Final REQUIREMENTS.docx
DOCX document 32 KB Posted
- Attached to
- PLATINUM DISHES (Stanford Advanced Materials PT0448 or equal) Federal contract opportunity
- Solicitation number
- 1333ND23QNB680484
About this file
This statement of work document outlines requirements for a federal contract to procure four platinum dishes from a qualified vendor. Key details include:
-
The National Institute of Standards and Technology requires four platinum dishes measuring approximately 90mm in diameter, 50mm in height, with a 0.33mm base thickness and 110g weight, made of 99.95% pure platinum, for use in sample dissolution and fusion.
-
Delivery must occur within four weeks of award to NIST's Gaithersburg, Maryland facility. On-site visual inspection will be conducted to verify condition upon receipt. Payment of 100% will be made within 30 days of acceptance.
The related solicitation is identified as number 1333ND23QNB680484 to procure these platinum dishes from Stanford Advanced Materials model PT0448 or an approved equal. Responses were due within four weeks to support the stated delivery timeline.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment I 1333ND23QNB680484.docx | DOCX document | |
| REQUIREMENTS.docx | DOCX document | |
| 1333ND23QNB680484.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK/REQUIREMENTS DOCUMENT
Title: Platinum Dishes Requesting Lab: PML, Radiation Physics Division, Radioactivity Group
BACKGROUND INFORMATION AND SCOPE
Sample dissolution by fusion of large environmental samples (~ 10 g) requires using platinum dishes as an inert fusion vessel’s material and sustaining high temperature ~ 1100 °C.
The Contractor shall deliver a quantity of four (4) platinum dishes, inclusive of FOB Destination delivery.
MINIMUM REQUIREMENTS
The Contractor shall provide platinum dishes that meet all technical specifications identified below.
All items must be new. Used or remanufactured equipment will not be considered for award. Experimental, prototype, or custom items will not be considered. The use of “gray market” components are not authorized for sale in the U.S. by the Contractor is not acceptable. All line items shall be shipped in the original manufacturer’s packaging and include all original documentation and software, when applicable.
Item 0001 Platinum Dishes (Stanford Advanced Materials PT0448 or equal) Quantity: Four (4) Technical Specifications:
1. 99.95% pure platinum (5% Au)
2. Capacity of 250mL
3. Semi-round shape for use for fusions and evaporations
| Capacity, ml |
| Top Diameter, mm |
| Height, mm |
| Base thickness, mm |
| Weight, g |
| 250 |
| ~ 90 |
| ~ 50 |
| ~ 0.33 |
| ~ 110 |
DELIVERABLES
| Description |
| Quantity or Format |
| Due Date |
| Platinum dishes per the above technical specifications |
| 4 |
| NLT three 4 weeks after award |
DELIVERY TERMS
Delivery shall be F.O.B Destination or equal INCOTERMS such as delivered duties paid (DDP) and shall occur not later than 4 weeks from date of an award. Platinum dishes must be polished to mirror quality reflection, thoroughly cleaned, and inspected prior to packaging and delivery.
FOB Destination means: The contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for any loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order; and pay all charges to the specified point of delivery. The contractor shall deliver all Line Items to:
National Institute of Standards and Technology Shipping and Receiving 100 Bureau Drive, Building 301 Gaithersburg, MD 20899
***Due to ongoing limited site access of the NIST facilities, the Awardee SHALL confirm with the Designated Government Official and the Contracting Officer prior to ANY shipment to NIST***
INSPECTION & ACCEPTANCE
A visual inspection of the equipment will be performed by the NIST SME to identify surface defects or any form of indication that any equipment was damaged during transport to NIST. The Government shall have sole discretion to require repair or replacement of damaged and/or nonconforming supplies at no cost to the Government. The Government at any time prior to acceptance shall reject the equipment due to defects and/or nonconformance. The vendor is responsible for latent defects discovered any time after final inspection. However, the extent of its liability shall be prorated over the useful life of the equipment.
Ownership of the equipment shall transfer to NIST upon acceptance by the Government.
The Government will inspect and accept or reject the equipment within 10 working days of the receipt of the equipment unless otherwise indicated above.
PAYMENT SCHEDULE
Advance payment is not authorized. The Contractor must invoice in arrears according to the payment schedule. The Contractor shall be paid, in accordance with Net 30-day payment terms, upon receipt and acceptance of a proper invoice, in accordance with the following schedule:
1. 100% after acceptance by the COR with assistance of the SME of materials, AND
1. After receiving an invoice submitted properly, IAW the purchase order terms and conditions.
File details come from the government source that posted it. Updated .