File Type Posted
sf30.doc DOC document
AmendedScheduleofItems.docx DOCX document
Challenge_Grazing_Map1.pdf PDF
Challenge_Grazing_Map2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #129JGP19Q0082 Challenge Fuels Reduction – Goat Grazing

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
1. REQUISITION NUMBER
PAGE 1 OF 27
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
961715
2. CONTRACT NO.
3. AWARD/EFFECTIVE
4. ORDER NUMBER
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE

DATE

129JGP19Q0082

DATE

June 13, 2019

7. FOR SOLICITATION INFORMATION CALL:
a. NAME

Jason Vermillion, Technical Teresa Reniff, Contracting

b. TELEPHONE NUMBER(No collect calls) 530-532-7434 530-532-7456

8. OFFER DUE DATE/LOCAL TIME

June 28, 2019 @ 4:30 pm

9. ISSUED BY CODE

10. THIS ACQUISITION IS |_| UNRESTRICTED OR |X| SET ASIDE: 100 % FOR

|X| SMALL BUSINESS |_| WOMEN-OWNED SMALL BUSINESS

|_| HUBZONE SMALL (WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

BUSINESS SMALL BUSINESS PROGRAM NAICS:

|_| SERVICE DISABLED |_| EDWOSB 115310

VETERAN- OWNED SIZE STANDARD:

SMALL BUSINESS |_| 8(A) $19.M

USDA Forest Service Central California Acquisitions 875 Mitchell Avenue Oroville, CA 95965

11. DELIVERY FOR FOB DESTINATION UNLESS BLOCK IS MARKED

|_| SEE SCHEDULE

12. DISCOUNT TERMS
|_| 13a. THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 CFR 700)
13b. RATING

14. METHOD OF SOLICITATION

|X| RFQ |_| IFB |_| RFP

15. DELIVER TO CODE

See specifications.

16. ADMINISTERED BY CODE

See block 9.

17a. CONTRACTOR/ CODE FACILITY

OFFEROR CODE

18a. PAYMENT WILL BE MADE BY CODE

Invoice Processing Platform (www.ipp.gov) All invoices must be submitted electronically through the Invoice Processing Platform IPP via www.IPP.gov

TELEPHONE N0.

|_| 17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
OFFER
IS CHECKED

|X| SEE ADDENDUM

19.
20.
21.
22.
23.
24.
ITEM N0.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

See separate schedule sheet.

PROJECT NAME: Challenge Fuels Reduction – Goat Grazing UNIT: Feather River Ranger District

Offers will be accepted hardcopy, email treniff@fs.fed.us or fax 530- 532-1210

Call Teresa Reniff @ (530)532-7456 to verify receipt

Contractor MUST be registered in the System for Award Management (SAM) in order to qualify for award.

Please provide the following information:

DUNS#______________________________

EMAIL ______________________________

(Use Reverse and/or Attach Additional Sheets as Necessary)

Please allow 2 days before inquiring about award status.

Offers must be fully received by the due date and time. Please plan accordingly.

25. ACCOUNTING AND APPROPRIATION DATA

See IAS requisition.

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

|X|
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
|X|
ARE
|_|
ARE NOT ATTACHED
|_|
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
|_|
ARE
|_|
ARE NOT ATTACHED
|X| 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______1________
|_| 29. AWARD OF CONTRACT: REF. OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
DATED .. YOUR OFFER ON SOLICITATION
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS: ____________________

30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER (Type or print)
31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTIONSTANDARD FORM 1449 (REV.2/2012)
PREVIOUS EDITION IS NOT USABLEPrescribed by GSA FAR (48 CFR) 53.212

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

Utilize goats to reduce/modify hazardous fuels with units: 30, 36, 922, Trail Unit (July 12, 2019 – October 31, 2021)

Task

32a. QUANTITY IN COLUMN 21 HAS BEEN

|_| RECEIVED |_| INSPECTED |_| ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ________________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER
34. VOUCHER NUMBER
35. AMOUNT VERIFIED

CORRECT FOR

36. PAYMENT
37. CHECK NUMBER

|PARTIAL | |FINAL

|_| COMPLETE |_| PARTIAL |_| FINAL

38. S/R ACCOUNT NUMBER
39. S/R VOUCHER NUMBER
40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41c. DATE

42b. RECEIVED AT (Location)

42c. DATE RECD (YY/MM/DD)
42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV.2/2012) BACK

52.212-4 -- Contract Terms and Conditions -- Commercial Items. (Jan 2017) IBR

52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Items (Aug 2018)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(4) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(5) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004)(Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

__ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L. 109-282) (31 U.S.C. 6101 note).

__ (5) [Reserved].

__ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).

__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).

__ (10) [Reserved].

__ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).

__ (ii) Alternate I (Nov 2011) of 52.219-3.

__ (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (ii) Alternate I (JAN 2011) of 52.219-4.

__ (13) [Reserved] __ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).

__ (ii) Alternate I (Nov 2011).

__ (iii) Alternate II (Nov 2011).

__ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

__ (ii) Alternate I (Oct 1995) of 52.219-7.

__ (iii) Alternate II (Mar 2004) of 52.219-7.

__ (16) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)).

__ (17)(i) 52.219-9, Small Business Subcontracting Plan (Aug 2018) (15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (Nov 2016) of 52.219-9.

__ (iii) Alternate II (Nov 2016) of 52.219-9.

__ (iv) Alternate III (Nov 2016) of 52.219-9.

__ (v) Alternate IV (Aug 2018) of 52.219-9.

__ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).

__ (19) 52.219-14, Limitations on Subcontracting (Jan 2017) (15 U.S.C. 637(a)(14)).

__ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657 f).

__ (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C. 632(a)(2)).

__ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).

__ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).

__ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

X_ (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2018) (E.O. 13126).

X_ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

X (28)(i) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).

(ii) Alternate I (FEB 1999) of 52.222-26.

__ (29)(i) 52.222-35, Equal Opportunity for Veterans (Oct 2015)(38 U.S.C. 4212).

(ii) Alternate I (JULY 2014) of 52.222-35.

_X (30)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).

(ii) Alternate I (JULY 2014) of 52.222-36.

__ (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).

__ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

__ (33)(i) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O. 13627).

__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

__ (34) 52.222-54, Employment Eligibility Verification (OCT 2015). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

__ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).

__ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).

__ (38)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

__ (ii) Alternate I (Oct 2015) of 52.223-13.

__ (39)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

__ (ii) Alternate I (Jun 2014) of 52.223-14.

__ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).

__ (41)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

__ (ii) Alternate I (Jun 2014) of 52.223-16.

__ (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) (E.O. 13513).

__ (43) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

__ (44) 52.223-21, Foams (JUN 2016) (E.O. 13693).

__ (45)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

__ (ii) Alternate I (JAN 2017) of 52.224-3.

_X (46) 52.225-1, Buy American—Supplies (May 2014) (41 U.S.C. chapter 83).

__ (47)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I (May 2014) of 52.225-3.

__ (iii) Alternate II (May 2014) of 52.225-3.

__ (iv) Alternate III (May 2014) of 52.225-3.

__ (48) 52.225-5, Trade Agreements (AUG 2018) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

__ (49) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (50) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

__ (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

__ (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

__ (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

__ (54) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

X_ (55) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Jul 2013) (31 U.S.C. 3332).

__ (56) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (Jul 2013) (31 U.S.C. 3332).

__ (57) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

__ (58) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

__ (59) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(12)).

__ (60)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

__ (ii) Alternate I (APR 2003) of 52.247-64.

__ (iii) Alternate II (FEB 2006) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.] __ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014)(E.O. 13495).

__ (2) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).

__ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (May 2014) (41 U.S.C. chapter 67).

__ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements (May 2014) (41 U.S.C. chapter 67).

__ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).

__ (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

__ (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792).

__ (11) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records—Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).

(iv) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(v) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.

(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015)

(vii) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).

(viii) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

(x) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212)

(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

X (xii) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).

(xiii) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O 13627). Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O 13627).

(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).

(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).

(xvi) 52.222-54, Employment Eligibility Verification (OCT 2015) (E.O. 12989).

(xvii) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).

(xviii) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

(xix)(A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

(B) Alternate I (JAN 2017) of 52.224-3.

(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

ADDENDUM TO FAR 52.212-5

The following clause(s) are hereby incorporated by reference or full text as appropriate:

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)

52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA

Alternate 1 (JUL 1995)

52.223-10 WASTE REDUCTION PROGRAM (MAY 2011)

52.223-12 REFRIGERATION EQUIPMENT AND AIR CONDITIONERS (MAY 1995)

452.237-75 RESTRICTIONS AGAINST DISCLOSURE (FEB 1988)

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

Description of Work: Fuels reduction/modification for hazardous fuels reduction treatment on a possible 167.5 acres, with the use of goats. Goats will be used for the purpose of removing potentially hazardous flammable fuels from the project area. The area to be grazed is within the WUI area in the Challenge Community Protection Fuels Reduction Project around Challenge, CA in Yuba County on the Feather River Ranger District, Plumas National Forest. Contract intent is to have the opportunity for the goats to graze during conducive weather conditions and time frames that are advantageous for the removal of new vegetation growth.

Background: The project area is located in Yuba County on the West Slopes of the Sierra Nevada mountain range between the elevations of 1500’ and 3500 feet, near the forested community of Challenge California. The majority of the units considered for grazing have been recently (within past 1-5 years) commercially thinned from 100% canopy cover down to 30-50% canopy cover, or have been hand thinned through post fire damaged areas of ridges and exposed areas in effort to provide a fuel break for future wildfire suppression needs. Since the thinning has taken place, the fuel breaks have had re-growth from cut stump sprouts and natural surface growth, causing the fuel breaks to be less effective. The vegetation in the units can be characterized as an upper canopy of mixed conifer and hardwood stands with a lower canopy of stump re-growth, brush/shrub component and grasses, represented vegetation is listed below.

Intent: The intent of this contract is to reduce the existing vegetation re-growth, shrubs, brush and grasses with the use of goats with targeted grazing in effort to modify the fuel loading and continuity, essentially working towards maintaining and keeping existing fuel breaks effective.

The intended contract units cover 167.5 acres, the Forest Service acknowledges that not all acres may be able to be treated due to slope, and other inaccessibility issues or concerns. These issues or concerns will be handled appropriately by the Contracting Officer and Contractor.

C.1a Represented Vegetation

Mixed conifer and hardwood California black oak (Quercus velutina) Douglas-fir (Pseudotsuga menziesii) incense-cedar (Calocedrus decurrens) ponderosa pine (Pinus ponderosa) Pacific madrone (Arbutus menziesii) tanoak (Lithocarpus densiflorus) Brush and Shrub California blackberry (Rubus ursinus) Himalayan blackberry (Rubus armeniacus) French broom (Genista monspessulana) Spanish broom (Spartium junceum) whitethorn ceanothus (Ceanothus cordulatus) buckbrush (Ceanothus cuneatus) deerbrush (Ceanothus integerrimus) white leaf manzanita (Arctostaphylos viscida) Pacific poison-oak (Toxicodendron diversilobum)

Contractor Responsibility: The Contractor shall provide everything--including, but not limited to, all equipment, supplies, transportation, labor, and supervision--necessary to complete the project, except for that which the contract clearly states is to be furnished by the Government.

C.2 Project Location & Description Location: This project is located on the Plumas National Forest, Feather River Ranger District. Treatment units are located in the Challenge Hazardous Fuels Reduction Project area around of the town of Challenge.

Township
Range
Sections
T. 19 N.
R. 7 E.
Sec. 16, 18, 20
T. 18 N.
R. 7 E.
Sec. 26

Description: All units will be available via handheld maps and digitally using avenza for use with smartphones.

Exclusions: There are small exclusion areas in and adjacent to many of the units. These areas are flagged on the ground with the following colors: archaeological = red and black, sensitive plants = blue and black, hydrology= blue and white, noxious weeds = orange.

Accessibility: Well maintained road systems provide basic access to treatment units. Maps and photos may indicate that a road goes to the unit location; however, vehicle access may be difficult or restricted. Unit locations may necessitate that the Contractor walks to the stand or acquire some other means of travel. The Government assumes no responsibility to maintain roads in a passable condition.

Any prospective contractor desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing from the Contracting Officer soon enough to allow a reply to reach all prospective contractors before the solicitation closing date. Oral explanations or instructions given before the award of a contract will not be binding.

C.3 Maps Maps showing the general vicinity and/or specific work areas are included in Section J. Maps are general in nature and are not to be considered as definitively identifying locations.

Site Visit There will be no pre-bid tour/meeting. Offerors or quotes are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

C.4 Estimated Start Date & Contract Time Start: Estimated start date is July 1, 2019 to conclude on October 31, 2021. With the intent to have the opportunity for the goats to graze during conducive weather conditions and time frames that are advantageous for the removal of new vegetation growth, i.e., different seasonal blooming periods. With the possibility of two option years.

C.5 Restrictions on Work:

Work may be performed at any time during the period of the contract, except as outlined here. Nothing in this part shall be construed to take away any of the Government's rights under the Suspension of Work Clause (52.242-14). Restrictions are as follows:

Work may be performed at any time during the period of the contract, except as outlined here. Nothing in this part shall be construed to take away any of the Government's rights under the Suspension of Work Clause (52.242-14). Restrictions are as follows:

1. In accordance with items listed under Emergencies.

2. When the Contracting Officer (or designated representative) determines that adverse weather has made access too dangerous or that continued vehicular travel would cause unacceptable road damage.

3. Designated Limited Operating Periods (LOP) See Section B Schedule of Items

4. Before goats are brought into the project area for targeted grazing, they shall be held for quarantine off-site for a minimum of 72 hours, or until such time as any seeds from invasive species not present in the project area will have passed through the intestinal tract of all animals in the herd. Contractor shall certify in writing to Contracting Officer quarantine has occurred off-site, and include quarantine location.

5. In addition to Section H, Archaeological and Historic Sites; Targeted grazing shall cease immediately upon discovery of previously-unknown cultural resources. COR shall be notified immediately and the affected area(s) shall be fenced off for avoidance until a Forest Service Archaeologist can determine relevance of the discovery.

6. Mature oak trees shall be protected from grazing activities.

7. All food and trash shall be removed from the site and properly disposed of on a regular basis.

8. All dogs used by the contractor for this contract shall have been vaccinated for rabies. A certificate showing vaccinations shall be submitted with the proposal. Contractor shall keep vaccination records or proof of current vaccination for all dogs on the project areas. Contractors’ dogs used in the operation need not be leashed but must be under contractor’s control.

9. Contractor shall immediately report to COR and all proper governmental authorities any case of infectious animal disease appearing in livestock on the premises, and shall, at the Contractor’s sole cost and expense, take all steps required to isolate, control, and eliminate such disease. Livestock exhibiting symptoms of diseases communicable to humans shall be immediately removed from the premises.

C.6 Licenses and Insurance The contractor shall obtain the insurance and licenses listed here; (see also Section L, Notices to Offerors and Respondents).

MSPA Card (Form WH510): This contract [ ] does [X] does not require the contractor to be registered with the US Department of Labor as a Farm Labor Contractor. The Contractor shall provide a current Form WH510 or legible copy.

Other: Worker’s Compensation Insurance: The Contractor shall provide evidence of Worker’s Compensation Insurance or a valid reason that exempts the Contractor from the requirement. NOTE: The Contractor working alone is not required to carry the insurance.

C.7 Camping and Housing Camping is not permitted in US Forest Service campgrounds. Contractor [X] will [] will not be permitted to camp elsewhere on US Forest Service land. Camping on Forest Service land is not a right; permission may be revoked for failure to comply with the terms of the permit. (See also Section H, Camping Permit Compliance) C.8 Technical Requirements C.8-1 Definitions The following terms are defined for this contract:

Control area- A point or area identified within the treatment unit with red & black or noxious weed flagging. Special restrictions apply.

C.O.R. - Contracting Officer's Representative.

DBH - Diameter Breast Height, the diameter of a tree as measured at a point 4 1/2 feet above ground on the uphill side of a tree.

Limited Operating Period (LOP) – Restricted operating dates due to wildlife (Spotted Owl, Goshawk) or recreation requirements.

Mobilization – The act of delivering all ordered personnel and equipment to the project area. The price for mobilization shall be included in the proposed unit prices.

Shrub- A woody plant at least 12 inches tall, distinguished from a tree by having several stems rather than a single trunk. Shrubs do not include hardwoods or conifers.

Riparian Conservation Area Buffer – A 100 to 328 horizontal foot area extending upslope on each side of a stream channel.

Streamside Management Zone (SMZ) - Riparian area protected during logging, mechanical treatments, and site preparation; contains natural debris and vegetation.

Supervisor (foreman) – A working (English-speaking) supervisor, who is knowledgeable and experienced in the required work and supervision, shall be provided for each crew and is required to stay with the crew while work is in progress. If the crew is non-English-speaking, the supervisor must be bilingual in English and the language of the crew.

C2. SPECIFICATION WORK REQUIREMENTS

Contractor agrees to supply, utilize, and care for no less than 100 goats to graze during calendar year 2019 and 2021 for the purpose of removing potentially hazardous flammable fuels from the project area.

In general, the plan of operation shall be to confine livestock within small parcels using electric fencing, or other methods approved by COR, until the agreed upon level of grazing in the parcel is completed, and then to move the grazing stock to the next parcel(s).

Contractor shall periodically inspect the area being grazed and notify the COR when grazing is completed on that parcel.

Contractor shall take care to avoid soil erosion problems caused by temporarily overstocking, such as exposing bare soil excessively and causing excessive powdering of soils. Contractor shall take care to protect trees of 4 inches or greater in diameter breast height (DBH) from bark stripping or girdling damage, by using tarps, portable fencing, or other effective means.

The goats shall be completely fenced in, except when being herded between locations, or deemed necessary to not fence in by the contractor or shepherd, and attended by a shepherd at all times. Contractor shall keep roads and trails open and accessible for public use whenever possible, but may upon notification of the COR close them temporarily for reasons of security or difficulty of fencing, or while herding goats between locations.

Desired Outcome- Within the project area, fine live herbaceous small diameter fuels will be reduced by 75% across the project area. Overall reduction of previously cut, stump sprouts and re-growth. The intent is to maintain previously thinned fire hazard fuel breaks, graze the small diameter fuels in effort to reduce their growth and maintain the effectiveness of these fuel breaks.

Work Items

Item

Unit Number

Total Unit Acres

Special concerns

Targeted Grazing Trail Unit
Trail Unit
15.4
Botany Limited Operating Period, adjacent to trial unit, July 10 – October 30. See map below.

TOTAL ACRES

15.4

Botany LOP, July 10 – October 30. Mitigations for the spread of Skeleton Weed.

C.8-2 Contractor-Furnished Equipment Unless otherwise specified herein, the Contractor shall provide all labor, transportation, supplies, livestock, and equipment necessary to perform the work as described herein.

C.8-3 Government-Furnished Property The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained in the contract.

N/A

52.242-14 Suspension of Work (Apr 1984)

(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.

(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer’s failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.

(c) A claim under this clause shall not be allowed—

(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and

(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.

AGAR 452.209 – 71 ASSURANCE REGARDING FELONY CONVICTION OR TAX DELINQUENT STATUS FOR CORPORATE APPLICANTS, ALTERNATE 1 (FEB 2012)

(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –

(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and

(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.

(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.

Notice to Proceed No work may begin on this contract until the Contracting Officer has issued a Notice to Proceed.

Pre-work Pre-work conference. Before work begins on service contracts, a pre-work conference is normally held to discuss the contract--especially the specifications, labor provisions, plan of work, and selected standard clauses. The pre-work meeting should be attended by an officer of the firm or someone designated in writing to act on behalf of the firm. The pre-work meeting may be waived at the discretion of the Contracting Officer.

Payment Payments. Payment will be made for fully acceptable work at the prices bid in the schedule of items. Payment will be made monthly or at the milestones specified below:

Deductions In accordance with the inspection clause, payment may be made for less than fully acceptable work at a reduced price.

Table 1. Pay Retention/Reduction Scale

Percent of bid price paid per unit.
Percent of transects that pass inspection
100%
≥ 90%
90%
80% to 89%
80%
70% to 79%
70%
60% to 69%
0% Non-Compliant
< 60%

RETAINAGE

The following supplements Clause 52.232-1, Payments:

The Contracting Officer may retain up to 10 percent of the invoiced amount if the contractor is behind schedule at the time the invoice is presented. “Behind schedule” means that the percentage of work completed is less than the percentage of time used.

Contract Release.

Before final payment will be made the Contractor shall sign a release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically exempted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of 1940 (31 U.S.C. 3727 and 41 U.S.C. 15).

Invoices Payment will be made from the contractor’s invoice. All invoices are to be submitted via the electronic Invoice Processing Platform (IPP). This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. There is no pre-award registration.

After award of a contract, please make sure that your company registers promptly at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. PRIOR to starting the IPP enrollment process, please verify that the point of contact’s (POC’s) email address is up to date in your company’s System for Award Management (SAM) account at www.sam.gov and that any recent update(s) have been allowed time to process resulting in an “Active” status on the SAM account. The one-time enrollment in IPP means a series of emails will be sent to the SAM POC. If you have questions on the IPP enrollment process, the help desk phone number is 1-866-973-3131.

IPP invoices are now the official payment record. Contractors must include an IPP attachment which shows the breakdown of billing based on the pricing schedule items and/or sub-items. For assistance with invoicing in IPP, the help desk phone number is 1-866-973-3131.

SECTION E--INSPECTION AND ACCEPTANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-4 Inspection of Services--Fixed-Price (AUG 1996) E.1 Sampling The standard procedure will be visual inspection of 100% of the work completed. In addition, unbiased 100 foot transects will be established as work progresses. Transects will be GPS’d and repeatable and will represent at least one percent of each unit area (about 1 transect for every 10 acres).

E.2 Specific Inspection Procedures Sample transects will be placed throughout each unit, so as to obtain a representative sample of the work. Determinations of the acceptability of the work performed will be based on these inspections, which will be considered conclusive, except as otherwise provided in this contract.

Only one item will be evaluated by transect:

1. Thinning for Hazardous Fuels; Goat Grazing All units within contract area will have been grazed through by contractor standards based on livestock capabilities.

E.3 Acceptance This is a performance based contract with disincentives for poor performance. Reductions in performance will result reductions in pay on a per Unit (bid item) basis. Payment will be based on the quality of work performed on a sliding scale (Table 1).

Table 1. Pay Retention/Reduction

Table 1. Pay Retention/Reduction Scale

Percent of transects that pass inspection
Percent of bid price paid per unit.
≥ 90%
100%
80% to 89%
90%
70% to 79%
80%
60% to 69%
70%
< 60%
0% Non-Compliant

E.4 Government Inspections Government inspections are for the purpose of satisfying the Government that the services are acceptable and do not relieve the Contractor of the responsibility for maintaining quality control. Contractors are encouraged to use the same pile inspection forms contained in this contract.

The Contracting Officer's Representative or designated inspector will conduct all inspections. Summary results will be immediately shared with the Contractor Foreman or Crew Boss in the field as work progresses.

Final Inspections. Final inspections for payment will utilize the same data collected on Inspection Forms as work progresses.

Disputed Inspection.

The Contractor may request reinspection without rework if the results are unacceptable. Reinspection must be requested in writing within 48 hours after receiving written notice of the inspection results. Reinspection will be accomplished within five working days after receipt of the contractor's written request.

Reinspection after Rework. Where rework after a failed inspection may improve the inspection results, the Contractor may rework the area and request (in writing) a second inspection. The Government will charge to the Contractor the cost of this additional inspection. Reinspection will be accomplished within five working days after the notice is received. The results of the second inspection will be final, and no further rework will be permitted.

SECTION F--DELIVERIES OR PERFORMANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984) 52.242-15 Stop-Work Order (AUG 1989) Work Timing The Contractor shall begin work within 5 days of the effective date of the Notice to Proceed.

Failure to begin work on schedule will make the contract subject to immediate termination for default.

Delays due to normal adverse weather, weekends, and holidays have been included in the calculation of contract time.

SECTION G--CONTRACT ADMINISTRATION DATA

Pre-work Pre-work conference. Before work begins on service contracts, a pre-work conference is normally held to discuss the contract--especially the specifications, labor provisions, plan of work, and selected standard clauses. The pre-work meeting should be attended by an officer of the firm or someone designated in writing to act on behalf of the firm. The pre-work meeting may be waived at the discretion of the Contracting Officer.

Notice to Proceed.

No work may begin on this contract until the Contracting Officer has issued a Notice to Proceed.

Measurement Methods of Measurement.

Acreage was measured on a horizontal plane using a Global Positioning System.

Remeasurement. Unless otherwise indicated by this contract, the contractor may request remeasurement of any quantities in Part B, when the units are acres or any linear measurement. The request must be made in writing and must be made within 10 calendar days of completing work on the unit in question. If remeasurement indicates a variance of five percent or less from the stated quantity, the Contractor shall pay for the actual cost of remeasurement and no adjustment will be made in the quantity as stated in Part B. If remeasurement indicates a variance more than five percent from the stated quantity, payment will be based on the remeasured quantity, and the Contractor will not be liable for the costs of remeasurement. All remeasurements will be done by the Government. Remeasurement of acreage will be done with two people using a hand compass and ground measurement or by means of a Global Positioning System. This clause is not applicable to quantities listed as estimated quantities.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

Wages [X] See Section J, Wage Determination

AGAR 452.237-74 Key Personnel (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel: One contractor’s representative, fluent in English, onsite every day.

(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

Emergencies Fire Plan [X] Not applicable; however, Contractors are required to comply with State law during fire season.

1. Corral fencing; if corral fencing is connected to any battery terminals, contractor will ensure that battery location is in an exposed area, free from any vegetation and on mineral soil.

Area of Responsibility for Fire. Unless otherwise noted elsewhere in the contract, the following define the limits of a contractor's area of responsibility:

· Special for this project: 25 meters around the perimeter of the unit being grazed.

Superintendence by Contractor The name and the specific authorities of the foreman or superintendent must be designated in writing to the Contracting Officer. The Contractor may use his/her own prepared letterhead stationery or a "Designation of Contractor's Representative" form available from the Contracting Officer. If the Contractor or the designee is not present when work is being performed on the contract, a Suspend Work Order may be issued with contract time continuing to run. The Contractor shall have a person on-site that is fully conversant in the English language.

Camping Permit Compliance Contractor shall comply with all terms and conditions of any camping permit issued to allow use of premises.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.