Attachment_2_Prescribed_Burn_Checklist.pdf
PDF 490 KB Posted
- Attached to
- NRCS Minnesota WRP Prescribed Burns Federal contract opportunity
- Solicitation number
- 12FPC319Q0056
About this file
This solicitation is for prescribed burn services on Wetland Reserve Easement Program sites in Minnesota. The Natural Resources Conservation Service will award an indefinite delivery/indefinite quantity contract with a five year ordering period to conduct prescribed burns on approximately 30,000 acres across over 400 easement sites. Work will be performed on private lands under easement. Services include assessing burn conditions, constructing firebreaks, conducting test burns, and post-burn management. The estimated award date is September 12, 2019. This is a 100% small business set-aside for NAICS code 238990. Quotes are due by September 10, 2019 and the contract will have definite quantities ordered at fixed prices. The contractor must comply with service contracting requirements and will be paid via electronic funds transfer.
Prescribed Burn Checklist
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1_Statement_of_Work.pdf | ||
| Attachment_6_Certifications_Representations.pdf | ||
| Attachment_5_Wage_Determination.pdf | ||
| Attachment_4_Planning_and_Conducting_Prescribed_Burns.pdf | ||
| Adendum_52.212-1_Instructions_to_Offers.pdf | ||
| Attachment_3_Practice_Standards_338_394.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prescribed Burning
PRESCRIBED BURN CHECKLIST
(To be reviewed and filled out DAY OF BURN by Fire Boss)
NOTE: Parties igniting a prescribed burn may be liable for damages resulting from the fire and control cost, should fire escape the designated area.
A. Pre-burn Checklist: (Day of Burn)
1. Weather forecast favorable YES___ NO___
2. Necessary firebreaks constructed YES___ NO___
3. Potential hazards accounted for YES___ NO___
4. Special precaution areas noted YES___ NO___
5. Backup/secondary firebreak locations noted YES___ NO___
6. Safety equipment adequate YES___ NO___
7. Tools/equipment on-site YES___ NO___
8. Personnel needed available YES___ NO___
9. Special considerations reviewed with crew YES___ NO___
IF ANY OF THE ABOVE ARE ANSWERED “NO”, DO NOT BURN
10. Actual weather at burn:
Acceptable Conditions: Preferred: Actual: Time Recorded:
1. Air Temperature 40-70 degrees F. F_________ ______ _____________
2. Relative Humidity 30%-60% %RH______ ______ _____________
3. Soil Damp to Touch at Time of Burn
4. Wind Speed 5-15 mph mph ______ ______
5. Acceptable Wind Direction steady from: _________________________ YES___ NO___
6. Preferred Wind Direction steady from: ___________________________ YES___ NO___
7. Actual wind Direction: __________________________
11. Fronts or changes expected? YES____ NO_____
12. Notification of units of government made:
Local Fire Dept.(name) ____________________________ phone: ________________________ Sheriff/County Dispatch ____________________________ phone: _______________________
13. Notification of Neighbors Name:___________________________________ Phone:_______________________________ Name:___________________________________ Phone:________________________________ Name:___________________________________ Phone:________________________________ Name:___________________________________ Phone: _______________________________
14. Necessary permits obtained (if any): YES____ NO____
Additional Comments: ________________________________________________________________________________
Checklist completed by: ______________________________ DATE:_______________
B. Post-burn Evaluation (Day of Burn):
1. Burning method used
2. Start of burn Beginning Time: _____________ a.m. (_____) p.m. (____)
Mop Up Completed Ending Time: ________________a.m. (_____) p.m. (____)
3. Observed change in weather conditions during the burn:
4. Fire behavior: (check one)
a. Spotting none(_____) few(________) many(_______)
b. Difficult to control yes (________) no (_______)
c. Convection column yes (________) no (_______)
d. Fire whirls yes (________) no (_______)
5. Objective of burn met: yes (________) no (_______)
6. Post-burn management plan (additional treatments needed):
7. Future burn needed Yes (________) No (_______)
8. Other comments:
Evaluation Completed by:
Signature: ________________________________________________ Date: _____________
Attachment 3
File details come from the government source that posted it. Updated .