Amendment_0001.pdf
PDF 991 KB Posted
- Attached to
- PMC Concrete work Federal contract opportunity
- Solicitation number
- 12SPEC18Q0026
About this file
Amendment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specs.pdf | ||
| WageRates.pdf | ||
| Solicitation-12SPEC18Q0026.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendments and clarifications to the Bridger Plant Materials Center concrete construction solicitation
I. In relation to the replacement of the concrete apron on the west side of the shop/machine shed (see Statement of Work, Section D), the contractor is required to remove and dispose of the existing frost-free hydrant and culvert (see Figure 1 below). These materials, as well as the rest of the concrete apron, shall be properly disposed of in an approved landfill or recycling facility. The contractor will replace the old frost-free hydrant with a new one (provided by NRCS), backfill the hole with gravel to required sub-base grade, and wrap the hydrant where it is likely to be in contact with the new concrete with a sleeve of weather resistant foam to allow expansion and contraction of the concrete without damaging the hydrant. The new concrete apron will be poured up to the foam sleeve and hydrant, covering the previous opening.
Figure 1. Hydrant west side of shop/machine shed.
II. In relation to the replacement of the sidewalk on the east side of the shop/machine shed (see Statement of Work, Section B), the contractor is required to remove and dispose of the existing frost-free hydrant and culvert (see Figure 2 below) at the north end of the walk.
These materials, as well as the rest of the sidewalks, shall be properly disposed of in an approved landfill or recycling facility. The contractor will plug/cap the opening in the existing water line with a threaded plug, backfill the existing hole with gravel to the required sub-base grade, and then pour the new concrete sidewalk over top of the backfilled hole.
Figure 2. Frost free hydrant at north end of east sidewalk.