Attachment_3_-_Inspection_Form.doc
DOC document 129 KB Posted
- Attached to
- Butterfly Thinning - Plumas NF Federal contract opportunity
- Solicitation number
- 129JGP19Q0063
About this file
Attachment 3 - Inspection Form
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_6_-_Wage_Determination.pdf | ||
| 129JGP19Q0063.pdf | ||
| Attachment_4_-_Butterfly_Thinning_Map.pdf | ||
| Attachment_1_-_Pricing_Sheet.xls | XLS spreadsheet | |
| Attachment_7_-_Fire_Plan.pdf | ||
| Attachment_2_-_Response_to_Evaluation_Factors.docx | DOCX document | |
| Attachment_5_-_Butterfly_Thinning_Map_-_Control_Areas.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pile Structure Inspection Form
| Project Name: |
| Unit Number: |
| Contractor: |
| Date: |
Days passed since pile construction:
Evaluator:
| Transect # |
| Pile # |
| Pile Height |
| Compact |
| Plastic |
| Clear 3 Feet |
| Final Grade |
| P or F |
| P or F |
| P or F |
| P or F |
| P or F |
Number of passing piles
Total number of piles inspected
Percent of passing piles for this data subset
To get a passing grade piles must be all of the following:
1. Pile Height: Five feet high or higher hand piles or 10 feet high or higher grapple piles as measured mid slope.
2. Compact: Compact with smaller fuels at the bottom and larger fuels on top with no large spaces or gaps.
3. Plastic: Covered with 4 mil plastic located in the upper 1/5th of pile and coving 3/4th of the pile as viewed form the top.
4. Clear 3 Feet: Clear of all debris 3 inches in diameter and larger extending 3 feet from around the pile perimeter.
File details come from the government source that posted it.