129AC720Q0099 Bear Country Heritage Solicitation.pdf

PDF 314 KB Posted

Attached to
Heritage Survey, Bear Country Federal contract opportunity
Solicitation number
129AC720Q0099
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Heritage Survey, Bear Country, newest first.
File Type Posted
Amendment 1 129AC720Q0099 Bear Country Heritage Survery.pdf PDF
BearCountry_SurveyZone2.pdf PDF
BearCountry_SurveyOverviewMap.pdf PDF
BearCountry_RegionalMap.pdf PDF
BearCountry_ArchSitesZone2.pdf PDF
BearCountry_SurveyZone1.pdf PDF
BearCountry_ArchSitesZone1.pdf PDF
WD 2015-5677 061320.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

9AC7

REDDING CA 96002

3644 AVTECH PARKWAY SUITE 180

R5 NO-CAL ACQ SERVICE AREA NCASA

USDA FOREST SERVICE

129AC7 CODE 16. ADMINISTERED BYCODE

X

X

X

541620

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED OR9AC7

RFPIFB

10. THIS ACQUISITION ISCODE

RFQ

14. METHOD OF SOLICITATION

13b. RATING

NAICS:

SMALL BUSINESS

08/07/2020 1300 PT

07/23/2020

530-226-2447REBECCA WILCOX

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

129AC720Q0099

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 42 1003464OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

REDDING CA 96002

3644 AVTECH PARKWAY

NORTHERN CA ACQUISITION SERVICE ARE

REBECA WILCOX

15. DELIVER TO

REDDING CA 96002

3644 AVTECH PARKWAY SUITE 180

R5 NO-CAL ACQ SERVICE AREA NCASA

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$16.50

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS

THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

8(A)

USDA FOREST SERVICE

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

HERITAGE SURVEYS BEAR COUNTRY

Klamath National Forest

DUNS_______________________________

EMAIL______________________________

Delivery: 10/01/2020

Continued ...

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

X

XX

DATED

REBECCA WILCOX

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

OFFER

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT:

REF.

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 2/2012) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

0001 KNF - Bear Country Heritage Section 106 Surveys

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42 2 of

0 - SF1449

1 - SCHEDULE OF ITEMS

Bear Country Hertiage Project

2 - CONTRACT CLAUSES

CONTRACT CLAUSES

3 - Contract Documents, Exhibits or Attachments

1. DESCRIPTION OF WORK:

2. SCOPE:

3. PERIOD OF PERFORMANCE

4. PROJECT LOCATIONS AND ACCESSIBILITY:

5. DESCRIPTION OF THE PROJECT AREA AND ACCESSIBILITY:

6. EXISTING INFORMATION:

7. OTHER APPLICABLE DOCUMENTS:

8. SPECIAL REQUIREMENTS

9. PRE-SURVEY

10. FIELD SURVEYS

11. DELIVERABLES

12. QUALITY REQUIREMENTS

13. CONTRACTOR FURNISHED CRITICAL ITEMS /SERVICES

14. LIST OF ATTACHMENTS

4 - PROVISONS

Solicitation Provisions

5 - EVALUATION AND AWARD

Factor 3. Price

0 - SF1449

1 - SCHEDULE OF ITEMS

Bear Country Hertiage Project

Item No.

Description Quantity Order

Unit

Price

Amount

BEAR COUNTRY PROJECT Estimated

Pre-survey Activities

a. Work Plan Approved As Specified Task $___________ $____________

Field Surveys Survey

b. Complete Inventory- Primary Acreage 786 Acre $___________ $____________

Record Sites

c. New prehistoric sites 8 Sites $___________ $____________

d. New historic sites 8 Sites $___________ $____________

e. New historic linear sites 4 Sites $___________ $____________

f. Update existing site records 15 Sites $___________ $____________

Reports

g. Final Report including Final Site Records and

GIS shape files 1 Report $___________ $____________

TOTAL PRICE: $____________

Item No.

Description Quantity Order

Price

Amount

BEAR COUNTRY PROJECT

(Additional Acreage)

Estimated

Pre-survey Activities

a. Work Plan Approved As Specified Task $__________ $____________

Field Surveys Survey

b. Complete Inventory ¿ Additional Acreage 234 Acre $__________ $____________

Record Sites (Primary Record Only)

c. New prehistoric sites 2 Sites $__________ $____________

d. New historic sites 2 Sites $__________ $____________

e. New historic linear sites 1 Sites $__________ $____________

Reports

f. Final Report including Final Site Records and GIS shape files 1 Report $__________ $____________

TOTAL PRICE: $_________

TOTAL PRICE BOTH ITEMS: $_________

2 - CONTRACT CLAUSES

CONTRACT CLAUSES

52.204-13 System for Award Management Maintenance. (OCT 2018)

52.204-18 Commercial and Government Entity Code Maintenance. (JUL 2016)

52.204-21 Basic Safeguarding of Covered Contractor Information Systems. (JUN 2016)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013)

52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders - Commercial Items. (JUN 2020)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115- 232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

[ ] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (OCT 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

[ ] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509).

[ ] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

[ ] (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).

(5) (Reserved)

[ ] (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111- 117, section 743 of Div. C).

[ ] (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

[ ] (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020) (31 U.S.C.

6101 note).

[ ] (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).

[ ] (10) (Reserved)

[ ] (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole Source Award (MAR 2020) (15 U.S.C. 657a).

[ ] (ii) Alternate I (MAR 2020) of 52.219-3.

[ ] (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (MAR 2020) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

[ ] (ii) Alternate I (MAR 2020) of 52.219-4.

[ ] (13) (Reserved)

[ ] (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (MAR 2020) (15 U.S.C.

644).

[ ] (ii) Alternate I (MAR 2020).

[ ] (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (MAR 2020) (15 U.S.C.

644).

[ ] (ii) Alternate I (MAR 2020) of 52.219-7.

[ ] (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C.

637(d)(2) and (3)).

[ ] (17)(i) 52.219-9, Small Business Subcontracting Plan (JUN 2020) (15 U.S.C.

637(d)(4)).

[ ] (ii) Alternate I (NOV 2016) of 52.219-9.

[ ] (iii) Alternate II (NOV 2016) of 52.219-9.

[ ] (iv) Alternate III (JUN 2020) of 52.219-9.

[ ] (v) Alternate IV (JUN 2020) of 52.219-9.

[ ] (18) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

[ ] (19) 52.219-14, Limitations on Subcontracting (MAR 2020) (15 U.S.C. 637(a)(14)).

[ ] (20) 52.219-16, Liquidated Damages-Subcontracting Plan (JAN 1999) (15 U.S.C.

637(d)(4)(F)(i)).

[ ] (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (MAR 2020) (15 U.S.C. 657f).

[ ] (22)(i) 52.219-28, Post-Award Small Business Program Rerepresentation (MAR 2020) (15 U.S.C. 632(a)(2)).

[ ] (ii) Alternate I (MAR 2020) of 52.219-28.

[ ] (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (MAR 2020) (15 U.S.C. 637(m)).

[ ] (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (MAR 2020) (15 U.S.C. 637(m)).

[ ] (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

[ ] (26) 52.219-33, Nonmanufacturer Rule (MAR 2020) (15 U.S.C. 637(a)(17)).

[ ] (27) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

[ ] (28) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (JAN 2020) (E.O. 13126).

[ ] (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

[ ] (30)(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).

[ ] (ii) Alternate I (FEB 1999) of 52.222-26.

[ ] (31)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

[ ] (ii) Alternate I (JUL 2014) of 52.222-35.

[ ] (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

[ ] (ii) Alternate I (JUL 2014) of 52.222-36.

[ ] (33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

[ ] (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

[ ] (35)(i) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).

[ ] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O.

13627).

[ ] (36) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

[ ] (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA- Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ] (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).

[ ] (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).

[ ] (40)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

[ ] (ii) Alternate I (OCT 2015) of 52.223-13.

[ ] (41)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

(ii) Alternate I (JUN 2014) of 52.223-14.

[ ] (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).

[ ] (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

[ ] (ii) Alternate I (JUN 2014) of 52.223-16.

[ ] (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O. 13513).

[ ] (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

[ ] (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).

[ ] (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

[ ] (ii) Alternate I (JAN 2017) of 52.224-3.

[ ] (48) 52.225-1, Buy American-Supplies (MAY 2014) (41 U.S.C. chapter 83).

[ ] (49)(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (MAY 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

[ ] (ii) Alternate I (MAY 2014) of 52.225-3.

[ ] (iii) Alternate II (MAY 2014) of 52.225-3.

[ ] (iv) Alternate III (MAY 2014) of 52.225-3.

[ ] (50) 52.225-5, Trade Agreements (OCT 2019) (19 U.S.C. 2501, et seq., 19 U.S.C.

3301 note).

[ ] (51) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

[ ] (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

[ ] (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150).

[ ] (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area

(NOV 2007) (42 U.S.C. 5150).

[ ] (55) 52.229-12, Tax on Certain Foreign Procurements (JUN 2020).

[ ] (56) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

[ ] (57) 52.232-30, Installment Payments for Commercial Items (JAN 2017) (41 U.S.C.

4505, 10 U.S.C. 2307(f)).

[ ] (58) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (OCT 2018) (31 U.S.C. 3332).

[ ] (59) 52.232-34, Payment by Electronic Funds Transfer - Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).

[ ] (60) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

[ ] (61) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).

[ ] (62) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C.

637(d)(13)).

[ ] (63)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

[ ] (ii) Alternate I (APR 2003) of 52.247-64.

[ ] (iii) Alternate II (FEB 2006) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

[ ] (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).

[ ] (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[ ] (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[ ] (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

[ ] (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (MAY 2014) (41 U.S.C. chapter 67).

[ ] (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).

[ ] (7) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015).

[ ] (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O.

13706).

[ ] (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records - Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) of this paragraph in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).

(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(v) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C.

637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(vi) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(vii) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).

(viii) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

(x) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xii) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C.

chapter 67).

(xiii) [ ] (A) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).

[ ] (B) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (MAY 2014) (41 U.S.C. chapter 67).

(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).

(xvi) 52.222-54, Employment Eligibility Verification (OCT 2015) (E. O.

12989).

(xvii) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015).

(xviii) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

(xix)(A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

(B) Alternate I (JAN 2017) of 52.224-3.

(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor May include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of clause)

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): [Insert one or more Internet addresses]

(End of clause)

3 - Contract Documents, Exhibits or Attachments

Section IV

1. DESCRIPTION OF WORK:

Heritage survey areas include units for timber harvesting, thinning and fuels reduction on the Klamath National Forest. The Bear Country project on the west side of the Klamath National Forest proposes to treat designated units via timber harvesting, thinning and fuels reduction. Heritage surveys are needed for a portion of the project area (6,000 acres) and will include site recordation for any newly identified archaeological sites. The project area habitat is mixed conifer forest on steep slopes with numerous drainages; elevation ranges from approximately 1,200' to 6,100'.

2. SCOPE:

The contractor shall conduct a heritage resource inventory within "Survey Needs" polygons for identified Project Area(s). The Contractor shall record all new prehistoric and historical resources located within the "Survey Needs" polygons within the project area. The contractor shall visit previously recorded sites and update existing site records.

The "Bear Country Project" survey is to be conducted in compliance with Forest Service policy, which requires a heritage resource inventory prior to any undertaking that may affect heritage resources (see FOREST SERVICE MANUAL 2361) pursuant to Section 106 of the National Historic Preservation Act of 1966 as amended (16 U.S.C. 470) and procedures of the Advisory Council of Historic Preservation (36

CFR 800).

The survey shall provide site-specific data sufficient for the Forest Service to locate and identify cultural resources in the project area(s). The Contractor shall furnish all necessary personnel, facilities, equipment, materials, and transportation to perform the work described herein. The contractors qualified archaeologist with at least five years crew lead experience, identified in the proposal, shall personally supervise all phases of the contract, including field investigations.

3. PERIOD OF PERFORMANCE

The period of performance of this project is from Date of Award to November 30, 2020.

The desired date for completion of the task is as listed below. Contractor shall propose a work schedule to meet contract time and any deviations from these dates will be defined at task order award.

Survey Completion date: October 15, 2020.

Submission of Final Report and GIS data: November 30, 2020.

4. PROJECT LOCATIONS AND ACCESSIBILITY:

LOCATION: The Project Area is located on the west side of the Klamath National Forest (KNF) in Siskiyou County, CA. See the Vicinity Maps and Project Maps attached as Exhibits. Surveys shall not be conducted on private land. See Schedule and Project Maps for total acres requiring complete heritage resource inventory and USGS topographic locations.

5. DESCRIPTION OF THE PROJECT AREA AND ACCESSIBILITY:

The project area habitat is mixed conifer forest, with areas of mining activity, meadows, open rocky areas, rock outcrops, riparian zones, and steep canyons. Elevation of the project area ranges from approximately 1,200 to 6,100 above sea level.

Bear County project areas highest elevation can usually be accessed until mid-November and may be under snow until mid-May.

Access shall be by 2WD, 4WD, or by foot, as determined by the Pre-survey Reconnaissance. The Government will not plow roads. A road that is gated or has a berm closure shall not be accessed by motorized vehicles.

6. EXISTING INFORMATION:

In consultation and agreement with the California State Historic Preservation Office (SHPO), higher sensitivity areas on the east side of the Forest are typically found in areas of 0-30% slope. These areas include prehistoric and historic archaeological resources. Survey efforts shall concentrate only on those areas as outlined in Section VII, Field Surveys. Existing site records and ethnographic and historic literature are on file at the KNF, Supervisors Office, Yreka and the Salmon Scott Ranger District Office, Ft.

Jones, and may be examined and/or copied by the Contractor. A Geographic Information System (GIS) layer depicting previous survey coverage and site locations will be provided as well as a project map displaying this information.

7. OTHER APPLICABLE DOCUMENTS:

Archaeological Recordation Forms as specified in: Format approved by the California State Historic Preservation Office (DPR-523) shall be completed for all newly recorded sites. All previously recorded sites not recorded on these forms shall be re-recorded and updated to these forms. The form is available at http://ohp.parks.ca.gov/c .

Secretary of Interior's "Standards & Guidelines for Archaeology and Historic Preservation: Reporting Identification Results", See: http://ohp.parks.ca.gov/ "Archaeology and Historic Preservation: Secretary of the Interior's Standards and Guidelines/amended and annotated-Standards and Guidelines for Identification.

Secretary of Interiors Standards and Guidelines (48 FR 44738-44739) or OPM standards for Professional Qualifications. Available at www.nps.gov/history/local-law/arch_stnds_9.htm.

8. SPECIAL REQUIREMENTS

DEFINITIONS

Diagnostic - Prehistoric: Time sensitive or functionally specific artifacts associated with prehistoric era (CA Pre 1850) human activity. These would include formed artifacts such as flake stone tools, projectile points, or ground stone artifacts (bowl mortars, pestles, metates, etc.)

Diagnostic - Historic: Time-sensitive or functionally specific artifacts associated with historic era (generally post 1850) human activity. This may include embossed or otherwise labeled bottles or tins, bottles with pontil marks or other time sensitive attributes, ceramics with maker's marks or other distinctive attributes, and/or artifacts associated with specific ethnic groups (Chinese, Basque, etc.).

Feature: Any humanly modified component of a site.

Historic Sites: Historic-era artifacts occurring in sufficient quantity or complexity, and/or groupings of artifacts and historic features that are in excess of 50 years old shall be documented as a site. If there are questions as to whether to record historic debris as a site, consult with the Contract Officers Representative (COR). The following heritage resources shall be documented as Historic Sites:

Water Ditches - record as linear sites.

Linear sites associated with nonlinear sites, record as two separate sites. Indicate association on site record form Mining tailings - can be recorded as isolated features. However, tailings need to be surveyed for potentially associated cultural mining features including historic debris, camps, shafts, etc. If any features are found to be directly associated, then the tailings should be recorded as a feature or loci of a larger historic mining site.

http://ohp.parks.ca.gov/c http://ohp.parks.ca.gov/ http://www.nps.gov/history/local-law/arch_stnds_9.htm

Prospect pits - all prospect pits (glory holes, coyote holes, etc.) will be recorded as isolated features, unless they are located within a larger mining site boundary.

Hydraulic pits - recorded as sites.

Logging chutes - Logging chutes having structural components shall be recorded as a linear site.

Logging chutes or old skids lacking structural components shall be recorded as a historic isolate.

Standing or collapsed structures over 50 years old - will be recorded as sites.

Railroad grades and/or historic trails or roads - will be recorded as linear sites.

Historic debris - if 50 years old with diagnostic components, record as a site. Record as a site if it is associated with any other features.

Historic can scatters - 25 total cans with some complexity (i.e. glass and cans, multiple types of cans) or 35 total cans.

Graves - will be recorded as sites.

Historic dams/reservoirs - record as a site if 50 years old.

Historic debris - if 50 years old with diagnostic components, document as a site. Document as a site if it is associated with any other features.

Historic can scatters - 25 total cans with some complexity (i.e. glass and cans, multiple types of cans) or 35 total cans.

Standing or collapsed structures over 50 years old - will be documented as sites.

Railroad grades and/or historic trails or roads - will be documented as linear sites.

Linear sites associated with nonlinear sites, document as two separate sites.

Inventory: The systematic examination of a given land area (polygon) for the purpose of identifying and documenting archaeological sites and isolates. This includes, but may not be limited to, a literature review, archival research, pre-field research, survey design, field survey implementation, Global Positioning System (GPS) data collections, flagging site locations, report preparation, etc.

Isolates - Historic: locations which consist of a limited quantity, or singular historic artifacts that clearly are not associated with any other features or loci older than 50 years, shall be recorded as isolates.

Isolates - Prehistoric: locations with lithic artifacts which consist of less than 5 flakes and 1 formed tool within a 25 square meter area.

Loci: a center for cultural activity - typically separated from other parts of the site by space devoid of cultural materials.

Multi-Component Site: A site that contains both historic and prehistoric artifacts and features as defined above. A historic site that contains a single prehistoric artifact will not be considered multi-component. A prehistoric site, with a light occurrence of a historic refuse (i.e. five or six sanitary cans) will, likewise, not be considered a multi-component site. If there are questions as to where to record a site with multiple components consult with the COR.

Prehistoric Site: Prehistoric era artifacts occurring in sufficient quantity or complexity shall be formally recorded as a site. At a minimum: five unmodified lithic flakes and a tool (projectile points, biface, groundstone, etc.) within a 25 square meter area shall be defined as a site. All bedrock mortars will be recorded as isolates unless they are part of a site.

QC: Quality Control.

QCP: Quality Control Plan.

Qualified Principle Investigator: will meet the Secretary of Interiors Standards and Guidelines (48 FR 44738-44739) or OPM standards for Professional Qualifications including a graduate degree in archaeology or related fields.

Qualified Archaeologist: will meet the OPM standards for professional archaeologist and have two years of experience equivalent to a GS-9. Standards include a degree in archaeology or related field; six semester hours of related coursework (geology, history, scientific writing, etc.) and archaeological field school.

Professional archaeologists may work independently with oversight and certification by the Principle Investigator, and function as crew chief directly supervising personnel who do not meet these qualifications.

Qualified Survey Crew Member: will have a minimum of 12 months of specialized experience and/or 4-year course of study above high school leading to a bachelors degree with courses related to archaeology.

Specialized experience is defined as experience that equipped the applicant with the particular knowledge, skills, and abilities to perform successfully the duties of this position. Education must be from an accredited technical school, college or university. Education may be substituted for specialized experience. Only education in excess of the first 60 semester hours of a course of study leading to a bachelor's degree may be credited toward meeting the specialized experience requirement. Survey crew members may, under the immediate, in-field supervision of a Qualified Archaeologist assist in survey, site recordation, photography, and site mapping. They may not perform any activities related to cultural resource work alone or unsupervised.

All surveyors shall: 1) be 18 years of age, 2) have the ability to recognize artifacts and features, 3) have the ability to walk over unit areas in search of cultural sites and isolates using a compass, topographical map and aerial photos, 4) have the ability to prepare site forms and collect relevant site information and, 5) have the ability to use GPS units, aerial photos, maps, compass, and be able to follow survey protocol.

Session: The time spent in the field gathering data. Sessions, up to ten continuous days, shall be set by the Contractor. Sessions shall be discussed in the Survey Plan.

9. PRE-SURVEY

1. Literature Review: The Contractor shall conduct a pre-field literature review including, but not limited to: applicable documents, District archaeological site atlas and site records, historic maps, General Land Office (GLO) plat maps, historic literature, and FS archaeological reports for the project area and adjoining areas. The Contractor shall also consult with local historical societies, archives, courthouses, museums, and the keeper of county records. Knowledge gained from the Literature Review shall be cited in the survey plan.

Standard: If important information that should have been gleaned from the Literature Review is missing from the Survey Plan, the contractor shall redo the Literature Review.

2. Pre-survey Reconnaissance: Prior to the start of field surveys the contractors shall conduct a field reconnaissance of the survey area to become familiarized with the Project Area. Impassable roads, locked gates, downed trees, etc., shall be noted.

Standard: The Pre-Survey reconnaissance shall use information reviewed during the Literature Review to aid in a field review of the significant terrain features, access, and heritage resource sensitivity. Strategies for locked gates and downed trees blocking roads shall be discussed with the COR prior to conducting the Pre-survey reconnaissance. Knowledge gained from the Pre-survey Reconnaissance shall be incorporated into the Survey Plan.

3. Survey Planning: The Contractor shall consider the information gathered during the Literature Review and Pre-survey Reconnaissance and discuss any issues that surfaced with the COR. After discussions the Contractor's Solicitation Proposal shall be updated with the survey strategy and renamed the Survey Plan.

Standard: The contractor's survey planning and strategy shall reflect the discussions with the Government about Project issues.

4. Quality Control Planning: The Contractor shall plan Quality Control Activities to ensure that the survey and deliverables meet the Governments Quality Standards. The Quality Control Activities shall be documented in the Solicitation Proposal and titled as the Quality Control Plan. After award the Quality

Control Plan (QCP) becomes a part of the Survey Plan and the Contractor's QC activities are specified by the QCP. A QCP that does not catch errors shall be redesigned.

Standard: The Contractor's Quality Control Activities shall test all activities against:

a. The Government's Quality Assurance Surveillance Plan: See X. GOVERNMENT'S QUALITY

ASSURANCE SURVEILANCE PLAN.

b. This Work Statement: See I. INTRODUCTIONS thru X. QUALITY ASSURANCE

SURVEILANCE PLAN.

10. FIELD SURVEYS.

Survey

Following Government approval of the Survey Plan, the contractor shall conduct a thorough heritage resource survey within the Survey Needs Area boundary. A thorough survey includes a systematic pedestrian examination, to the Inventory Survey Coverage specified on the Project Map, of the surface of the Project Survey area. Beyond the exposure of the ground surface for assistance in ground visibility, no subsurface excavation is authorized. The Contractor shall employ the following survey intensities and standards:

1. Sub item b - Complete Survey Coverage: This type of coverage shall be sufficient to allow the investigators to encounter the smallest of archaeological sites likely to occur in an area, based on pre-field research. Traverses or transects between members of the survey crew shall be a maximum of 0-30 meters apart, depending upon the ground visibility and slope.

2. Non-surveyable Inventory: These acres are considered by the Government to be too steep, brushy (or otherwise unsafe), or of exceedingly low sensitivity for heritage resources, and are therefore excluded from physical examination. All areas designated as surveyable on the Government provided map shall be surveyed at the "Complete Survey Coverage" level unless a different level of coverage is mutually agreed upon prior to fieldwork. The Contractor may not designate any areas as "non-surveyable" without approval of the Government. There will be no compensation for "non-surveyable" acres. Non-linear sites that straddle the Boundary: All non-linear sites that straddle or are directly adjacent to "Survey Needs" polygon boundaries shall be treated as if they fall entirely within the "Survey Needs" polygons. If nonlinear sites exceed the quantity on the Task Order Form then GPS coordinates shall be taken as a point feature and reported in the next Session Report.

3. Linear sites that straddle the Boundary: All linear sites that straddle the "Survey Needs" polygon boundaries shall be recorded and flagged and tagged 50 meters outside of the "Survey Needs" polygon boundary. Each segment of linear sites that exceeds the quantity on the Task Order Form shall have GPS coordinates recorded as a point and reported in the next Session Report.

Standard: The Contractor shall record all coverage changes on a 7.5 Minute USGS Quadrangle Map after discussing them with the Government. The changes on this map shall be digitized and included in the final GIS coverage layer. This acreage will be computed for final payment. A copy of this map and a discussion of rationale behind the change of Survey coverage shall be included with the next Session Report after approval of the survey coverage changes. Final payment will be made on actual survey coverage applied in the field as based on the contractors digitization, as approved by the Government. Non-surveyed areas shall be digitized as non-surveyable.

Record Sites

Sub items c, d, e, f and g. Record New Prehistoric and Historic Sites: The Contractor shall record all newly discovered: prehistoric and historical heritage resources within the survey polygons. A GPS device shall be used to record the location of all site boundaries and datum - See Datum section. All sites and isolates shall be digitally photographed. Representative photos of sites shall include at least two overview shots (looking across the site in a cardinal direction), and photos of artifact concentrations and/or features.

Paper copies of the photos shall be included with the DPR forms, and JPEGs will be supplied to the

Government electronically.

Standard:

Procedures: All recording shall conform to the Applicable Documents. If there is any professional disagreement during the term of this contract as to the age, condition, significance, previous use, status, size, or connectivity of a site or artifact, the Governments determination is final.

Isolates: Isolates shall be recorded via GPS to include a brief description (isolate number, era (P/H/M), count, type of artifact) in a data dictionary. Diagnostic projectile points will be photographed; JPEGs with associated coordinates will be supplied to the Government electronically.

Non-Linear Site Boundaries, Flagging: Site boundaries are defined as five meters out from the nearest historic or prehistoric artifact/feature. The contractor shall flag all site boundaries with orange and white striped flagging at a height of at least 5 feet if physically possible. A minimum of three flags shall be visible from any point outside of the site boundary looking in. The Contractor shall include all site loci within one site boundary as appropriate. If the site loci and/or features are separated by 200 meters or more;

record and flag these as separate sites and report in the next Session Report.

Linear Site Boundaries, Flagging: Site boundaries are defined as five meters out from the last artifact or feature. The contractor shall flag all site boundaries on the outside boundary with orange and white striped flagging at a height of at least 5 feet if physically possible. A minimum of four flags should be visible from any point outside of the site boundary. Linear features associated with an existing site that have not been recorded shall be recorded as a new site. Features associated with linear sites, such as, but not limited to wooden structures, artifact concentrations, and historic refuse, shall be recorded as a separate site. Linear sites shall be recorded by GPS coordinates as a "line feature" down the center, and be recorded as a separate site. Each site record shall mention any associated sites.

Datum: A site datum shall be established and recorded by GPS coordinates as a point feature. This data shall be entered on the Primary Record P2.d. UTMs.

Numbering: The Forest will provide a block of site numbers to the contractor at the pre-work meeting.

Forms: Draft forms shall be complete and legible. All site boundaries shall be recorded in meters. Site location maps shall include GPS coordinates of site boundary, FS site number, identification of site location with a FS site number, project name, ASR number, quad map name and year of revision, scale of map, and North arrow. Historic features are recorded in English rule, except for measurement from Datum to feature and/or artifacts, which shall be recorded in meters. All heritage resource site records shall be recorded using the format approved by the California State Historic Preservation Office (DPR-523) and the Klamath National Forest artifact recording, collection and task order procedures. Required photos shall be submitted as prints and .jpeg images. The contractor shall include the project name, ASR number, quad map name and year of revision, scale of map, and North arrow on all project maps. The Archaeological Site Record, the Linear Site Record, and the Artifact Record, shall be filled out as appropriate. The Archaeological Survey Report (ASR) number will be provided to the contractor at the pre-work meeting.

Documentation: Draft documentation shall be complete and legible. The contractor shall include the project name, ASR number, quad map name and year of revision, scale of map, and North arrow on all project maps. The Archaeological Survey Report (ASR) number will be provided to the contractor at the pre-work meeting.

GPS Requirements. A Resource Grade (preferably Trimble, no recreational GPS allowed) Global Positioning (GPS) system shall be used to record the location of site and isolates. The contractor shall furnish:

a. The uncorrected GPS files.

b. The Base Files used to make corrections.

c. Corrected GPS files.

d. GPS files exported as an ARC GIS shape file.

Artifacts within sites less than one acre may be recorded by GPS at the contractors discretion. A representative example of formed tools or archaeological features should be recorded by GPS at sites larger than one acre. All sites shall have their boundaries recorded as an area feature, and linear sites shall be recorded as a linear feature down the middle.

All GPS locations shall be to within plus or minus 3 meters horizontal distance at 68% probability of their actual location. The mapped locations shall be recorded in NAD 83, CONUS, UTM Zone 10, and meters.

Suggested receiver settings include 3D Mode, a PDOP of 8, SNR of 6, and Elevations Mask of 15 degrees.

The Contractor shall include data verifying the accuracy of the mapped locations in relationship to the actual location. The Contractor shall submit the verification to the Government in the form of survey notes, and GPS files with META data. The mapped locations shall be converted to ArcGIS shapefiles before they are submitted to the Government. Where GPS verification cannot be obtained directly for a location, the contractor shall obtain indirect GPS verification by measuring the azimuth and horizontal distance of the mapped location from a GPS verified reference point. GPS points shall be attributed in a data dictionary.

11. DELIVERABLES

Pre-survey Deliverables

1.Sub item a. Survey Plan: The Contractor shall incorporate the information gathered from the Literature Review and Pre-survey Reconnaissance into the Solicitation Proposal, and rename it the Survey Plan. The Survey Plan shall include the: who, what, when, and where about the Contractor's Survey. The Survey Plan shall be submitted for Government review at least ten business days before the planned start of the survey.

The Survey Plan shall be approved prior to the start of the survey. During the contract the Contractor shall maintain all portions of the Plan up to date and all changes shall be submitted with Session Reports and approved by the Government, before adoption.

Standard: At a minimum the Survey Plan contains the:

a. Schedule: Contractor's work schedule including field session dates and the dates the session reports are to be submitted, and other work commitments.

b. Work Progression: The approximate order the project will be surveyed.

c. Organization: A discussion of crew organization and the introduction of new surveyors that not included in the solicitation proposal.

d. Equipment: A discussion of the transportation and other equipment. Discuss the GPS equipment including make and model of GPS and settings that differ from the Government recommendations.

e. Safety: Discussion of emergency measures and communications between office and field.

f. QCP: Quality Control Plan and Forms (see below).

g. Survey map: The Survey map (1:24,000) with contours.

The Contractor shall submit updates to the Survey Plan with each Session Report.

2. Quality Control Plan: The Contractor shall include their Quality Control Plan as a part of the Survey Plan. During the term of the contract the Quality Control Plan shall be modified as needed to insure that the Contractors self-inspection identifies errors and discusses how they are to be corrected. A summation of the weeks Quality Control Activities shall be submitted with the Session reports.

Standard: The Contractors QCP shall make meaningful and significant improvements to the quality of the Contactors tasks and subtasks, as specified in the Schedule of Items. The contractor shall inspect fieldwork and all deliverables including all documentation and maps. The Contractors QCP should specify what field or office task is being inspected, who performs the inspections, how many or what percentage of the task is being inspected, how often, and to what standard they are being inspected.