Sol_140A1119Q0021_Amd_0004.pdf

PDF 92 KB Posted

Attached to
SCIP 18/19 SUPPL PCB SITE INV/ EPA CLEAN Federal contract opportunity
Solicitation number
140A1119Q0021
Issued by
Department of the Interior Bureau of Indian Affairs Central Office

About this file

140A1119Q0021

View the file

Other files for this federal contract opportunity

Other files attached to SCIP 18/19 SUPPL PCB SITE INV/ EPA CLEAN, newest first.
File Type Posted
Sol_140A1119Q0021_Amd_0005.pdf PDF
140A1119Q0021_Solicitation_without_SF-1449_Amendment_0005.pdf PDF
Table_4-1_Landscape.pdf PDF
Sol_140A1119Q0021_Amd_0003.pdf PDF
Sol_140A1119Q0021_Amd_0002.pdf PDF
140A1119Q0021_Solicitation_without_SF-1449_Amendment_0002.pdf PDF
140A1119Q0021_Solicitation_without_SF-1449.pdf PDF
Sol_140A1119Q0021_Amd_0001.pdf PDF
Sol_140A1119Q0021.pdf PDF
140A1119Q0022_Solicitation_without_SF-1449.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140A1119Q0021 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

AAZ

Coolidge AZ 85128

13805 NORTH ARIZONA BOULEVARD

Contracting Office

DOI, BIA SAN CARLOS IRRIGATION

Phoenix AZ 85004

A11

SUITE 400 MAILROOM

Contracting Office

2600 N CENTRAL AVENUE

BIA WRO 00011

03/09/20190004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/09/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AMENDMENT 0004 TO SOLICITATION 140A1119Q0021. QUESTIONS AND ANSWERS ARE PROVIDED:

Q: ARE THERE ANY SITE ACCESS REQUIREMENTS? E.G., SECURITY BADGING REQUIREMENTS?

A: ACCESS REQUIREMENTS EXIST FOR UNION PACIFIC RAILROAD PROPERTY. BIA WILL PAY FEES

RELATED TO ACCESS THIS PROPERTY. COORDINATION IS NECESSARY WITH THE PRVIATE OWNER AND THE

ARIZONA DEPARTMENT OF TRANSPORTATION. BIA WILL COORDINATE ACCESS. COORDINATION WILL BE

NECESSARY TO ACCESS THE YARD AND PERIMETER AREAS WITH SCIP. ACCESS TO THE SCIP FACILITY IS

THROUGH A LOCKED GATE.

Q: DOES THE LABORATORY PERFORMING THE ANLASES NEED TO BE ARIZONA STATE-CERTIFIED?

A: NO, AS LONG AS SAMPLES ARE ANALYZED BY A LABORATORY CERTIFIED BY THE NATIONAL

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Randall Brown

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140A1119Q0021/0004

ENVIRONMENTAL LABORATORY ACCREDITATION PROGRAM.

Q: PLEASE CONFIRM CONTRACTOR IS REQUIRED TO MEET

AT SCIP TO PRESENT THE DRAFT CLEANUP APPLICATION.

A: THE CONTRACTOR IS REQUIRED TO MEET AT SCIP TO

PRESENT THE DRAFT CLEANUP APPLICATION(S) AND AHVE

TELECONFERENCING AVAILABLE FOR THOSE UNABLE TO

ATTEND.

Q: FOR THE SSI REPORT, PLEASE CONFIRM THE

CONTRACTOR CAN PRESENT THE SSI REPORT TO THE

PROJECT TEAM VIA TELECONFERENCE (I.E., THE

CONTRACTOR DOES NOT NEED TO BE AT SCIP FOR THE

MEETING).

A: THE CONTRACTOR IS REQUIRED TO MEET AT SCIP TO

PRESENT THE DRAFT SSI REPORT AND HAVE

TELECONFERENCING AVAILABLE FOR THOSE UNABLE TO

ATTEND. ADDITIONALLY, THE CONTRACTOR SI REQUIRED

TO MEET AT SCIP TO PRESENT THE DRAFT SSI WORK

PLAN AND HAVE TELECONFERENCING AVAILABLE FOR

THOSE UNABLE TO ATTEND. THE CONTRACTOR WILL NEED

TO PLAN TO TRAVEL TO SCIP TO PRESENT AT THREE

MEETINGS AND CONDUCT THE SITE VISIT.

Q: IF PERCHED WATER IS ENCOUNTERED, DO THE

TEMPORARY GROUNDWATER WELLS NEED TO BE DEVELOPED

PRIOR TO SAMPLING?

A: CONTRACTOR SHALL PROPOSE WHETHER OR NOT

DEVELOPMENT IS PLANNED PRIOR TO THE COLLECTION OF

PERCHED GROUNDWATER. FOR PURPOSES OF THIS BID,

ASSUME THAT NO DEVELOPMENT WILL OCCUR PRIOR TO

SAMPLE COLLECTION.

Q: IF PERCHED WATER IS ENCUONTERED, DOES BIA

WANT A QUICK TURNAROUND (I.E., 24-HOUR TAT) ON

THE GROUNDWATER RESULTS TO ALLOW FOR PROMPT WELL

REMOVAL IF RESULTS ARE BELOW PROJECT ACTION

LIMITS?

A: FOR PURPOSE OF THIS BID, ASSUME NO QUICK

TURNAROUND OF THE ANALYSIS RESULTS.

Q: IF PERCHED WATER IS ENCOUNTERED, PLEASE

CONFIRM GROUNDWATER SAMPLES ARE TO BE ANALYZED

FOR TPH FOR BOTH THE DIESEL RANGE ORGANICS (DRO)

AND OIL RANGE ORGANICS (ORO) AS WELL AS PCB AND

PAHs.

A: GROUNDWATER SAMPLES ARE TO BE ANALYZED USING

EPA METHOD 8015M (DRO AND ORO) PCBs, AND PAHs.

NAICS CODE 562910 WITH A 750-EMPLOYEE SIZE

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140A1119Q0021/0004

STANDARD.

INTERESTED BIDDERS MUST PROVIDE A TECHNICAL

PROPOSAL IN ADDITION TO ITEMS IN SPECIFIED ON

PAGE 73.

NO OTHER CHANGES TO THIS SOLICITATION.

Legacy Doc #: IA

SCIP 2018/2019 Supplemental PCB Site

Investigation and EPA Cleanup Application. New requirement for performance of a Supplemental

Site Investigation at the SCIP O&M Yard and adjacent private properties to complete necessary site assessment activities needed for development and submittal of a PCB Cleanup Application to

USEPA for approval to remediate the yard once all necessary site investigattions are completed.

SCIP 2018/2019 PCB Supplemental Site Investigation

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it.