?
A5: Refer to the drawings and specifications for the roofing type to be used on the buildings.