This document contains questions and answers related to solicitation number 140A1121Q0039 for PCB cleanup work. The solicitation is seeking bids for cleanup of PCB contamination at a site owned by the Bureau of Indian Affairs Western Region. Work includes clearing, asphalt and concrete removal, soil and groundwater sampling, and asphalt replacement. An on-site water source and power will be provided for dust suppression and contractor use. Bidders should not provide pricing for optional "held" groundwater samples or optional items 1-1, 4-3, and 4-4, as those services will be negotiated separately if needed. The schedule must allow 30 days for BIA review and 30 additional days for contractor response to comments.

View the file

Other files for this federal contract opportunity

Other files attached to SCIP PCB Cleanup, newest first.
File Type Posted
Sol_140A1121Q0039_Amd_0003.pdf PDF
Dft_EPA_Application_Plan_5-27-21_0002.pdf PDF
Sol_140A1121Q0039_Amd_0002.pdf PDF
140A1121Q0039_Terms_and_Conditions_Amendment_0001_0001.pdf PDF
140A1121Q0039_Terms_and_Conditions.pdf PDF
Sol_140A1121Q0039.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140A1121Q0039 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Phoenix AZ 85004

A11

SUITE 400 MAILROOM

2600 N CENTRAL AVENUE

Contracting Office

DOI, BIA WRO

Phoenix AZ 85004

A11

SUITE 400 MAILROOM

Contracting Office

2600 N CENTRAL AVENUE

BIA WRO 00011

07/30/20210001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/30/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The following questions and answers are provided to all potential quoters:

Q: Page 45 of the solicitation indicates that of the work subcontracted, no more than 50% may be subcontracted to a concern other than a responsible Indian economic enterprise. Is construction exempt per FAR 52.219-14?

A: For construction portions of the work, contractor must perform 15% of the cost of contract with its own personnel, or 25% for specialty trade contractors.

Q: Page 34 of the solicitation says "Minimum of three environmental complex projects in excess of $500,000 successfully completed within the last ten years." Do projects have to

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Randall Brown

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140A1121Q0039/0001 be 100% complete to meet the criteria?

A: No. Contractor needs to demonstrate that it has been awarded three similar type complex projects. The project does not need to be completed, but the contractor needs to demonstrate successful performance. The word

"completed" is replaced with "performed" in SOW to indicate the project can be in progress.

Q: The Cover, Table of Contents, Acronym list, and Schedule are not normally included in the proposal page count. Please confirm these pages listed are not included in the 20-page limit.

A: The 20-page limit only includes the narrative portion of the proposal and does not include peripheral reference information which include the table of contents, cover page, schedule, figures, or reference documents. The narrative portion should focus on the project approach unique to the contractor and not specifically described in the Statement of Work (e.g., staffing approach, scheduling of work, approach to task completion, clarification of general described activities in the SOW, and chronology of task implementation). If proposal exceeds 20 pages, the offeror will not be excluded but the page limit overage will be considered in the evaluation of the technical proposal.

Q: Task 5, first paragraph, Page 20, Site

Preparation: This paragraph lists numerous activities to be conducted by the contractor, including "improvement of access roads". Details for this activity are not provided. Will improvement of access roads be required; and if so, can further details be provided?

A: The Task 5 paragraph was meant to be an overview of activities described in Tasks 5-1 through 5-5. This paragraph is misleading.

Although "improvement of access roads" is listed there is no mention of this work. This paragraph will be deleted. Tasks 5-1 through 5-5 remain.

Q: Will an on-site water source (i.e., hydrant or equivalent) be available/accessible to fill contractor's water truck? To be used for dust suppression.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140A1121Q0039/0001

A: An on-site water source will be available and accessible for dust suppression or any other required use for this project.

Q: Will a power source be available/accessible for contractor's use?

A: A power source will be available and accessible for use by the contractor.

Q: Task 5, page 32 states that the contractor shall provide documentation of the clearing and grubbing activities, as well as the amount and disposition of asphalt removed within 30 days of removal. Can BIA provide an estimate for the time required to review/approve the removal activities prior to start of Task 6?

A: See Section 4, "Deliverables" on page 34:

"The schedule shall allow BIA 30 calendar days to review and provide comments. The schedule shall include a period of time not to exceed 30 calendar days for the contractor to respond to

BIA, USEPA, and stakeholder comments." BIA will provide comments within 30 days of receipt of any documents requiring review.

Q: Table 7-1 page 27 outlines various sample depths. Most designate the deepest interval

(24/48") as "held". For laboratory costing, should the sample costs for those samples be included?

A: No. Analytical costs for "held" samples shall not be provided as part of the bid. The contractor shall include any costs associated with holding these samples pending the analysis results of the shallow samples collected.

Analytical work associated with "held" samples will be considered optional work. It is recommended that the work be scheduled so that the analysis of "held" samples can be maximized, minimizing the number of modifications authorizing this work.

Q: Section 5-2, page 20: Can BIA estimate the asphalt thickness to be removed?

A: The thickness of existing asphalt is

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140A1121Q0039/0001 estimated to be three inches.

Q: Task 8, page 29: How does the BIA want to restore areas where asphalt was removed?

A: The contractor will restore the area where asphalt is removed with replacement asphalt. The contractor shall include the replacement of

10,362 square feet of asphalt as part of their bid and include that as a cost associated with

Task 5-2. Statement of Work requirement changes reflecting this additional work is found below.

Although concrete removal is not anticipated, concrete replacement costs per square foot have been added to the optional bid table (see attached).

Q: Task 4, Optional Work 4-3 and 4-4, Page 33:

It's unclear how BIA would prefer the contractor to price Option 4-3 and 4-4. Can the BIA provide more information on what to cost for these two options?

A: Pricing for potential optional work is not required for Options 1-1, 4-3, and 4-4. The contractor is notified that optional work probably will occur in these areas due to changes as described in Section 7, "Optional Work." Unit rates provided will be used if optional work is requested.