SF-30 Amendment 0001.doc

DOC document 85 KB Posted

Attached to
HVAC Chiller Replacement Narragansett RI Federal contract opportunity
Solicitation number
1305M220QNFFM02554
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Chiller Replacement Narragansett RI, newest first.
File Type Posted
SOW - Chiller Replacement Narragansett_6_29_2020_Final (6).docx DOCX document
Contractor Past Performance Reference Sheet.pdf PDF
Construction Clauses.doc DOC document
Rhode Island Wage Determination RI20200001 - 6-19-20.docx DOCX document
FormSF1442.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code
Page of Pages
1
2
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req. No.
5. Project No. (if applicable)
0001
July 29, 2020
NFFM7021-20-02554
6. Issued By
Code AJF10014
7. Administered By (If other than Item 6)
Code

NOAA/Eastern Acquisition Division 200 Granby Street, Suite 815

Norfolk, VA 23510 See Block 6

8. Name and Address of Contractor (No., Street, County, and Zip Code)
(X)
9A. Amendment of Solicitation No.
X
1305M220QNFFM02554

9B. Date (See Item 11)

06/30/2020

10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code
Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers
X
is extended

is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning
1
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer

submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x)
A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor
is not,
is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amend Soliciation and Answer Questions 1305M220QNFFM02554 as follows:

1. See Page 2 for questios and answers. Note that answers to questions specify and further define requirements.

2. The due date for receipt of quotes remains July 31, 2020 at 11:00 a.m.

3. Except for the changes made herewith, all other terms, conditions, and provisions remain unchanged.

1. SOW Item 2. Is this just from the new chiller to the breaker panel or from the panel back to the main supply. We understand the three small pumps get all new wiring.

Answer: It will depend on the amperage of the new chiller package. The existing disconnect is 350 amps. You may need to change the breakers if the new unit is a lesser amperage. The circulator pumps will have new lockable disconnects and wiring from the load side of the new disconnects to the pumps which includes new seal tite and connector etc.

2. Please confirm if any state, local, and/or Federal permits will be required on this project?

Answer: No permitting. follow all local state and federal codes, BOCA,NEC etc as stated in the contract documents.

3. Please confirm if there are any known hazardous materials?

Answer: No known Hazardous materials.

4. SOW states to install NEMA rated disconnect. NEMA is a standard for manufacturing. The SOW does not specify the NEMA type of enclosure. Please confirm if the new disconnects are to be NEMA 4X Stainless?

Answer: NEMA Enclosure type 3R (standard rain tite) lockable.

5. Please confirm a horse power or amperage draw on the existing in line circulator pumps so that we can properly size the new disconnects.

Answer: Chilled water circulators : 3/4 hp 208 volts 3ph 2.45 amps

1.5 hp 208 volts 3 ph 5.2 amps.

6. Please confirm if taxes should be carried in proposals?

Answer: The quote should not reflect taxes. The federal government is tax exempt.

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print)
16A. Name and title of Contracting Officer (Type or Print)
15B. Contractor/Offeror
15C. Date Signed
16B. United States of America

(Signature of Contracting Officer) 16C. Date Signed

_____________________________________________(Signature of person authorized to sign)

NSN 7540-01-152-8070
30-105

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE

Prescribed by GSA FAR (48 CFR) 53.243