Q&A_Version_2_-_08.01.19.docx

DOCX document 16 KB Posted

Attached to
Double Devil Corrals Water System Improve Federal contract opportunity
Solicitation number
129AC719Q0057
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Q&A #2

View the file

Other files for this federal contract opportunity

Other files attached to Double Devil Corrals Water System Improve, newest first.
File Type Posted
Q&A_Version_1_-_08.01.19.docx DOCX document
WD_CA190007,_Rev_5_dated_07.26.2019.pdf PDF
129AC719Q0057-0001.pdf PDF
WD_CA190007,_Rev_4_dated_05.03.2019.pdf PDF
Site_Plan.pdf PDF
129AC719Q0057.pdf PDF
Project_Drawings_and_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hay Barn for Double Devil Wild Horse Corrals (129AC719Q0057) Questions and Answers Document

Subsequent versions of this document will contain questions from all previous versions.

Version 2: 08/01/2019

Q1 - On Q8 we asked about the HDPE lines and there direction of travel, the answer stated we could see this on sheet 66 of plans. Is there a missing set of plans for this because the plans on FBO don’t have that many sheets?

A1 - The Project Drawings and Specifications document posted with the solicitation on 7/22/19 is 71 pages long. Please see page 66.

Q2 - Q5 says see site plan and what we have is a Google map with scale and no ways to reference as to what original size was so no way to calculate correct distances.

A2 - The Project Drawings and Specifications document posted with the solicitation on 7/22/19 is 71 pages long. Please see page 66.

Q3 - Site plan is referenced several times to gain measurements, do you have a regular site plan ?

A3 - The Project Drawings and Specifications document posted with the solicitation on 7/22/19 is 71 pages long. Please see page 66.

Q4 - Will you be supplying the tires for stock tanks? On RFI#1 Q6 it mentions the ones you have?

A4 - The FS has 7 tires available on site. The other troughs will need to be supplied by the contractor.

Version 1: 08/01/2019

Q1 - Need to know how long power run from Main panel to last transformer A1 - The 2 transformers are located immediately west of the County Road 74; the associated 2 panels are located across the street in the corrals area, approximately 200 feet from the panels.

Q2 - How many AMP’s available in main panel?

A2 - 400 at the south panel near the corrals buildings; 200 at the north panel near the well

Q3 - Is there a preferred stock tank heater brand?

A3 - No

Q4 - Is there any further detail on connection of stock tank heaters to power source (hardwire or weather proof plug enclosures) A4 - Hardwired with switches preferred; weather proof outlets also acceptable

Q5 - What is the distance from pump to last water trough, how big are the pens A5 - Pens are roughly 110’ x 130’. See site plan for more detail.

Q6 - What size do you want the equipment tire to be? Would you be open to a different style stock tank?

A6 - We would be open to different styles. The tires we have are ~1200 gallon.

Q7 - Is the 10,000-gal tank 1 unit or 2 it is showed both ways on the plan?

A7 - 1 unit

Q8 - In the schedule of items 002 storage tank to dual 2-inch HDPE lines feeding west and another 2-inch HDPE west. Is there 3 lines all going West?

A8 - See sheet 66 in plans. Single line goes to hay barn, dual lines go to corrals.

Q9 - Do we need stamped design plans for water system booster and pressure tanks and heated shed?

A9 - No, but proof of calculations is required

Q10 - Will we need stamped and signed electrical plans from Engineer for submittal?

A10 - No, but a licensed electrician must sign off before FS acceptance

Q11 - Who will be responsible for pulling permits?

A11 - No permits are required

Q12 - On the option items you are supplying HDPE but not on main items correct?

A12 - FS is providing 7500’ of 2-inch and 1000’ of 1.5-inch Q13 - What is the period of performance on this project?

A13 – See FAR clause 52.211-10 contained in the solicitation.