About this file
This document is a Brand Name/Sole Source Justification for the procurement of General Dynamics URC-300 UHF/VHF transceiver assemblies, power supplies, and software. The rationale for the sole source award is that the requested items must be compatible with existing radio systems and infrastructure, and procuring a different brand would require substantial redesign and modifications that would result in unacceptable delays and duplication of costs. The justification cites FAR provisions that allow for sole source awards when an item is unique or highly specialized, or when it is a logical follow-on to an existing order. The associated federal contract opportunity is a solicitation for the General Dynamics radio transceivers, which will be awarded on an all-or-none basis to the responsible offeror whose quote conforms to the requirements and is most advantageous to the government. Quotes are due by the response date listed in the posting.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 13. Combined Synopsis & Solicitation - N6426725Q4018.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 |
BRAND NAME/SOLE SOURCE JUSTIFICATION (SAM) SAT
LIMITED-SOURCES JUSTIFICATION (GSA) SAT
JUSTIFICATION FOR AN EXCEPTION TO FAIR OPPORTUNITY
(ID/IQ TASK ORDER/DELIVERY ORDER) SAT
1. Description of Supplies/Services.
Part Number Description Brand Qty 01-P58564R002 URC-300 UHF/VHF Transceiver Assembly, COTS
General Dynamics 2
53-P58597R001 AC/DC Power Supply (10W) General Dynamics 2 30-90MHz Software Feature URC-300 frequency expansion
General Dynamics 2
The requested supplies services represent the minimum requirements of the Government, which have been verified by the certifying technical and requirements personnel.
2. Regulatory Authority Permitting Other Than Full and Open Competition.
SAM
FAR 13.106-1(b)(i) Soliciting from a single source
FAR 13.106-1(b)(ii) Particular brand-name item
GSA
FAR 8.405-6(a)(i)(1)(A) An urgent and compelling need exists
FAR 8.405-6(a)(i)(1)(B) Only one source is capable of providing the supplies or services required at the level of quality required because the supplies or services are unique or highly specialized
FAR 8.405-6(a)(i)(1)(C) In the interest of economy and efficiency, the new work is a logical follow-on to an original Federal Supply Schedule order provided that the original order was placed in accordance with the applicable Federal Supply Schedule ordering procedures (the original order or BPA must not have been previously issued under sole-source or limited-sources procedures).
FAR 8.405-6 (b) Items peculiar to one manufacturer (brand-name item) ID/IQ Task Order/Delivery Order (e.g. NASA SEWP or ARMY CHESS)
FAR 16.505(b)(2)(i)(A) The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.
FAR 16.505(b)(2)(i)(B) Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized
2 |
FAR 16.505(b)(2)(i)(C) The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order. [When utilizing this exception, the rationale shall describe why the relationship between the initial order and the follow-on is logical (e.g., in terms of scope, period of performance, or value).]
FAR 16.505(b)(2)(i)(D) It is necessary to place an order to satisfy a minimum guarantee.
FAR 16.505(b)(2)(i)(E) For orders exceeding the simplified acquisition threshold, a statute expressly authorizes or requires that the purchase be made from a specified source.
FAR 16.505(b)(2)(i)(F) In accordance with section 1331 of Public Law 111-240 ( 15 U.S.C.
644(r)), contracting officers may, at their discretion, set aside orders for any of the small business concerns identified in 19.000(a)(3). When setting aside orders for small business concerns, the specific small business program eligibility requirements identified in part 19 apply.
FAR 16.505(b)(2)(i)(G) For DoD, NASA, and the Coast Guard, the order satisfies one of the exceptions permitting the use of other than full and open competition listed in 6.302 ( 10 U.S.C.
3406(c)(5)). The public interest exception shall not be used unless Congress is notified in accordance with 10 U.S.C. 3204(a)(7).
3. Rationale Justifying Use of Cited Regulatory Authority.
a.) The Items Described in Paragraph 1 Must Be Compatible In All Aspects (Form, Fit And Function) With Existing Systems Presently Installed.
b.) A Patent, Copyright, or Proprietary Data Limits Competition.
c.) The Items Described in Paragraph 1 are “Direct Replacements” Parts/Components for Existing Equipment.
d.) Foreign Military Sales (FMS) Supported By A Case Letter.
e.) Unusual and Compelling Urgency.
Equipment needs to interface with existing radio system as designed without additional modifications that would incur additional costs and design delay. Current and existing radio systems use URC radios and expect matching connections and control interfaces and capability.
3 | f.) Other: If required, discuss any other rationale that supports the use of a brand name/sole source for this effort.
4. Implication of Procuring Another Brand/Manufacturer.
a.) Unacceptable Delays in Fulfilling the Agency’s Requirements.
b.) Substantial Duplication Of Cost To The Government That Is Not Expected To Be Recovered Through Competition.
c.) Other: If required, discuss any other implication of procuring another brand/manufacturer.
Procurement of a different radio transceiver would require substantial design revision to accommodate a different form factor, connection design, cable design, control method, and audio balancing. It would also incur additional training to instruct users in alternate radio transceiver operation.
TABLE 1
EFFORT
MAN
HOURS
LABOR RATE COST
Redesign Radio Connections
Redesign Radio Mounting
Adjust Audio Voter to account for dissimilar radio
Additional for Installation due to redesign delays
Additional trip Labor Troubleshooting
Total Cost
4 |
5. Actions to Remove Barriers to Competition.
CERTIFICATION
I certify that the facts and representations under my cognizance, which are included in this justification and its supporting data/documentation, are complete and accurate to the best of my knowledge and belief.
CUSTOMER:
Name, Title, Code Phone No. Date
APPROVALS
I certify that the Customer representations above have been verified, and are complete and correct to the best of my knowledge. I understand that the processing of this brand name/sole-source justification precludes the use of full and open competition.
CONTRACT ADMINISTRATOR/SPECIALIST:
Name, Title, Code Phone No. Date
I certify that this justification is accurate and complete to the best of my knowledge and belief, and that completing this purchase as a brand name/sole source is in the best interest of the Government.
CONTRACTING OFFICER:
Name, Title, Code Phone No. Date
For the reasons stated in Paragraph 3(a) and 4(b), NSWC Corona does not have plans at this time to compete future contracts for the types of supplies/services covered by this document. If another potential source emerges, NSWC C will assess whether competition for future requirements is feasible.
RICHMOND.TASHELL.ANN.102325
Digitally signed by
RICHMOND.TASHELL.ANN.1023253816
Date: 2024.10.24 08:24:52 -07'00'
File details come from the government source that posted it. Updated .