Amend_2_SF30.pdf
PDF 416 KB Posted
- Attached to
- Tatham Ridge Fuels Project Federal contract opportunity
- Solicitation number
- 129AC718Q0048
About this file
Amendment 002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tatham_Fire_Plan.pdf | ||
| Amendment_001_129AC718Q0048.pdf | ||
| Maps.pdf | ||
| 77-0727,_rev._55,_04092018.pdf | ||
| Tatham_Ridge_solicitation,_129AC718Q0048.pdf | ||
| Tatham_Ridge_solicitation,_129AC718Q0048.pdf | ||
| Maps.pdf | ||
| 77-0727,_rev._55,_04092018.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
129AC718Q0048
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
9AC7
REDDING CA 96002
3644 AVTECH PARKWAY SUITE 180
R5 NO-CAL ACQ SERVICE AREA NCASA
USDA FOREST SERVICE
07/02/20180002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/27/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return ______1____________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
KATHERINE E. PASINI
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
TATHAM RIDGE THIN AND HAND PILE
MENDOCINO NATIONAL FOREST
Amendment 2 hereby removes and replaces page 25 with the attached amended page 25.
Response due date is hereby extended until 1:30pm on Thursday August 2, 2018.
All other requirements remain unchanged.
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
7/30/2018
X
Tatham Ridge Fuels Project, 129AC718Q0048 Amended Page 25
Retain all existing downed logs (20 inches in diameter or greater at the large end and at least 10 feet in length not to exceed 4 logs per acre). Snags shall not be cut unless they present an immediate hazard to operations in the project area. Cut snags shall be left in place on the ground.
All trees over 12 feet tall that are not cut shall be pruned of lower branches. Branches shall be pruned from the ground to 6 feet high. Pruning shall be conducted in such a way that there is no damage to the main stem of the tree.
All cut material over 1 inch in diameter shall be piled (except for cut snags), unless terrain and tree spacing does not allow for proper pile location. Sections of tree boles over 10 inches in diameter may be bucked to 6—8 feet sections, and stacked separately from the burn pile and/or scattered on the forest floor. No “jackstrawing” of cut and scattered logs shall be allowed. All piles shall be constructed by laying limbs, stems, cut boles, and other slash in the pile so as to be parallel with each other and up and down the slope to prevent material from rolling downhill during pile ignition. Each pile shall include an area of small sized slash near the bottom of the pile to provide kindling for prompt ignitions and to aid in combustion of larger slash.
Maximum pile size shall be 6 feet in diameter by 6 feet in height. All material shall be cut to a length such that it can be placed in a pile without exceeding these maximum dimensions (see Pile Construction figure below). There may be instances where larger piles are acceptable. For example, in a large opening, 50 feet in diameter, a pile may be 10 feet in diameter by 6 feet high. The Contractor shall contact the COR if suitable locations are found for approval to create these larger piles. In other areas, it may be beneficial to remove a leave tree if too much cut material is present and create a larger opening for a larger pile. The COR shall be contacted to give approval of such locations.
Other suitable and preferred locations are on existing skid trails scattered throughout the units. Piles shall be constructed at least 15 feet apart, unless the COR gives his/her consent. All hand piles shall be covered with 4ft X 4ft, 6 mil thick plastic to promote drying and ignitions. Brush/slash shall be piled on the plastic to ensure it stays in place. Piles shall be placed so that flames from the pile will not impact leave trees.
Piles shall not be closer than 10 feet from leave trees and felled snags. Piles shall not be closer than 20 feet from unit boundaries, edges of roads or trails, meadows, or private ground. Piles shall be located a minimum of 5 feet away from stream channels, springs, or seeps. Not all water features within the project area have been identified therefore pile locations shall be determined as water features are discovered. Pile locations may be approved by the COR or other designated Government representative in the field. Slash shall not be piled or placed on logs, on stumps larger than 2 feet in diameter, in ditches, against trees, or left within 25 feet of roads. All open roads shall be kept free of thinning slash.
11. Inspections
Measurable Performance Standard in Visual Inspection Procedures
| Amend 2_Tatham Ridge working solicitation rev 7-25-18.pdf |
| 1. FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) |
| 2. FAR 52.212-4 Contract Terms and Conditions—Commercial Items (Jan 2017) |
| 3. FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Items (JAN 2018) |
| 4. AGAR 452.215-73 Postaward Conference (NOV 1996) |
| 5. Employment of Eligible Workers |
| Employment of Eligible Workers |
| Workforce Certification |
| H-2B Workers: (http://www.foreignlaborcert.doleta.gov/) |
| MSPA Workers: (http://www.dol.gov/whd/mspa/) |
| 6. Scope of Contract |
| 7. Location and Access |
| Location |
| Access |
| 8. Period of Performance |
| 9. Unit Descriptions (Mandatory Units) |
| Optional Units |
| 10. Specific Work Requirements |
| Thinning Prescription: |
| Snags and Logs: |
| 11. Inspections |
| 12. Acceptable Quality Level (AQL) |
| 13. Re-inspection and Acceptance |
| 14. Penalties and Incentives |
| 15. Unique Factors |
| Motorized Equipment. |
| Safety |
| Protection, Use and Maintenance of Improvements |
| Landscape Preservation |
| Endangered Species |
| Preservation of Historical and Archeological Resources |
| Special Situations |
| Environmental Interruption of Work |
| 16. Definitions |
| 17. Government-Furnished Property |
| 18. Contractor Personnel and Equipment |
| Contractor On-Site Representative |
| Work Foreman |
| Contractor Employees |
| Subcontractors |
| 19. Acceptable Quality Level for Tasks and Critical Subtasks |
| 20. Means and Methods of Quality Measurement |
| Contractor Quality Control |
| Rework of a Unit |
| Government Re-inspection upon Contractors Request |
| Acceptance |
| 21. Penalties and Incentives |
| 22. Contract Administration Data |
| Notice to Proceed |
| Invoices |
| Final Cleanup |
| Contract Release |
| Contractor Performance Assessment Reporting System (CPARS) |
| 23. List of Attachments and Exhibits |
| 24. 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998) |
| 25. FAR 52.216-1 Type of Contract. (APR 1984) |
| 26. FAR 52.237-1 Site Visit (Apr 1984) |
| 27. Organized Site Visit |
| 28. AGAR 452.219-70 Size Standard and NAICS Code Information. (SEP 2001) |
| 29. Electronic Submissions |
| 30. Supplemental Instructions for Submission of Offers and Other Information |
| 31. Evaluation Criteria |
| 32. Award Determination |
| 33. FAR 52.212-3 Offeror Representations and Certifications-Commercial Items (NOV 2017) |
File details come from the government source that posted it.