A-10 129AC720Q0030.pdf
PDF 373 KB Posted
- Attached to
- Mad River Mobile Home Roof Replacements Federal contract opportunity
- Solicitation number
- 129AC720Q0030
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A-10 Project Specifications.pdf | ||
| A-10 Site Photos.pdf | ||
| A-10 PAL Fire Plan.pdf | ||
| A-10 WD CA20200030, Mod 0, dated 01.03.2020.pdf | ||
| A-10 Location Maps.pdf | ||
| A-10 Roof Detail.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
129AC720Q0030
00 01 10 Table of Contents
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 - List of Attachments / Drawings 00 10 00 - Solicitation 00 21 13 - Instructions to Bidders 00 45 00 - Representations and Certifications 00 72 00 - General Conditions 00 73 00 – Supplementary Conditions
DIVISION 01 – GENERAL REQUIREMENTS
01 10 00 – Summary of Work 01 30 00 – Shop Drawings and Submittals 01 56 00 – Site and Area Cleanup 01 90 00 – Mobilization
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 57 00 – Mobile Home Roof System
SECTION 00 01 15 - List of Attachments / Drawings Attachment
Number Title Date Number of Pages
1 A-10 Location Maps 11/09/2017 2 2 A-10 Project Specifications 01/22/2020 12 3 A-10 Roof Detail 11/01/2017 1 4 A-10 Site Photos 10/27/2017 10 5 A-10 PAL Fire Plan 01/22/2020 9 6 A-10 Wage Determination CA20200030 01/03/2020 5
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
990790
USDA FOREST SERVICE
R5 NO-CAL ACQ SERVICE AREA NCASA
3644 AVTECH PARKWAY SUITE 180
REDDING CA 96002
9AC7
Quotes must be submitted electronically to tracy.marino@usda.gov. See Instructions for Sumbission of Quotes on Page 5
TRACY MARINO 530-252-6410
102/10/2020
129AC720Q0030
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Repair of Mad River Mobile Home Roofs
Mad River Ranger District
Six Rivers National Forest
Federal Acquisition (FAR)
Agriculture Acquisition Regulation (AGAR)
Project Specifications
Roof Detail
PAL Fire Plan
General Wage Decision CA20200030
NAICS: 238160
Size Standard: $15.0M
Set Aside: 100% Total Small Business
Magnitude of construction: between $25,000.00 and $100,000.00
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 60 calendar days and complete it within ________________ ________________ calendar days after receiving
52.211-10
03/03/2020
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA FOREST SERVICE
R5 NO-CAL ACQ SERVICE AREA NCASA
2550 RIVERSIDE DRIVE RM 174
SUSANVILLE CA 96130
9AC7
TRACY L. MARINO
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 29
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
129AC720Q0030
Delivery Location Code: 9A47
SIX RIVERS NATIONAL FOREST
1330 BAYSHORE WAY
EUREKA CA 95501 US
0001 Mobilization 1 LS $________________
0002 Single Wide Mobile Home at Trailer Pad #6 1 LS $________________
0003 Double Wide Mobile Home at Trailer Pad #9 1 LS $________________
0004 Single Wide Mobile Home at Trailer Pad #10 1 LS $________________
0005 Single Wide Mobile Home at Trailer Pad #12 1 LS $________________
0006 Single Wide Mobile Home at Trailer Pad #13 1 LS $________________
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SECTION 00 10 00 - Solicitation
NOTE: If quote is over $35,000.00, payment bond or ILC will be required for 100% of the award price and be submitted within 10 days after contract award. See Section 00 72 00 for additional information.
1. SCOPE OF WORK
The Contractor shall furnish all labor, supervision, equipment, transportation and materials for the installation of new roof systems on five mobile homes on the Mad River Compound. The work shall include the removal and replacement of specified items and the installation of a new insulated and water tight roof system. The Contractor shall verify all existing conditions prior to the beginning of work.
2. BUILDING INFORMATION
1. Single Wide Mobile Home at Trailer Pad #6. Mobile home is 12' x 50'.
2. Double Wide Mobile Home at Trailer Pad #9. Mobile home is 24' x 57'.
3. Single Wide Mobile Home at Trailer Pad #10. Mobile home is 12' x 66'.
4. Single Wide Mobile Home at Trailer Pad #12. Mobile home is 12' x 66'.
5. Single Wide Mobile Home at Trailer Pad #13. Mobile home is 12' x 66'.
3. PROJECT LOCATION AND ACCESS
The project is located at Mad River Compound in Mad River, California. The Mad River Compound is located on the Mad River Ranger District, Six Rivers National Forest.
Directions to Mad River: From Eureka travel south approximately 20 miles on Highway 101 to Highway 36; from Highway 36 travel east approximately 50 miles to Mad River. The Mad River Compound is located on the north side of Highway 36 (see compound map).
4. CONTRACT TIME
Start time is anticipated to being as soon as possible after award, with all items of work completed within 60 calendar days.
5. CONTRACTOR LICENSE REQUIREMENTS
Installer shall be licensed in the State of California as a General Building Contractor and shall as defined by Business & Professions Code Division 3, Chapter 9. Contractors, Article 4. Classifications.
SECTION 00 21 13 - Instructions to Bidders
This solicitation is a Request for Quote (RFQ) for repair of Mad River mobile home roofs.
Site visit (see FAR 52.236-27, Page 12)
Quote incorporates all amendments and Q&A's (if any) that have been posted to beta.sam.gov. Submit quotes by the date and time stated in Block 13a or as amended.
Inquiries
Any prospective quoter desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing, not later than 5 calendar before the closing date, to allow a reply to reach all prospective quoters before submission of their quotes. Oral explanations or instructions given before the award of a contract will not be binding. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Requests for explanation or interpretation of the solicitation, drawings, specifications, etc. may be submitted by email to Tracy Marino at tracy.marino@usda.gov.
Instructions for Submission of Quotes
(a) Submit signed and dated quotes to the office specified in this solicitation at or before the exact time specified in this solicitation. Quotes should be submitted via the OF 336 CONTINUATION SHEET plus Technical Response documents of the Quoter's design as specified in the solicitation. Quotes shall be submitted in two parts (technical and price). Each part shall be separate and complete in itself so that evaluation of one may be accomplished independently of the other.. As a minimum, quoters must show:
(1) Pricing and Contact Information (use SF 1442 and OF 336). This should be considered as your price submission)
(2) Acknowledgment of any Solicitation Amendments (use SF 1442);
(3) Response to non-price evaluation factors (see Section 00 21 13, Evaluation Criteria).
(4) All applicable fill-in provisions. For solicitations issued on an SF 1442, this would include Section 00 45 00.
(b) Late submissions, modifications, revisions, and withdrawals of quotes. Quoters are responsible for submitting quotes, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. Quotes received after the designated time may not be considered if the Contracting Officer has begun the evaluation process.
(c) Contract award. The Government intends to evaluate quotes and award a contract without discussions with Quoters. Therefore, the Quoter's initial response should contain the Quoter's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all quotes if such action is in the public interest (i.e. cost prohibitive); accept other than the lowest quote; and waive informalities and minor irregularities in quotes received.
(d) System for Award Management (SAM). To be considered for award all Quoters must be successfully registered in the SAM database (www.sam.gov) AT THE TIME A QUOTE IS SUBMITTED. See FAR Clause 52.204-7, System for Award Management, as applicable for requirement information. Contractors shall have representations and certifications completed in www.sam.gov OR provide FAR clause 52.204-8, Annual Representations and Certifications, with paragraph (c) completed. If completing the aforementioned clause, provide with submitted bid.
(e) Unique Entity Identifier (formerly Data Universal Numbering System (DUNS) Number. Place the mailto:tracy.marino@usda.gov http://www.sam.gov/ annotation "Unique Entity Identifier" as well as Electronic Funds Transfer (EFT indicator, if applicable (formerly DUNS+4)" next to your name and address on the first page of your quote. The EFT indicator is a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the Quoter to establish additional SAM records for identifying alternative EFT accounts (see subpart 32.11) for the same entity. If the Quoter does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for unique entity identifier establishment directly to obtain one. The Quoter should indicate that it is a Quoter for a Government contract when contacting the entity designated at www.sam.gov for establishing the unique entity identifier.
(f) Electronic Submissions
(1) Quoters must submit electronic responses this solicitation. Email quotes to tracy.marino@usda.gov. Please limit the size of your file to 5 MB or less; more is not always better, so please be concise. Include the solicitation number in the subject line of the email. Files in Adobe Acrobat are the preferred file type; other types may be accepted but the quoter may be required to change type if the Government cannot open the attachment.
(2) If any portion of a quote received by the Contracting Officer is unreadable to the degree that conformance to the essential requirements of the solicitation cannot be ascertained from the document--
(i) The Contracting Officer immediately shall notify the quoter and permit the quoter to resubmit the quote.
(ii) The method and time for resubmission shall be prescribed by the Contracting Officer after consultation with the quoter; and
(iii) The resubmission shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timeliness, provided the quoter complies with the time and format requirements for resubmission prescribed by the Contracting Officer.
(3) Facsimile Submissions will not be accepted.
(4) Hard Copy Submissions will not be accepted
Basis for Award
(a) The contracting officer shall make a contract award (1) by written or electronic notice; (2) within the time for acceptance specified in the quote or an extension; and (3) to that responsible quoter whose quote, conforming to the solicitation, will be most advantageous to the Government.
(b) To be determined responsible, a prospective contractor must --
(1) Have adequate financial resources to perform the contract, or the ability to obtain them;
(2) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;
(3) Have a satisfactory performance record. A prospective contractor shall not be determined responsible or non-responsible solely on the basis of a lack of relevant performance history;
(4) Have a satisfactory record of integrity and business ethics;
(5) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors).
(6) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them;
and http://www.sam.gov/ mailto:tracy.marino@usda.gov
(7) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
(c) To be determined responsive, a responsive bid must comply in all material respects with the solicitation.
Examples of solicitation requirement that could determine responsiveness include:
- acknowledgement of amendments (if any);
- completed representations and certifications; and
- quoters not furnishing unit prices for each item listed in the Schedule requiring a unit price. If the quoter fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. Should any mathematical check made by the Government show a mistake in the extended amount quoted, the corrected unit price extension shall govern. IF A QUOTER OMITS
BOTH THE UNIT PRICE AND THE EXTENDED TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS
BID SHALL BE DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR AWARD. Pricing must be submitted for all items.
(d) The Government will determine the acceptability of each quote on a pass or fail basis considering the following factors. Quotes that fail any of these elements will not be considered for award.
(1) A quoter takes exception to the any of the terms and conditions of the RFQ, including attachments.
(2) A quoter is not currently registered in the System for Award Management (SAM) by the closing date of the solicitation.
(3) A quoter cannot be verified as a Small Business as shown in SAM or other proof as submitted by the quoter.
(4) An incomplete quote that lacks sufficient information for the government to perform a technical evaluation to determine acceptability.
(e) Remaining quotes will be evaluated and award will be made as a whole to one quoter.
(1) For past performance, each quote will be evaluated on their performance under existing and prior contracts of a similar nature. The Government will focus on information that demonstrates quality of performance relative to the size, scope, work type and complexity of the procurement under consideration. The Government may contact references beyond those identified by the quoter to obtain additional information used in the responsibility determination and in the evaluation of the Quoters past performance. Performance information may be obtained on any federal, state, local, and commercial contract performance of the quoter that is known to the Government and may include information from existing contract files. Additionally, personal experience and an evaluator 's personal knowledge of Quoters performance may be used. The Government will be accessing whether work performed on similar projects reflects a positive record of customer satisfaction and contract compliance.
(2) Relevant experience will be evaluated on the basis of the jobs that the quoter has had similar in size, scope, work type and complexity to the work that the contractor will have to perform under the contract awarded based upon this solicitation. The government will be accessing whether the experience is relevant to the work to be performed under this solicitation.
(3) Price will include consideration of pay item prices entered in OF 336 CONTINUATION SHEET. It is the Government's intent to assess the unit prices to determine reasonableness and Quoters understanding of the work and ability to perform the contract.
Evaluation Criteria
(a) The following factors will be used to evaluate quotes:
1. Past Performance
2. Relevant Experience
3. Price
Factor 1: Relevant Past Performance - Past performance is a measure of the degree to which a vendor, as an organization, has satisfied its customers, and complied with federal, state, and local laws and regulations on projects similar in size, scope, work type and complexity. Quoters shall submit past performance information for their firm and any proposed major subcontractors. Performance information may be obtained from references provided. List major contracts and subcontracts completed during the past three years and all contracts and subcontracts in progress. The list should include, but is not limited to, contracts and subcontracts similar in nature and complexity to that required by this solicitation. Include contracts with the Federal Government, agencies of state and local governments, and commercial customers. Quoters that are newly formed entities, without prior contracts as an entity, should list contracts and subcontracts completed by all key personnel. Firms with no experience in the type of work described may show similar type projects which demonstrate their ability to perform in a timely manner, experience, and past performance of their employees, or their work as a subcontractor.
Factor 2: Relevant Experience - Relevant Experience: Relevant Experience is the measure of your experience in projects of similar size, scope, work type and complexity. Relevant experience must be clearly demonstrated and not left to speculation. Identify specific projects successfully completed that you consider gives the evidence that proves your firm has the depth and breadth of experience required to perform the various tasks contemplated in this solicitation.
Factor 3: Price
(b) Options. Except when it is determined not to be in the Government's best interests, the Government will evaluate quotes for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of a quote, furnished to the successful quoter within the time for acceptance specified in the quote, shall result in a binding contract without further action by either party. Before the quote's specified expiration time, the Government may accept a quote (or part of a quote), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
Bid Submission Checklist
All information required by the terms of the solicitation must be furnished. Important items for you to check are included in but not limited to, those listed below, so ensure you read the solicitation carefully. This checklist is furnished only to assist you in submitting a proper quote. Check as you read.
Have you acknowledged all amendments? Acknowledge all amendments on the reverse side of the SF 1422 (Solicitation, Offer and Award), Block 19
Have you completed SECTION 00 45 00, REPRESENTATIONS & CERTIFICATIONS portion of the solicitation package?
Is your quote properly signed?
If a bid guarantee is required, is it included with your quote? (A late bid guarantee is treated the same as a late quote)
Is your bid guarantee in the proper amount? See FAR 52.228-1
If your bid guarantee is in the form of a bid bond, is the bond properly signed by both the bidder and surety and are all required seals affixed? Does the scanned copy show enough detail to verify its initial validity?
Is the name in which you submitted the bid the same on your bid as on your bid bond?
Have you entered a unit price for each bid item and does that unit price contain two decimal places?
Are decimals in unit prices in the proper places? Are your figures legible?
Are the extensions of your unit prices, and your total amount price correct?
Are all erasures or corrections initialed by the person signing the bid?
I have not restricted my bid by altering the provisions of the solicitation?
Have you provided a response to the Evaluation Criteria?
Are your Price and Technical two separate documents?
Will your quote arrive on time?
52.204-7 System for Award Management. (OCT 2018)
52.211-6 Brand name or equal. (AUG 1999)
52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (MAY 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of provision)
52.222-23 Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity for Construction. (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
6.8%
Goals for female participation for each trade
6.6%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled Affirmative Action Compliance Requirements for Construction, and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the-
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the covered area is Trinity County, California.
(End of provision)
52.225-10 Notice of Buy American Requirement - Construction Materials. (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American-Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225- 9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
52.236-27 Site Visit (Construction). (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigation and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Jerry McCluskey or Victor Dumlao
Address: 1330 Bayshore Way ...............Eureka CA 95501
Telephone: 707-441-3664 or 707-441-3654 respectively
(End of provision)
52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far (Federal Acquisition Regulation) https://www.dm.usda.gov/procurement/policy/agar.htm (Agriculture Acquisition Regulation)
SECTION 00 45 00 - Representations and Certifications
52.204-16 Commercial and Government Entity Code Reporting. (JUL 2016)
52.204-8 Annual Representations and Certifications. (DEC 2019)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238160.
(2) The small business size standard is $16.5M.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph
(d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
___ (i) Paragraph (d) applies.
___ (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless-
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include provision at 52.204- 7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that-
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.204-26, Covered Telecommunications Equipment or Services-Representation. This provision applies to all solicitations.
(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations-Representation.
(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(x) 52.214-14, Place of Performance-Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xii) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.
(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-Representation. This provision applies to solicitations that include the clause at 52.204-7.)
(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xxi) 52.225-4, Buy American-Free Trade Agreements-Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.)
This provision applies to solicitations containing the clause at 52.225-3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $80,317, the provision with its Alternate II applies.
(D) If the acquisition value is $80,317 or more but is less than $100,000, the provision with its Alternate III applies.
(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.
(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan-Certification. This provision applies to all solicitations.
(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certifications. This provision applies to all solicitations.
(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
(Contracting Officer check as appropriate.)
[X] (i) 52.204-17, Ownership or Control of Offeror.
[X] (ii) 52.204-20, Predecessor of Offeror.
[ ] (iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
[ ] (iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Certification.
[ ] (v) 52.222-52, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Certification.
[ ] (vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Alternate I only).
[ ] (vii) 52.227-6, Royalty Information.
[ ] (A) Basic.
[ ] (B) Alternate I.
[ ] (viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause No. Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
SECTION 00 72 00 - General Conditions
52.204-13 System for Award Management Maintenance. (OCT 2018)
52.204-18 Commercial and Government Entity Code Maintenance. (JUL 2016)
52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015)
52.219-6 Notice of Total Small Business Set-Aside. (NOV 2011)
52.222-6 Construction Wage Rate Requirements. (AUG 2018)
52.222-7 Withholding of Funds. (MAY 2014)
52.222-8 Payrolls and Basic Records. (AUG 2018)
52.222-9 Apprentices and Trainees. (JUL 2005)
52.222-10 Compliance With Copeland Act Requirements. (FEB 1988)
52.222-11 Subcontracts (Labor Standards). (MAY 2014)
52.222-12 Contract Termination - Debarment. (MAY 2014)
52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015)
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (SEP 2013)
52.228-2 Additional Bond Security. (OCT 1997)
52.228-5 Insurance - Work on a Government Installation. (JAN 1997)
52.228-11 Pledges of Assets. (AUG 2018)
52.228-14 Irrevocable Letter of Credit. (NOV 2014)
52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014)
52.232-23 Assignment of Claims. (MAY 2014)
52.232-27 Prompt Payment for Construction Contracts. (JAN 2017)
52.236-2 Differing Site Conditions. (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)
52.236-5 Material and Workmanship. (APR 1984)
52.236-6 Superintendence by the Contractor. (APR 1984)
52.236-7 Permits and Responsibilities. (NOV 1991)
52.236-8 Other Contracts. (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)
52.236-10 Operations and Storage Areas. (APR 1984)
52.236-11 Use and Possession Prior to Completion. (APR 1984)
52.236-12 Cleaning Up. (APR 1984)
52.236-13 Accident Prevention. (NOV 1991)
52.236-14 Availability and Use of Utility Services. (APR 1984)
52.236-15 Schedules for Construction Contracts. (APR 1984)
52.236-17 Layout of Work. (APR 1984)
52.236-21 Specifications and Drawings for Construction. (FEB 1997)
52.236-26 Preconstruction Conference. (FEB 1995)
52.242-14 Suspension of Work. (APR 1984)
52.243-5 Changes and Changed Conditions. (APR 1984)
52.246-12 Inspection of Construction. (AUG 1996)
52.246-21 Warranty of Construction. (APR 1984)
52.249-10 Default (Fixed-Price Construction). (APR 1984)
52.253-1 Computer Generated Forms. (JAN 1991)
452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996)
452.236-71 Prohibition Against the Use of Lead-Based Paint. (NOV 1996)
452.236-72 Use of Premises. (NOV 1996)
452.236-73 Archaeological or Historic Sites. (FEB 1988)
452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996)
452.236-77 Emergency Response. (NOV 1996)
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
52.213-4 Terms and Conditions - Simplified Acquisitions (Other Than Commercial Items). (OCT 2019)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).
(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
(iv) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
(v) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(vi) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).
(vii) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(viii) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(ix) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78 (19 U.S.C. 3805 note).
(2) Listed below are additional clauses that apply:
(i) 52.232-1, Payments (APR 1984).
(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).
(iii) 52.232-11, Extras (APR 1984).
(iv) 52.232-25, Prompt Payment (JAN 2017)
(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).
(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013).
(vii) 52.233-1, Disputes (MAY 2014).
(viii) 52.244-6, Subcontracts for Commercial Items (AUG 2019).
(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2018) (Pub. L. 109-282) (31 U.S.C. 6101 note) (Applies to contracts valued at $30,000 or more).
(ii) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (OCT 2019) (E.O. 13126.) (Applies to contracts for supplies exceeding the micro-purchase threshold).
(iii) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (MAY 2014) (41 U.S.C. chapter 65) (Applies to supply contracts over $15,000 in the United States, Puerto Rico, or the U.S. Virgin Islands).
(iv) 52.222-35, Equal Opportunity for Veterans (OCT 2015) (38 U.S.C. 4212) (applies to contracts of $150,000 or more).
(v) 52.222-36, Equal Employment for Workers with Disabilities (JUL 2014) (29 U.S.C. 793) (Applies to contracts over $15,000, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, "United States" includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)
(vi) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212) (Applies to contracts of $150,000 or more).
(vii) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).
(viii)(A) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627) (Applies to all solicitations and contracts).
(B) Alternate I (MAR 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).
(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia)).
(x) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia.))
(xi) 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2011) (E.O. 13423) (Applies to services performed on Federal facilities).
(xii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693)(applies to contracts for products as prescribed at FAR 23.804(a)(1)).
(xiii) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).
(xiv)…