B12_-_Question_Log_A_0001.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- MIDDLE SCHOOL PARKING LOT ASPHALT Federal contract opportunity
- Solicitation number
- 140A2322R0019
About this file
This document contains a question log and solicitation for a parking lot asphalt construction project at Turtle Mountain Middle School. The solicitation is set aside for Indian Economic Enterprise contractors and seeks bids to remove existing asphalt and subgrade down 12 inches, prepare the site by sweeping, and install new asphalt and base material over an area of approximately 9,000 square yards. Questions are due by March 3rd and bids are due March 22nd. The work is to be completed for the Bureau of Indian Affairs Bureau of Indian Education.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_3_-_SF-24_Bid_Bond_Form.pdf | ||
| Attachment_8_-_C-2_LOCATION_PLAN_A.pdf | ||
| Sol_140A2322R0019.pdf | ||
| Attachment_1_-_Wage_Rate.pdf | ||
| Attachment_9_-_C-4_GRADING_PLAN_A.pdf | ||
| Attachment_7_-_C-1_KEY_MAP.pdf | ||
| Attachment_6_-_SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf | ||
| Attachment_5_-_SF-25A_Payment_Bond_Form.pdf | ||
| Attachment_2_-_Question_Log.xlsx | XLSX spreadsheet | |
| Attachment_4_-_SF-25_Performance_Bond_Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question Log | ||
| Contractor's Question | Government Response | |
| 1 | Section C, paragraph C.2, Specific requirements, item b. says contractor shall remove existing surface (approximately 12 inches)…. Unless the existing asphalt is unusually thick, 12” will remove all of the asphalt plus some of the subgrade. | We want to remove the subgrade to get the proper compaction and remove existing subgrade and add new subgrade to 12". |
| 2 | Item c. says to mill existing pavement 1” deep and 3 feet wide along the edge. How is this to be done if we have already removed 12 inches as called for in item a. ? | Please remove item c from SOW and refer to 1 section c |
| 3 | Item e. says prepare the parking area by sweeping the area of all loose sand and debris. Again, we have removed all the asphalt per instructions of item a. | Please remove item e from SOW |
| 4 | Item f. says the approximate square footage of the northwest dirt area and the existing asphalt parking area is 1400 yards. If we are talking about Parking Lot B on the Key Map (attached) a rough scaling of the dimensions shows more on the order of 9,000 square yards. | We need 9000 square footage - remove the 1400 yard |
| 5 | To what are you referring by northwest dirt area? | Please remove from SOW |
| 6 | 1. Item g. says contractor is to apply a tack coat over the entire prepared parking area before applying asphalt overlay. How are we to do this of all the asphalt has been removed, per item a.? | Please remove item g from SOW refer back to section c because new asphalt will be installs |
| 7 | ||
| 8 | ||
| 9 | ||
| 10 | ||
| 11 | ||
| 12 | ||
| 13 | ||
| 14 | ||
| 15 | ||
| 16 | ||
| 17 | ||
| 18 | ||
| 19 | ||
| 20 | ||
| 21 | ||
| 22 | ||
| 23 | ||
| 24 | ||
| 25 | ||
| 26 | ||
| 27 | ||
| 28 | ||
| 29 | ||
| 30 |
File details come from the government source that posted it. Updated .