Change_log.docx
DOCX document 13 KB Posted
- Attached to
- Ozan Creeks Watershed Site 19 Repair Project Federal contract opportunity
- Solicitation number
- 12FPC219B0010
About this file
Drawings Change Log
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BIDOPENINGRESULTS.pdf | ||
| _RB_OzanSite19_Revised_8-15-19_Final_Stamped.pdf | ||
| Contractor_Questions.docx | DOCX document | |
| 12FPC219B0010_with_sf1442.pdf | ||
| AR20190047_01042019.pdf | ||
| Ozan_19_Repair_Drawing_Revised_6-11-19_stamped.pdf | ||
| _Ozan_19_Specification_Package_final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ozan 19 Drawings change log
Cover page
· Font changes for fit and consistency with standards
· Vicinity map changed
· Layout adjusted to accommodate font and map changes
· Construction note #5 added
· Label formatting adjusted
· Proximity map changed from topo to aerial
· Page numbering corrections
File details come from the government source that posted it.