129JGP20R4013 - Peck Rd Haz IRSC.pdf
PDF 1022 KB Posted
- Attached to
- Peck Rd Hazard Tree IRSC Stewardship Federal contract opportunity
- Solicitation number
- 129JGP20R4013
About this file
This federal solicitation seeks stewardship services for the Peck Rd Hazard Tree Project located on the Bass Lake Ranger District of the Sierra National Forest. The 305-acre project requires felling, skidding, and removing approximately 1,402 CCF of sawtimber and 3,721 CCF of biomass/cull logs from roadside hazards along 8S09, as well as road maintenance. Interested parties must submit responses by June 25, 2020. The Department of Agriculture Forest Service R5-Pacific Southwest Region will award the contract within 60 days thereafter, contingent upon satisfactory proposals. Pricing will be through an exchange of goods and services, with stewardship credits established for mandatory work activities and timber/product schedules setting minimum acceptable offers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Contract Area Map - Peck Rd Haz IRSC.pdf | ||
| Appendix A - Peck Rd Haz IRSC.pdf | ||
| Wage Determination SCA-1977-0727.pdf | ||
| Experience Questionnaire.docx | DOCX document | |
| Fire Plan - Peck Rd Haz IRSC.pdf | ||
| Appendix B - Peck Rd Haz IRSC.pdf | ||
| Appendix C - Peck Rd Haz IRSC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
9JGP
NEVADA CITY CA 95959
631 COYOTE STREET
R5 CENT-CAL ACQ SERV AREA CCASA
USDA FOREST SERVICE
9JGP CODE 16. ADMINISTERED BYCODE
X
X
113310
SIZE STANDARD:
% FOR:SET ASIDE:UNRESTRICTED OR9JGP
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
07/27/2020 1500 PT
06/25/2020
530-478-6142CRAIG ERICSON
(No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
129JGP20R4013
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 76 1000818OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
NEVADA CITY CA 95959
631 COYOTE STREET
R5 CENT-CAL ACQ SERV AREA CCASA
USDA FOREST SERVICE
15. DELIVER TO
NEVADA CITY CA 95959
631 COYOTE STREET
R5 CENT-CAL ACQ SERV AREA CCASA
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
USDA FOREST SERVICE
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Bass Lake Ranger District, Sierra NF Peck Rd Hazard IRSC Stewardship
Submit final proposal document responses to Craig Ericson at craig.ericson@usda.gov
0001 See Section B.2 - Schedule of Items
Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
X
XX
DATED
CRAIG ERICSON
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
76 2 of
Peck Road Hazard Tree IRSC Page 3 of 76
PART I – THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 GENERAL INFORMATION:
Proposals shall be valid for 60 days after the date of receipt for the solicitation. If additional time is needed, an extension will be requested. Refer to Section L for instructions on preparing your proposal and pricing.
Bonds: Bid Bonds, Payment Bonds, and Performance Bonds are not required for this project.
All Contractors must be actively registered in the System for Award Management (SAM) (https://SAM.gov) to be eligible for award under this solicitation. If not actively registered by time of proposal evaluations, you will be found non-responsive. Registration in SAM is a free service – you do not need to pay to register in this system. If your registration is not active, you will not be considered for award.
B.2 SCHEDULE OF ITEMS
B.2.1 MANDATORY WORK ACTIVITIES:
Contractor Name
ITEM
NO.
DESCRIPTION OF
MANDATORY WORK ACTIVITIES UNIT
ESTIMATED
QUANTITY
UNIT
PRICE TOTAL
1 Stewardship Credit 90% of Timber Product Value XXXXX XXXXX
Fall and Skid Hazard Trees: Fall and buck designated hazard trees, skid biomass, cull logs, and sawtimber
Acres 305.3 $ $
Total All Mandatory Service Items $
B.2.2 OPTIONAL WORK ACTIVITIES:
Contractor Name
ITEM
NO.
DESCRIPTION OF
OPTIONAL WORK ACTIVITIES UNIT
ESTIMATED
QUANTITY
UNIT
PRICE TOTAL
None $ $
Total All Optional Service Items $
Peck Road Hazard Tree IRSC Page 4 of 76
B.2.3 TIMBER/PRODUCT REMOVAL PRICE SCHEDULE:
Note: These schedules are for pricing/payment purposes. See Instructions to Offerors for business proposal requirements.
NOTE: Price Proposals MUST be provided on ALL Items in Schedules: Mandatory Work and Option Work Activities and Timber or other products Removal Price Schedule. Unit prices prevail.
B.3 LAND MANAGEMENT ACTIVITIES.
Performance of land management activities shall be in accordance with Section C – Project Description and Work Specifications. Payment for Land Management Work Activities in Schedule B-2.1 will be made in Stewardship Credits in lieu of cash, as defined in Section G. All Base Work Activities shall be performed.
Option activities are listed in order of planned priority. Award may be made for option items in any order that the Contracting Officer determines is in the best interest of the Government.
SPECIES PRODUCT QUANTITY UNIT OF
MEASURE
MINIMUM
ACCEPTABLE
OFFER
OFFER
(FLAT)
TOTAL
OFFER
Combined Softwood Sawtimber 1,402 CCF 1.67 $ $
Cull Logs Combined Biomass 3,721 CCF 1.67 $ $
Total – All Products $
Peck Road Hazard Tree IRSC Page 5 of 76
SECTION C – DESCRIPTION/ SPECIFICATIONS/STATEMENT OF WORK
C.1 AGAR 452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C.2 Project Description
(a) Description of Work – The Peck Rd Hazard Tree Project was developed to reduce hazardous trees along the Peckinpah Road (8S09). This road is a highly traveled road for recreation, and forest employees causing a safety concern. The Project area is approximately 305 acres of felling, skidding and removal of roadside hazards along Forest Service road 8S09 from the intersection of 8S09 and 7S07 for 5 miles and is divided into five units.
The Project is located on the Bass Lake Ranger District of the Sierra National Forest within the Whiskey Fall Recreation Area and as indicated on the Contract Area Map. Project objectives for the project area are summarized as follows:
• Improve Forest Safety and Health in the recreation area by removing hazard trees along Forest
Service road 8S09. The project will remove all dead and dying trees, as well as the slash created from these trees that pose a threat.
• By removing the hazard trees the forest will be starting to site prep the forest for future management objectives.
(b) Resulting Contract – Any resultant contract will be a commercial services contract with requirements for timber removal.
(c) The project is located in the Whiskey Fall recreation area and approximately 2 miles to the west end of the Dog House Timber sale. The legal description is T7S R23E., Section: 22, 27, 28, 33, 34 and T8S R23E., Section: 3 of the Mount Diablo Base Meridian.
C.3 Specifications
Specifications for each Stewardship Activity individually described by an item number in Schedule B pages can be found in Appendix A. Specifications for timber removal can be found in Appendix B. Road Maintenance plans and specifications can be found in Appendix C.
C.4 Contract Area Map
The boundaries of Subdivisions or Payment Units and any cutting units thereof, are as shown on the attached "Contract Area Map," which is made a part hereof, and were, before solicitation, designated on the ground by Forest Service to meet the anticipated needs of the parties. The location of the Subdivisions or Payment Units and their approximate acreage are stated in Division A/AT. Subdivisions or Payment Units may be revised and additional ones may be established only by written agreement of both parties. Where applicable, the following are also identified on Contract Area Map:
(a) Identified claims limiting Contractor's rights;
(b) Boundaries of cutting units;
(c) Areas where leave trees are marked to be left uncut;
(d) Roads listed
(e) Sources of base course, rock riprap and surface rock;
Peck Road Hazard Tree IRSC Page 6 of 76
(f) Roads where log hauling is prohibited or restricted;
(g) Roads and trails to be kept open;
(h) Improvements to be protected;
(i) Locations of known historical sites;
(j) Maximum stump heights when more than one height is listed by areas;
(k) Skidding or yarding methods specified;
(l) Streamcourses to be protected;
(m) Other features required by Appendix B; and
(n) Boundaries of stewardship work activities.
C.5 Government-Furnished Property
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause(s) contained in Section I of the contract.
Description of Property Value Quantity Return/Consumable
NONE
C.6 Operating Plan and Schedule:
The Contractor will provide a detailed timeline of when the contract requirements will be accomplished while conforming to the requirements within Section F.5. The operating plan should indicate the sequence of activities that will take place to accomplish the tasks described within the solicitation, Appendix A, Appendix B, Appendix C, and Appendix D including proposed start and completion dates. The operating plan and schedule should contain the following elements:
• A list of employees/personnel working on this contract identifying each by the Occupational Code/Job Title for the work as it applies to this contract under the applicable Service Contract Act wage rate.
• All Subcontractors must also provide a list of all employees/personnel working on this contract identifying each by their Occupational Code/Job Title as it applies to this contract under the applicable Service Contract Act wage rate.
• A proposed communication plan regarding findings, progress, information exchange, questions, and concerns of both parties.
Depending upon how the contractor proposes accomplishing the activities within the solicitation, the Operating Plan and Schedule may be developed by indicating when and how all work activities within individual units will be completed, when and how individual tasks will be completed, or a combination of when and how units or tasks will be completed. The contractor should be able to display through an operating plan and schedule that all of the contract activities will be accomplished in a timeline that will meet the contract requirements.
Key Personnel
The follow personnel are considered key personnel by the government: Field Representative. The contractor shall provide a field representative who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the field representative is absent shall be designated in writing to the contracting officer. The field representative or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The field representative or alternate shall be available between 7:00 a.m. to 5:00 p.m., Monday thru Friday except Federal holidays or
Peck Road Hazard Tree IRSC Page 7 of 76 when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below:
• The government desires that the field representative and Alternate have 10 years of experience in government contracts; and experience with non-sawtimber removal.
C.7 Sustainable Acquisition
The Contractor shall comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products.
In compliance with FAR Part 23.4 through performance of this contract, the Contractor shall make maximum use of EPA designated and USDA designated biobased in accordance with FAR clause 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts and 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts
The Contractor shall utilize products and material made from biobased materials (e.g. biobased greases, biobased hydraulic fluids, biobased absorbents) to the maximum extent possible in the performance of this contract without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. Information about this requirement and a catalog of products are available at the BioPreferred Web Site.
The Contractor shall utilize products and material to the maximum extent possible in the performance of this contract from EPA’s list of designated products and the accompanying recommendations for post-consumer content and recovered materials content in the following eight categories: Construction products, Landscaping products, Nonpaper Office Products, Paper and Paper Products, Park and Recreation products, Transportation Products, Vehicular Products, and Miscellaneous Products.
Compliance with the USDA Biobased requirements requires Contractors to report the purchase of biobased products under service and construction contracts through the System for Award Management (https://SAM.gov) and provide a copy of the report to the Contracting Officer.
7.1 Sustainable products identified for this solicitation:
The following is a list of categories for biopreferred products and EPA products that that may be used i n t h e performance of this contract. The list is not all inclusive; the Contractor shall research for available products.
7.1.1 BioPreferredProducts:
a Diesel Fuel Additives
(1) Any substance, other than one composed solely of carbon and/or hydrogen, that is intentionally added to diesel fuel (including any added to a motor vehicle's fuel system) and that is not intentionally removed prior to sale or use.
(2) Neat biodiesel, also referred to as B100, when used as an additive. Diesel fuel additive does not mean neat biodiesel when used as a fuel or blended biodiesel fuel (e.g., B20). 90% - Minimum Biobased Content.
http://www.biopreferred.gov/BioPreferred/ http://www.biopreferred.gov/BioPreferred/ http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm https://www.sam.gov/portal/SAM/%231 https://www.sam.gov/portal/SAM/%231 http://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml
Peck Road Hazard Tree IRSC Page 8 of 76 b Hydraulic Fluids - Mobile Equipment Hydraulic fluids formulated for general use in nonstationary equipment, such as tractors, end loaders, or backhoes. 44% - Minimum Biobased Content.
c Penetrating Lubricants Products formulated to provide light lubrication and corrosion resistance in close tolerant internal and external applications including frozen nuts and bolts, power tools, gears, valves, chains, and cables. 68% - Minimum Biobased Content.
d Greases - Truck Lubricants composed of oils thickened to a semisolid or solid consistency using soaps, polymers or other solids, or other thickeners. Lubricants that are designed for use on the fifth wheel of tractor trailer trucks onto which the semi-trailer rests and pivots. 71% - Minimum Biobased Content.
e Gear Lubricants Products, such as greases or oils, that are designed to reduce friction when applied to a toothed machine part (such as a wheel or cylinder) that meshes with another toothed part to transmit motion or to change speed or direction. 58% - Minimum Biobased Content.
f Fuel Conditioners Products formulated to improve the performance and efficiency of engines by providing benefits such as removing accumulated deposits, increasing lubricity, removing moisture, increasing the cetane number, and/or preventing microbial growths within the fuel system. 64% - Minimum Biobased Content.
h Erosion Control Woven or non-woven fiber materials manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose earth surfaces, which may be combined with seed and/or fertilizer to promote growth. 77% - Minimum Biobased Content.
g 2-Cycle Engine Oils Lubricants designed for use in 2-cycle engines to provide lubrication, decreased spark plug fouling, reduced deposit formation, and/or reduced engine wear. 34% - Minimum Biobased Content.
7.1.2 EPA Designated Products:
Plastic trash bags, printer ribbons, toner cartridges, print & writing papers, Traffic Barricades, Traffic Cones, Engine Coolants, Rebuilt Vehicular Parts, Re-refined lubricating oils, retread tires, manual grade strapping, signage, sorbents.
C.8 Definitions
Acceptable Quality Level: The allowable leeway or variance from a standard before the government will reject the specific service. An AQL does not say that the contractor may knowingly offer defective service.
It implies that the government recognizes that defective performance sometimes happens unintentionally.
As long as the percent of defective performance does not exceed the AQL, the service will not be rejected by the government. The contractor, however, must re-perform the defective service when possible.
Biobased Products: See Sustainable Acquisitions
Contracting Officer (CO): Individual with authority to bind the government with their signature on the contract.
http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm
Peck Road Hazard Tree IRSC Page 9 of 76
Contracting Officer Representative (COR): Individual(s) designated to act on the behalf of the CO within the delegation given them in writing.
Period of performance (also Performance period or Contract time): All calendar days allowed for completion of contract work. Includes all days of the week including weekends and holidays.
Quality Assurance: Those actions taken by the government to check goods or services to determine that they meet the requirements of the SOW.
Quality Assurance Surveillance Plan (QASP): An organized written document used for quality assurance surveillance. The document contains information about how the government will assess performance, checklists, and may contain decision tables.
Quality Control: Those actions taken by a contractor to control the production of goods or services so that they will meet the requirements of the Performance Statement of Work. Refer to Inspection and Acceptance in clause 52.212-4 and Contractors Quality Control Plan as described in Section E.
Random Sampling: A method of looking at a few individual items in a lot to determine the quality of that lot against a standard.
(Acceptable) Service: A job performed to the standard and within the acceptable quality level. The contractor must do the specific job, and meet the standard, and meet the acceptable quality level before one can say that performance has been acceptable and that he/she should be paid.
Standard: An acknowledged measure of comparison.
Stewardship Contracting: An exchange of goods/products for services including construction.
Sustainable Acquisitions (FAR Part 23.4 – Use of recovered materials and biobased products)
a. Biobased Products: Managed by the U.S. Department of Agriculture (USDA), the goal of the
BioPreferred program is to increase the purchase and use of biobased products. The BioPreferred program was created by the 2002 Farm Bill and reauthorized and expanded as part of the Agricultural Act of 2014 (the 2014 Farm Bill). The program's purpose is to spur economic development, create new jobs and provide new markets for farm commodities. The increased development, purchase, and use of biobased products reduce our nation's reliance on petroleum, increase the use of renewable agricultural resources, and contribute to reducing adverse environmental and health impacts. Information on biobased/biopreferred products can be found at the BioPreferred Site . The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts and the provision at FAR 52.223-1, Biobased Product Certification.
b. EPA-designated items: Products that are or can be made with recovered material. The Comprehensive Procurement Guideline (CPG) program is part of EPA's continuing effort to promote the use of materials recovered from solid waste. Buying recycled-content products ensures that the materials collected in recycling programs will be used again in the manufacture of new products. See FAR 52.223-17 Affirmative Procurement of EPA-designated items in Service and Construction Contracts.
C.8.1 Technical Definitions – See Appendices.
http://www.biopreferred.gov/BioPreferred/faces/pages/AboutBioPreferred.xhtml http://www.gpo.gov/fdsys/pkg/BILLS-113hr2642enr/pdf/BILLS-113hr2642enr.pdf http://www.biopreferred.gov/BioPreferred/ http://www.epa.gov/epawaste/conserve/tools/cpg/index.htm
Peck Road Hazard Tree IRSC Page 10 of 76
SECTION D – PACKAGING AND MARKING
There are no clauses in this section.
Peck Road Hazard Tree IRSC Page 11 of 76
SECTION E - INSPECTION AND ACCEPTANCE
General Clauses and Provisions Pertaining To All Items
E.1 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.acquisition.gov/far
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
E.2 Contractor Quality Control Inspection System
The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer. Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.
E.2.1 Quality Control Plan. The Contractor shall provide a general Quality Control Plan (QCP) with the technical proposal. The Contractor shall supplement the QCP within 7 days before start work based on items awarded to the Contractor and Government comments. The contractor shall conduct quality control inspections on all aspects of work. The field inspections shall be performed on each sub-item listed in each task order.
The general Quality Control Plan must demonstrate how the Contractor will assure quality meets the requirements and specifications of the contract. The Plan shall describe how quality will be monitored to assure the performance standards are met, the supervision of crew and work, and personnel that will be performing the quality control.
E.2.2 Contractor Quality Control Inspection At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.
Inspection procedures must provide the following information:
E.3 Acceptance
The Contractor’s shall provide a written request for inspection and submit inspection sheets in accordance with the QCP. The Government will conduct an inspection and up to one re-inspection for each unit. If the contractor fails to meet the minimum AQL, the contractor shall rework the unit. Anytime more than two inspections are required per unit, the contractor may be assessed for additional inspections, which will include mileage and hourly rate of the COR. If follow-up inspections indicate that the minimum AQL was not met, the work will be deemed unsatisfactory and a deduction in payment may result (Section G-3.4).
Acceptance may be made for all or portions of work.
E.4 Government Quality Assurance Surveillance Plan
Quality assurance specific to individual items will be found in Appendix A.
http://www.arnet.gov/far
Peck Road Hazard Tree IRSC Page 12 of 76
SECTION F - DELIVERIES OR PERFORMANCE
General Clauses and Provisions Pertaining To All Items
F.1 52.252-2 Clause Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.acquisition.gov/far
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-15 Stop-Work Order (Aug 1989) 52.247-55 F.O.B. Point for Delivery of Government-Furnished Property (JUN 2003)
F. 2 Commencement, Prosecution, and Completion of Work
The Contractor shall be required to (a) commence work under this contract in accordance with the accepted operation plan; starting work when the Contractor receives the Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire project including final cleanup of the premises by October 30, 2021.
See Section F.4 below for special contract time and performance restrictions concerning the performance of work on this contract. Additional restrictions on the Scheduling of Work for resource protection, etc. may be addressed in the Technical Specifications.
F.3 AGAR 452.211-74 Period of Performance (FEB 1988)
The effective period of this contract is from the date of award through 10/30/2021.
(End of Clause)
F.4 Special Contract Time and Performance Restrictions
The Contractor shall perform this contract according to the following restrictions. Additional performance restrictions may also be found in the Technical Specifications and/or on contract maps.
Contract Item or Area Description Description of Restriction None
F.5 Schedules and Reports
Contractor shall provide the following submittals as stated below unless otherwise mutually agreed upon. The Contractor shall update all submittals as needed, or as required by the CO, but in no case less than once per calendar year on a date specified by the Contracting Officer:
ITEM DESCRIPTION SUMBITAL
DUE
COPIES
REQUIRED
Proposed Operation Plan (Overall Schedule): The Contractor shall prepare and submit two copies (or one electronic copy) of a practicable schedule showing the order in which the Contractor proposes to perform the work, and
With Proposal 1 http://www.arnet.gov/far
Peck Road Hazard Tree IRSC Page 13 of 76 the starting and completion dates of various phases of the work. The schedule shall comply with the contract time requirements in the contract (or Task Order), including, but not limited to Paragraphs F.2 and F.5. The schedule shall be provided in either 8.5’x11’ or 11’x17’ format.
Subcontractors: List of proposed sub-contractors and their intended work.
Sub-contractors must have Contracting Officer’s written approval prior to starting work on the project.
With Proposal 1
Traffic Control Plan. The Contractor shall prepare and submit a Traffic Control Plan detailing conformance with OSHA requirements, MUTCD requirements, and all other contract requirements, including, but not limited to Paragraph H.9, “Traffic Control Plan” and the requirements included in the Appendices, if any.
10 days after issuance of Notice to Proceed
Safety Plan. The Contractor shall comply with the requirements of FAR 52.236-13 – Accident Prevention, for all activities under this contract.
(Paragraph I.2)
With Proposal 1
Quality Control Plan. Submit original with proposal. Any updates need to be provided for approval to the CO. Refer to E.2
With Proposal 1
Designation of Contractor personnel describing responsibilities and authorities
At prework Meeting 1
BioBased Report. Submit annually. Refer Section C.7 October 31
All schedules and reports shall be submitted to the Contracting Officer’s Representative identified by the CO, unless the Contracting Officer directs the Contractor to submit any schedules or reports directly to the CO.
Peck Road Hazard Tree IRSC Page 14 of 76
SECTION G – CONTRACT ADMINISTRATION DATA
General Clauses Pertaining To All Items
G. 1. Reserved
G.2 Measurement
All linear and area measurements under this contract are measured on a horizontal plane.
G.3 Payment
It is anticipated that funds will be exchanged in the performance of this contract because the value of the timber or other products will not completely offset the value of the work to be performed. Payment shall only be made under this clause to the extent that the work performed will not be offset by the timber or other products value during the contract period. When payment is made to the contractor for work performed, it will be made in accordance with FAR 52.212-4 Contract Terms and Conditions-Commercial Items (i) – Payments and 52.232- 33 Payment by Electronic Funds Transfer – System for Award Management (See clause 52.212-5). Submit certification G.8 with all invoices.
Invoices are to be submitted to: IPP
Payment will be made from the contractor’s invoice. All invoices are to be submitted via the electronic Invoice Processing Platform (IPP). This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. There are no pre-award registrations.
After award of a contract, please make sure that your company registers promptly at http://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.
The value of work completed and timber or other products removed will be documented in a Stewardship Statement of Account produced by Timber Sale Accounting (TSA) monthly when harvesting operations are underway.
G.3.1 Payment Reductions
G.3.1.1 Payments for tasks meeting stated minimum AQL or above
The Government expects to receive quality services. The minimum AQL is required to achieve a satisfactory performance rating. Full payment will be made for final work meeting at least identified AQL and above (As identified in Appendix A, Section VII.)
G.3.1.2 Payments for task with AQL between 1% and 10% below minimum AQL
If the task deliverable cannot or will not be reworked to achieve the minimum required AQL, payment of 90% of the unit price will be applied to tasks falling between 1% and 10% below identified AQL.
Example - 90% AQL is achieved on task with 95% AQL requirement (5% below minimum AQL.) Unit price is $10,000.00
10,000 x 90% = 9,000 price to be paid for unit.
http://www.ipp.gov/index.htm http://www.ipp.gov/vendors/enrollment-vendors.htm
Peck Road Hazard Tree IRSC Page 15 of 76
G.3.1.3 Payments for task with AQL between 11% and 20% below minimum AQL
If the task deliverable cannot or will not be reworked to achieve the minimum required AQL, payment of 90% of the unit price will be applied to tasks falling between 11% and 20% below identified AQL.
Example - 75% AQL is achieved on task with 95% AQL requirement (20% below minimum AQL.) Unit price is $10,000.00
10,000 x 90% = 9,000 x 75% = $6,750.00 price to be paid for unit.
G.3.1.4 Payments for tasks with AQL below 21% minimum AQL
If the task deliverable cannot or will not be reworked to achieve the minimum required AQL, payment of 80% of the unit price times the actual AQL received will be made for AQL falling below 21% required AQL.
Example - 70% AQL is achieved on task with 95% AQL requirement (AQL is 25% below minimum AQL.) Unit price is $10,000.00
10,000 x 80% = 8,000 x 70% = $6,400.00 price to be paid for unit.
G.3.2 Re-Inspection Costs
If rework of task(s) is required, the Contractor will be assessed the costs incurred by the Government in performing such activities. One inspection will be authorized at each of the draft stages and one at the final report stage.
• Any resubmittals of drafts will be re-inspected and will accrue re-inspection costs.
• If final report requires rework the resubmittal will be re-inspected and will accrue re-inspection costs.
The table below lists charge rates for Government re-inspection of work.
Activity Charge rate
Government wages (per employee performing re-inspection)
$50.00/hour
*Government mileage $0.575/mile
*Mileage reimbursement rate in effect January 1, 2016 is $.54 per mile. Mileage rates change periodically and the most current mileage rates for assessed damages at the time will be used. Most current mileage rates can be found at the General Services Administration website GSA Mileage.
G.3.3 FINAL PAYMENT - RELEASE OF CLAIMS
The Government shall pay the amount due the Contractor under this contract after—
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed invoice; and http://www.gsa.gov/portal/category/104715
Peck Road Hazard Tree IRSC Page 16 of 76
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release.
G.4 Incidental Payment Items
The intent of the contract is to provide for the complete performance of the project described in the contract.
Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.
G.5 Product Payment Guarantee
To guarantee payment for product in advance of cutting, Contractor may earn Stewardship Credits in advance of cutting, or provide a product payment guarantee in the form of an acceptable surety payment bond, irrevocable letter of credit (ILOC), cash, or a deposit in a Federal Depository negotiable securities of the United States.
Any earned stewardship credits and product payment guarantee together will maintain a minimum unobligated balance equal to the total value of product that has not been paid for from stewardship units released for cutting.
Securities shall be deposited through the Contracting Officer accompanied by a power of attorney and agreement authorizing the bond-approving officer to sell or collect such securities if payment is not made within 15 days of billing by Forest Service. The penal sum of such surety bond or the market value at time of deposit of such negotiable securities shall be the maximum amount of the payment guaranteed.
Product payment guarantee for a single contract shall be provided utilizing Form FS6500-12 Payment Bond.
Blanket Payment Bond:
a. Contractor may furnish an acceptable bond, or deposits securities, to guarantee payment for product from multiple contracts. Contractor shall not start cutting hereunder until this contract receives an allocation that will meet the obligation for product payment guarantee.
b. The amount of such bond or deposited securities shall be allocated to such contracts by the Forest Service. The Contractor shall provide the contact information for the Forest Service representative administering the blanket payment bond to the Contracting Officer. The Forest Service representative administering the blanket payment bond will provide the Contracting Officer with documentation showing the allocation to this contract.
c. When there is to be no product cutting or removal hereunder for 30 days or more and payment of current charges has been made, the allocation to this contract may be reallocated to other contracts at Contractor’s request.
d. Payment guaranteed with acceptable blanket payment bond for multiple contracts shall be provided utilizing Form FS-6500-12a Blanket Payment Bond.
G.6 Stewardship Credits
Stewardship Credits are credits that are earned and established when work listed in the B.1 Schedule of Supplies/Services has been performed and accepted. Stewardship credits shall be earned at the rate as shown in the Schedule. Earned credits may be used to pay for timber or other products value included in Schedule B.2.
Peck Road Hazard Tree IRSC Page 17 of 76
Unless otherwise indicated in the Schedules, credits will be earned based upon Actual Quantities accomplished and accepted.
G.7 Establishment of Stewardship Credits
Notwithstanding references to payments in “Payment” clauses of this contract, payment for Stewardship Activities will be made with Product Value or other funding as indicated in the award document.
Stewardship Credits will be established on a monthly basis. Stewardship credits will be established for the number of units of each activity that have been completed and accepted. Acceptance may be for all, or a reasonable portion of, any specific activity.
Stewardship credits will not be established for work that is in progress that has not been accepted by the Forest Service. No credits will be established for work performed under terms of Schedule B.2.3.
Peck Road Hazard Tree IRSC Page 18 of 76
G.8 Contractor Certification
Contractor will submit certification with every invoice and monthly, as Stewardship Credits are established.
The Contractor shall furnish the following certification indicating if for invoice, stewardship credit or both.
Credit will not be received if certification is not submitted.
CONTRACTOR CERTIFICATION
- Invoice and/or Stewardship Credit Earned
Page of Unit (Region, Forest, District)
Project: Contract No.
Name and Address of Contractor:
Invoice No. Invoice Date:
I hereby certify, to the best of my knowledge and belief, that--
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) Payments to subcontractors and suppliers have been made, and timely payments will be made for the work activities covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments/credits does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
(Name)
(Title)
(Date)
Peck Road Hazard Tree IRSC Page 19 of 76
G.9 Excess Stewardship Credits
In the event there are excess (unused) established Stewardship Credits when all of the included timber or other products has been cut and removed the Forest Service, at its option, shall either add more timber or other products or make cash payment for the unused credits.
G.10 Excess Timber or Other Products Value
In the event the value of the included timber or other products exceeds the total value of all of the mandatory activities plus the ordered optional activities, the Contractor shall make cash payment for the excess timber or other products value.
G.11 Refund of Excess Cash
If at any time the credit balance of the Stewardship Statement of Account exceeds the charges for timber or other products removed to date and for timber or other products that the Forest Service estimates will be cut within the next 60 calendar days, any portion of such excess from cash in the account shall be refunded if requested by Contractor. If no cutting is planned within the next 60 calendar days, refund of the entire unencumbered cash balance may be made. After a refund, deposits shall be made to meet the requirements of the clause entitled, “PRODUCT PAYMENT GUARANTEE” before additional timber or other products may be cut.
Peck Road Hazard Tree IRSC Page 20 of 76
SECTION H - SPECIAL CONTRACT REQUIREMENTS
General Clauses and Provisions Pertaining To All Items
H.1 AGAR 452.215-73 Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within 15 days after the date of contract award. The conference will be held at the ___TBD________, and will include discussion of contract terms and work performance requirements, work progress schedule and fire prevention/suppression and safety plans.
(End of Clause)
H.2 AGAR 452.236-72 Use of Premises (NOV 1996)
(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.
(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.
(End of Clause)
H.3 AGAR 452.237-74 Key Personnel (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel:
Field Representative
Information on key personnel qualifications are found in Section C.
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
(End of Clause)
Peck Road Hazard Tree IRSC Page 21 of 76
H. 4 Employment of Eligible Workers
a) Labor standards for contracts involving H-2B workers or migrant and seasonal agricultural workers
1. General
This contract is subject to the Migrant and Seasonal Agricultural Worker Protection Act (MSPA), 29 United States Code (U.S.C) 1801-1872, and to the U.S. Department of Labor (DOL) regulations implementing MSPA 29 Code of Federal Regulations (CFR) Part 500. MSPA eliminates activities detrimental to migrant and seasonal agricultural workers, requires registration of Farm Labor Contractors, and ensures necessary protection for the workers. Information regarding MSPA can be found at http://www.dol.gov/whd/mspa/index.htm.
This contract is also subject to the H-2B program under 8 CFR Section 274A provisions of the Immigration and Nationality Act (INA) for the admission of nonimmigrants to the U.S. to perform temporary labor or services. A Temporary Employment Certification with the Office of Foreign Labor Certification (OFLC) in the Department of Labor Employment and Training Administration is required if hiring H-2B workers. For further information on the requirements of the H-2B program, visit OFLC’s website at http://www.foreignlaborcert.doleta.gov/ or Wage and Hour’s website at http://www.dol.gov/whd/immigration/H2BFinalRule/index.htm.
Compliance with MSPA and the INA is a material condition of this contract. If the contractor employs any unauthorized worker(s) during the performance of this contract that violates section 274A of the INA, the Government may terminate the contract, in addition to other remedies or penalties prescribed by law.
2. Definitions
a) H-2B worker: as used in this part means a nonimmigrant holding a visa authorizing the individual to legally work in the US to perform temporary labor or services. A worker with an H-2B visa (“H-2B worker”) may also be considered a migrant agricultural worker under MSPA depending on the type and nature of work performed.
b) Migrant Agricultural Worker and Seasonal Agricultural Worker: as used in this part means individuals employed for agricultural (including forestry) work on a seasonal or temporary basis.
i. A worker, moving from one seasonal activity to another, is employed on a seasonal basis even though the worker may continue to be employed during a major portion of the year.
ii. An overnight absence from the migrant workers permanent place of residence is required.
iii. Members of the contractor's immediate family are not considered migrant or seasonal workers. Immediate family includes:
• Spouse
• Children, stepchildren, or foster children
• Parents, stepparents, or foster parents, or
• Brothers and sisters http://www.dol.gov/whd/mspa/index.htm http://www.foreignlaborcert.doleta.gov/ http://www.dol.gov/whd/immigration/H2BFinalRule/index.htm
Peck Road Hazard Tree IRSC Page 22 of 76
c) Farm Labor Contractor (FLC). As used in this part means a person including an individual, partnership, association, joint stock company or a corporation, who, for any money or other valuable consideration, paid or promised to be paid, performs any recruiting, soliciting, hiring, employing, furnishing, or transporting of any migrant or seasonal agricultural worker.
3. Registration Requirements
a) Any contractor providing or hiring H-2B nonimmigrants for work under this contract shall provide a copy of their Temporary Employment Certificate. General information about the H-2B program can be found on Fact Sheet # 78 at http://www.dol.gov/whd/regs/compliance/whdfs78.htm. Contractors can apply for the certificate through the US DOL Employment & Training Administration‘s on line iCERT Visa Portal System at https://icert.doleta.gov/.
b) Any contractor who meets the definition in (2.iii.) above providing or hiring migrant or seasonal workers to perform agricultural or manual forestry work shall first obtain a Federal DOL Farm Labor Contractor Certificate of Registration (http://www.dol.gov/whd/forms/fts_wh530.htm). The contractor shall carry the certificate at all times while engaged in contract performance and shall display it upon request. Any of the contractor's employees who perform any one or more of the activities defined as an FLC in paragraph (2.iii.) must have their own FLC Employee Certificate.
General information about MSPA can be found on Fact Sheet #49 at DOL Wage and Hour Divisions webpage http://www.dol.gov/whd/regs/compliance/whdfs49.htm.
4. Certifications
The Contractor shall provide applicable H-2B Temporary Employment Certificate or Farm Labor Contractor Certificate as part of their representations, certifications, and acknowledgements.
Subcontractor(s) meeting the definitions above shall follow the same requirements as the Prime Contractor. It is the Prime Contractor’s responsibility to ensure the Subcontractor’s information is provided to the Contracting Officer.
5. Worker Protections
a) Worker Information Posters
i. A contractor who uses the H-2B program to meet its temporary employment needs must post and maintain the H-2B poster (WH-1505) in a conspicuous location accessible to workers at the job site.
ii. The contractor shall display and maintain the MSPA poster (WH-1376) on the job site in a conspicuous location accessible to workers during the contract performance period.
b) Personal protective equipment
i. 29 CFR Subpart I, OSHA's personal protective equipment (PPE) standard, which includes 29
CFR 1910.132, contains the general requirements for the provision of personal protective equipment and requires employers to perform a hazard assessment to select appropriate PPE for hazards that are present or likely to be present in the workplace. Specific requirements for PPE are also presented in many different OSHA standards, published in 29 CFR.
ii. Before a worker begins operating equipment, the contractor shall train the workers on the safe operation and use of the equipment.
iii. The contractor shall provide the appropriate personal protective equipment for the work required to be performed in the contract, wherever necessary by reason of hazards or…