129AC718Q0011.pdf

PDF 1 MB Posted

Attached to
SMMU Water Drafting Site Improvements Federal contract opportunity
Solicitation number
129AC718Q0011
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

9AC7

REDDING CA 96002

3644 AVTECH PARKWAY SUITE 180

R5 NO-CAL ACQ SERVICE AREA NCASA

USDA FOREST SERVICE

9A33 CODE 16. ADMINISTERED BYCODE

X

X

X

561730

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED OR9AC7

RFPIFB

10. THIS ACQUISITION ISCODE

RFQ

14. METHOD OF SOLICITATION

13b. RATING

NAICS:

SMALL BUSINESS

05/03/2018 1200 PT

03/26/2018

530-226-2408SANDRA VINCENT

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

129AC718Q0011

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 38 889918OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

17a. CONTRACTOR/

MOUNT SHASTA CA 96067

204 W ALMA ST

MT SHASTA RANGER DISTRICT

SHASTA-TRINITY NF

USDA FOREST SERVICE

15. DELIVER TO

REDDING CA 96002

3644 AVTECH PARKWAY SUITE 180

R5 NO-CAL ACQ SERVICE AREA NCASA

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$7.50

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

11.

SEE SCHEDULE

12. DISCOUNT TERMS

THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

8(A)

USDA FOREST SERVICE

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

SMMU Water Drafting Site Improvements Shasta-Trinity National Forest

See instructions for quoting on solicitation pg 3.

Quoter DUNS:_____________________________________

Quoter Email:____________________________________

Continued ...

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED

SANDRA VINCENT

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

OFFER

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT:

REF.

NAME: ___________________________________________

ADDRESS:_________________________________________

PHONE:___________________________________________

Invoicing via Invoice Processing Platform (www.ipp.gov) is required.

Payment will be made by Electronic Funds Transfer (EFT) to the account specified in the Contractor's System for Award Management Entity (www.sam.gov).

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 2/2012) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

001 Ash Creek @ Sugar Pine Butte Rd/FA19 (~0.17 acres) 1 LS

002 Ash Creek @ Pilgrim Creek Rd/FA13 (~0.28 acres) 1 LS $_________________

003 McCloud River @ Algoma & 39N06 (~0.43 acres) 1 LS $_________________

004 McCloud River @ Cattle Camp Swimming Hole (~0.19 1 LS $_________________ acres)

005 Tate Creek 39N51 (~0.04 acres) 1 LS $_________________

006 Bear Springs @ McKenzie Butte/31 Rd (~0.50 acres) 1 LS $_________________

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

38 2 of

A - Continuation of SF1449 Response Required to be Considered for Award

B - Contract Clauses Full Text Clauses Clauses Incorporated by Reference

C - Contract Documents D - Solicitation Provisions

Full Text Provisions E - Evaluation Factors

A - Continuation of SF1449

Response Required to be Considered for Award

Submission of Quotes There is no need to return any portion of the solicitation that is not part of a quote.

Submission of quotes by email is preferred, to svincent02@fs.fed.us Submission of quotes by fax of up to 20 pages is acceptable to 530-226-2474.

Quotes may be mailed or delivered to:

USDA FS NCASA (c/o SVincent) | 3644 Avtech Parkway | Redding, CA 96002.

SAM Entity Required to Receive Award The System for Award Management (SAM) is an online database for Contractor registration, representations and certifications. Quoters must have a DUNS Number and an Active SAM Entity to receive award.

1. Quoters with an Active SAM Entity shall provide their DUNS Number.

2. Quoters without an Active SAM Entity shall fill out FAR Provision 52.212-3, Offeror Representations and Certifications - Commercial Items, and return it completed as part of the quote. The Provision has been provided in full-text in the Solicitation Provisions section. Quoters may submit quotes before SAM Entity Registration/ Activation is complete, but are advised that Activation takes 7-10 to process after registering and that the Government is not obligated to delay award while an Entity becomes Active. There is no cost to obtain a DUNS Number or SAM Entity or to contact the FSD through the official sources.

To obtain a DUNS Number: http://fedgov.dnb.com/webform To Register or Renew a SAM Entity: www.sam.gov To contact the SAM Helpdesk (The Federal Service Desk, or FSD): www.fsd.gov

Response to Evaluation Factors (Technical and Price Criteria) All Quoters must respond to all Evaluation Factors as described in the Evaluation Factors section.

Incomplete quotes may not be considered.

Site Visit (Pre-Quote) A pre-quote site visit is planned for April 18, 2018, at 8:00 AM at the Forest Service Mt. Shasta McCloud Management Unit, 2019 Forest Road, McCloud, CA 96057. Those wishing to attend may show up at the appointed place or contact Anna Courtney at 530-964-3772 or annamcourtney@fs.fed.us; or alternatively Eve Vardanega at 530-926-9658 or evardanega@fs.fed.us. RSVP is advised if you would like to be notified in the event of meeting cancellation or rescheduling. No Government transportation will be provided.

Quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable.

Solicitation Questions Please contact Sandra Vincent with any other questions about the solicitation at svincent02@fs.fed.us or 530-226-2408.

SMMU Water Drafting Site Improvements Page 3 of 38 svincent02 Highlight

B - Contract Clauses

Full Text Clauses

52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders - Commercial Items. (JAN 2018)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(3) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(4) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

[ ] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (SEP 2006), with Alternate I (OCT 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

[ ] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (OCT 2015) (41 U.S.C. 3509).

[ ] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

[ ] (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2016) (Pub. L. 109-282) (31 U.S.C. 6101 note).

(5) (Reserved)

[ ] (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111- 117, section 743 of Div. C).

[ ] (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

[X] (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015) (31 U.S.C.

6101 note).

[ ] (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (JUL 2013) (41 U.S.C. 2313).

[ ] (10) (Reserved)

SMMU Water Drafting Site Improvements Page 4 of 38

[ ] (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

[ ] (ii) Alternate I (NOV 2011) of 52.219-3.

[ ] (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

[ ] (ii) Alternate I (JAN 2011) of 52.219-4.

[ ] (13) (Reserved)

[X] (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C.

644).

[ ] (ii) Alternate I (NOV 2011).

[ ] (iii) Alternate II (NOV 2011).

[ ] (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (JUN 2003) (15 U.S.C.

644).

[ ] (ii) Alternate I (OCT 1995) of 52.219-7.

[ ] (iii) Alternate II (MAR 2004) of 52.219-7.

[ ] (16) 52.219-8, Utilization of Small Business Concerns (NOV 2016) (15 U.S.C.

637(d)(2) and (3)).

[ ] (17)(i) 52.219-9, Small Business Subcontracting Plan (JAN 2017) (15 U.S.C.

637(d)(4)).

[ ] (ii) Alternate I (NOV 2016) of 52.219-9.

[ ] (iii) Alternate II (NOV 2016) of 52.219-9.

[ ] (iv) Alternate III (NOV 2016) of 52.219-9.

[ ] (v) Alternate IV (NOV 2016) of 52.219-9.

[ ] (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

[X] (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).

[ ] (20) 52.219-16, Liquidated Damages-Subcontracting Plan (JAN 1999) (15 U.S.C.

637(d)(4)(F)(i)).

[ ] (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657f).

[X] (22) 52.219-28, Post Award Small Business Program Rerepresentation (JUL 2013) (15 U.S.C. 632(a)(2)).

[ ] (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (DEC 2015) (15 U.S.C.

637(m)).

SMMU Water Drafting Site Improvements Page 5 of 38

[ ] (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (DEC 2015) (15 U.S.C. 637(m)).

[X] (25) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

[X] (26) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (JAN 2018) (E.O. 13126).

[X] (27) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

[X] (28) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).

[ ] (29) 52.222-35, Equal Opportunity for Veterans (OCT 2015) (38 U.S.C. 4212).

[X] (30) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).

[ ] (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).

[ ] (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

[X] (33)(i) 52.222-50, Combating Trafficking in Persons (MAR 2015) (22 U.S.C. chapter 78 and E.O. 13627).

[ ] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O.

13627).

[X] (34) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989).

(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

[ ] (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA- Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ](36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).

[ ](37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).

[ ] (38)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

[ ] (ii) Alternate I (OCT 2015) of 52.223-13.

[ ] (39)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

(ii) Alternate I (JUN 2014) of 52.223-14.

[ ] (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).

SMMU Water Drafting Site Improvements Page 6 of 38

[ ] (41)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

[ ](ii) Alternate I (JUN 2014) of 52.223-16.

[X] (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011)

[ ] (43) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

[ ] (44) 52.223-21, Foams (JUN 2016) (E.O. 13693).

[ ] (45)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

[ ] (ii) Alternate I (JAN 2017) of 52.224-3.

[ ] (46) 52.225-1, Buy American-Supplies (MAY 2014) (41 U.S.C. chapter 83).

[ ] (47)(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (MAY 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

[ ] (ii) Alternate I (MAY 2014) of 52.225-3.

[ ] (iii) Alternate II (MAY 2014) of 52.225-3.

[ ] (iv) Alternate III (MAY 2014) of 52.225-3.

[ ] (48) 52.225-5, Trade Agreements (OCT 2016) (19 U.S.C. 2501, et seq., 19 U.S.C.

3301 note).

[X] (49) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

[ ] (50) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

[ ] (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150).

[ ] (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area

(NOV 2007) (42 U.S.C. 5150).

[ ] (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

[ ] (54) 52.232-30, Installment Payments for Commercial Items (JAN 2017) (41 U.S.C.

4505, 10 U.S.C. 2307(f)).

[X] (55) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (JUL 2013) (31 U.S.C. 3332).

[ ] (56) 52.232-34, Payment by Electronic Funds Transfer - Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).

[ ] (57) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

SMMU Water Drafting Site Improvements Page 7 of 38

[ ] (58) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C.

637(d)(12)).

[ ] (59)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

[ ] (ii) Alternate I (APR 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

[ ] (1) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495).

[X] (2) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).

[X] (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[ ] (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[ ] (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

[ ] (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (MAY 2014) (41 U.S.C. chapter 67).

[ ] (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).

[X] (8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015).

[X] (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O.

13706).

[ ] (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).

[ ] (11) 52.237-11, Accepting and Dispensing of $1 Coin (SEP 2008) (31 U.S.C.

5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records - Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, SMMU Water Drafting Site Improvements Page 8 of 38

Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) of this paragraph in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (OCT 2015) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.219-8, Utilization of Small Business Concerns (NOV 2016) (15 U.S.C.

637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iv) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O.

13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.

(v) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(vi) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).

(vii) 52.222-35, Equal Opportunity for Veterans (OCT 2015) (38 U.S.C. 4212).

(viii) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).

(ix) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).

(x) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xi) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C.

chapter 67).

(xii) [ ] (A) 52.222-50, Combating Trafficking in Persons (MAR 2015) (22 U.S.C. chapter 78 and E.O. 13627).

SMMU Water Drafting Site Improvements Page 9 of 38

[ ] (B) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

(xiii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (MAY 2014) (41 U.S.C. chapter 67).

(xiv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).

(xv) 52.222-54, Employment Eligibility Verification (OCT 2015) (E. O. 12989).

(xvi) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015).

(xvii) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

(xviii)(A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

(B) Alternate I (JAN 2017) of 52.224-3.

(xix) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xx) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor May include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of clause)

52.246-4 Inspection of Services - Fixed-Price. (AUG 1996)

(a) Definitions. Services, as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

SMMU Water Drafting Site Improvements Page 10 of 38

(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may (1) require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and (2) reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may (1) by contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or (2) terminate the contract for default.

(End of clause)

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/?q=browsefar (FAR, clauses and provisions starting with 52) and http://www.dm.usda.gov/procurement/policy/agar.htm (AGAR, clauses and provisions starting with 452)

(End of clause)

52.252-6 Authorized Deviations in Clauses. (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter

1) clause with an authorized deviation is indicated by the addition of $(DEVIATION) after the date of the clause.

(b) The use in this solicitation or contract of any Department of Agriculture's (USDA) Acquisition Regulation (48 CFR Chapter 4) clause with an authorized deviation is indicated by the addition of $(DEVIATION) after the name of the regulation.

(End of clause)

Statement of Equivalent Rates for Federal Hires

Per FAR Clause 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014), the following information is provided:

The following is for information only. It is not a wage determination. The applicable wage determination is provided as an attachment.

Employee Class 1: 23440 Heavy Equipment Operator (WG-10) | Monetary Wage: $27.11 plus fringe Employee Class 2: 23470 Laborer (WG-2) | Monetary Wage: $14.49 plus fringe

Clauses Incorporated by Reference

52.212-4 Contract Terms and Conditions - Commercial Items. (JAN 2017)

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(SEP 2013)

52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-13 Accident Prevention. (NOV 1991)

SMMU Water Drafting Site Improvements Page 11 of 38 https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html#wp1153423

52.245-1 Government Property. (JAN 2017) - Alternate I (APR 2012)

452.228-71 Insurance Coverage. (NOV 1996)

452.236-77 Emergency Response. (NOV 1996)

SMMU Water Drafting Site Improvements Page 12 of 38

C - Contract Documents

SCOPE OF CONTRACT

The purpose of this contract is to bring six current water drafting sites up to Best Management Practices (BMP) standards. All six sites are routinely used by the U.S. Forest Service (USFS) for vegetation management projects. Each site is approximately half an acre or less (including access spurs). The Shasta- McCloud Management Unit (SMMU) is proposing to repair and improve each site with site specific measures to meet BMP standards. The range of activities proposed includes but is not limited to: rocking access spurs to drafting sites, native boulder bank reinforcement, placing native boulders (as wheel stops) to prevent trucks from entering the water source, infiltration improvement, and adding Geotextile. There are four sites where trees may need to be cut to facilitate improvements. A borate compound shall be applied to any cut stumps 14-inches or greater, following manufacturer's directions and state law, to help prevent the infection of Annosus (Heterobasidion root disease).

The Contractor shall utilize site-specific information provided in this solicitation to implement improvements within the bounds of the provided preliminary drawings. The Contractor shall furnish all technical expertise, labor, equipment, supervision, transportation, operation supplies (including but not limited to gravel, geotextile, and large boulders from local aggregate sources that match the materials found on-site) and incidentals necessary to complete the project, except for that which the contract clearly states is to be furnished by the Government. All equipment within the Contract area shall be in such mechanical condition and of an appropriate type to meet the requirements of the work.

DESCRIPTION

Location Project sites are located on the McCloud Ranger District of the Shasta Trinity National Forest. Detailed maps of the Shasta Trinity National Forest are available from the Headquarters office or the McCloud/Mt.

Shasta Ranger Station offices. Access to certain sites may be limited; the Government is not obligated to do any unscheduled road maintenance. It is the responsibility of the Contractor to determine the most suitable route to the project areas. All sites are normally accessible by standard pickup on forest roads.

Project Area Maps Maps provided in the contract are intended to show the general location and shape of the project areas.

UNIQUE FACTORS

Endangered Species The Government may direct the Contractor to discontinue operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, are discovered to be present in or adjacent to the project area. Actions taken under this paragraph shall be subject to the Stop-Work Order clause FAR 52.242-15.

Preservation of Historical and Archeological Resources If, in connection with operations under this contract, the Contractor, subcontractors, or the employees of any of them, discovers, encounters or becomes aware of any objects or sites of cultural value on the project area, such as historical or prehistorical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the COR in writing of the findings. No objects of cultural resource value may be removed. Operations may resume at the discovery site upon receipt of written instructions. Actions taken under this paragraph shall be subject to the Stop-Work Order clause FAR 52.242-15.

Environmental Interruption of Work Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions or fire danger. The

SMMU Water Drafting Site Improvements Page 13 of 38

Contractor will be given a resume work order that will document the date the work suspension ends. The count of contract time will stop during work interruptions in excess of one day at a time. All periods of interruptions directed by the Government will be documented. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.

Camping Camping is not permitted in US Forest Service campgrounds; however, it may be allowed elsewhere on US Forest Service land with the approval of the District Ranger and subsequent issuance of a camping permit, and a fire permit, along with following any fire restrictions that may be in place.

PERIOD OF PERFORMANCE

Estimated Start Date: May 29, 2018 Total Contract Time: 14 calendar days Completion By: July 27, 2018

Contract time shall begin within three calendar days of the date given on the Notice to Proceed. Work shall progress at a rate which will insure job completion within the calendar time specified above.

Note: Estimated starting date is not compulsory. Weather and appropriate ground conditions along with the Contractor's work schedule may dictate starting time as long as the whole project is complete by July 27, 2018.

Notice to Proceed The Government will issue a Notice to Proceed as soon as weather and ground conditions are favorable for the work, Contractor's work plan is accepted, and proof of worker's compensation insurance has been received.

Post-Award / Pre-Work Meeting A post award conference with the awarded Contractor may be required, and if so, will be held at a location and time mutually agreeable to the Government and the Contractor.

Work Restrictions Work may be performed at any time during the period of the contract except as determined by the COR or as stated below:

(1) In accordance with the Fire Plan.

(2) When the Contracting Officer (or designated representative) determines that adverse weather had made access too dangerous or the continued vehicular travel or use of equipment would cause unacceptable road or resource damage.

(3) Work is suspended by notice of a Work Order for non-compliance with the requirements of this contract.

Should additional resource protection measures become apparent, regardless of when such facts become known, the contract may be modified (bilaterally if measures would affect a contract scope change).

Discovery of such areas (include wildlife areas, heritage resource areas, and noxious weeds) by either party shall be promptly reported to the other party. Access may be delayed due to heavy logging activity and/or weather.

Rate of Progress Contract work shall be performed in accordance with the order of preference approved by the Contracting Officer Representative in the Contractor's work plan. The Contractor shall maintain progress at a rate which will assure quality and completion within the period of performance specified above. The Contractor shall inform the Contracting Officer as soon as possible of any actions or inactions by the Contractor or the Government which may affect the required delivery or completion times stated in the contract.

SMMU Water Drafting Site Improvements Page 14 of 38

DEFINITIONS

For all intents and purposes of this contract the following definitions apply:

Site: Water drafting site which needs improvement.

Cultural Resources: Tangible and intangible aspects of cultural systems, living and dead, that are valued by a given culture or contain information about the culture. Cultural resources include, but are not limited to sites, structures, buildings, districts, and objects associated with or representative of people, cultures, and human activities and events. Cultural resources include the entire spectrum of resources for which the Heritage Program is responsible, from artifacts to cultural landscapes, without regard to eligibility for listing on the National Register of Historic Places.

Dispersed Recreation: is activities that take place outside of developed camping or concessionaire-operated facilities, excluding motorized recreation.

Erosion: The process in which a material is worn away by precipitation, a stream of water, glaciers, winds and waves.

French drain: A French drain is a trench filled with gravel or rock or containing a perforated pipe that redirects surface water and groundwater away from an area. A French drain has perforated hollow pipes along the bottom to quickly vent water that seeps down through the upper gravel or rock.

Natural Disturbance Event: Events that alter the structure, composition, or function of terrestrial or aquatic habitats. Natural disturbances include, among others, drought, floods, wind, fires, wildlife grazing, and insects and diseases.

Resource Protection Measures (RPM): Resource Protection Measures are site specific protections or actions intended to minimize or eliminate potential environmental effects while achieving the desired condition. Development was guided by Forest Plan direction as well as other applicable law, regulation and policy; project-specific objectives; and resource concerns identified by the resource specialists.

Riparian Reserve (RR): Forest Plan management prescription for riparian areas (area consisting of riparian ecosystems, aquatic ecosystems, or wetlands referring to the land bordering a stream, lake, marsh, or wet meadow) where the conservation of aquatic and riparian dependent terrestrial resources received primary emphasis.

Rolling Dips: Rolling dips are depressions in a road or trail that force water to drain at the low spot.

GOVERNMENT PERSONNEL

Contracting Officer (CO) The Contracting Officer has full authority for the administration of the contract and will personally handle all matters beyond the authority of the COR. No other person is authorized to make changes to clauses, provisions, terms or requirements of the contract. Mutual agreement between the CO and Contractor is required for changes of time or cost to commercial services contracts.

Contracting Officer's Representative (COR) The COR is the on-site contract administrator for the Contracting Officer, whose duties and responsibilities include full authority for the day-to-day administration of the contract, except for matters pertaining to changes in contract price and time. Duties which are reserved for the CO are listed on the COR Designation Form.

Inspector(s) Inspectors may be designated by the COR who are responsible for checking the Contractor's compliance with the contract requirements.

SMMU Water Drafting Site Improvements Page 15 of 38

The Government is not responsible for costs incurred during the performance of work not covered under this contract or resulting from direction by non-authorized persons. If the Contractor is given direction that is considered to be outside of the scope of the contract, the Contractor should advise the Contracting Officer.

GOVERNMENT-FURNISHED COMPONENTS

The Government will perform removal of houndstongue at the Tate Creek Site.

CONTRACTOR PERSONNEL

Qualified contractors shall possess all of the skills, abilities and qualifications required to perform contract requirements.

Contractor On-Site Representative The Contractor shall designate in writing, a representative to act for the Contractor (signatory authority) during his or her absence. The Contractor's representative shall read and speak fluent English. The Contractor shall list the extent of authority the designated representative will have on the job. The Contractor or acting authorized Representative shall receive in-field communications or documentation from the COR/Inspector as required to keep the job in progress and adherence to technical specifications, as needed, to finish the job.

Subcontractors The Contractor shall promptly notify the Contracting Officer about any proposed subcontract arrangement related to this contract, in advance of entering into a subcontract. Any subcontractor must have the relevant experience and appropriate equipment for such work. The written notification shall include as a minimum:

(1) The name, address and telephone number of the subcontractor.

(2) The date upon which the subcontract would be initiated, and its duration.

(3) A detailed description of the work to be subcontracted, including a listing of contract items, units, etc., as appropriate.

(4) Documentation of the subcontractor's representative authority.

CONTRACTOR-FURNISHED COMPONENTS

The Contractor shall furnish all technical expertise, labor, equipment, supervision, transportation, operation supplies, materials not available naturally and appropriately at work sites, and incidentals necessary to complete the project.

EQUIPMENT CLEANING

Contractor shall clean all off road equipment prior to arrival on the District, and again before leaving the Tate Creek site, making sure equipment is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Areas identified by the Forest Service as being infested with invasive species of concern must not move equipment off-site without first taking reasonable measures to make each such piece of equipment is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds.

Contractor must advise Forest Service of measures taken to clean equipment prior to moving equipment off-site. Reasonable measures (such as the use of air pressure) shall not require the disassembly of equipment components or use of any specialized inspection tools.

SITE DESCRIPTIONS AND SPECIFICATIONS

Resource Protection Measures (RPMs) for all sites:

(1) Apply a registered borate compound to all stumps 14 inches and larger to prevent the spread of Heterobasidion root disease according to label directions.

SMMU Water Drafting Site Improvements Page 16 of 38

(2) Ensure compliance with Best Management Practices for water quality and soil management and is completely consistent with Forest standards and guidelines as listed (included as contract attachments):

(A) From the Forest Service Handbook

1. BMP 2.5 - Water Source Development and Utilization

2. BMP 2.13 - Erosion Control Plan (as required by BMP 2.5)

(B) From the National Core BMP Technical Guide

1. AqEco 1 - Aquatic Ecosystem Improvement and Restoration Planning

2. AqEco 2 - Operations in Aquatic Ecosystems (as referenced in AqEco 3)

3. AqEco 3 - Ponds and Wetlands

Ash Creek @ Pilgrim Creek Road (FA13) SW1/4 Sec. 33, T41N, R1W MDBM Existing Condition: Some riprap, some rock. Riling and erosion from truck overflow.

Specifications (Contractor determines sequence):

(1) Add native boulder bank reinforcement to armor the edges of the site.

(2) Place boulders as a block to stop trucks at the edge of the parking area: boulders to be 3-foot minimum diameter with flat face down and/or partially embedded as appropriate to inhibit displacement.

(3) Add appropriate geotextile and 3-inch aggregate subgrade for soil stabilization and better infiltration for pad where water trucks will be staging.

(4) Add a 1-inch plus surface rocking on the vehicle parking site.

(5) Shift parking area one vehicle width away from FA13 roadway.

(6) Perform slope improvement to drain away from creek. Allow water from parking area to drain away from creek, in case of overflow from trucks, to reduce erosion and risk of contamination into creek.

(7) Approximately 10 trees under 3 to 10-inch DBH to be cut; all trees are Ponderosa Pines. Trees shall be left on the ground for fire wood. Lop tops and limbs. Lop slash created (trees and limbs smaller than 4-inches in diameter) to 1-foot or less, or chip.

Ash Creek @ Sugar Pine Butte Road (FA19) E1/2E1/2 Sec. 30, T41N, R1W, MDBM Existing Condition: Several unauthorized routes provide access to the creek and none are currently managed. Drafting is done from the road as well.

Specifications (Contractor determines sequence):

(1) Improve road gradient by reducing the pitch slope down to creek and add surface rocking (1-inch plus) to this section of road spur, and the existing turn around area. Include drainage and/or rolling dip on road where appropriate for trucks to still use.

(2) Add native boulder bank reinforcement to armor the creek bank.

(3) Place large boulders to prevent vehicles from entering the Creek: boulders to be 3-foot minimum diameter with flat face down and/or partially embedded as appropriate to inhibit displacement.

(4) Add appropriate geotextile and 3-inch aggregate subgrade.

(5) Add a 1-inch plus surface rocking.

(6) Perform slope improvement to drain away from creek.

(7) Block unauthorized routes, and stabilize other creek access using native rocks; allowing sites to revegetate naturally.

(8) Approximately 4 trees 12 to 15-inch DBH to be cut: 3 trees are cedars and 1 is a Doug fir. Trees shall be left on the ground for fire wood. Lop tops and limbs. Lop slash created (trees and limbs smaller than 4-inches in diameter) to 1-foot or less, or chip.

Bear Springs @ McKenzie Butte Road (FA31) SW1/4 Sec. 18, T40N, R3W, MDBM Existing Condition: The pond received maintenance in 2014 but the approach and drainage was recently inspected and noted to be deficient. Overflow drains directly back into the pond; there is no defined parking area or structures to prevent vehicles from backing into the pond.

Specifications (Contractor determines sequence):

SMMU Water Drafting Site Improvements Page 17 of 38

(1) Improve back in/ turn around location as needed to accommodate vehicles. Existing access is possible but requires improvement to allow safe use of the site.

(2) Add a 1-inch plus surface rocking on the vehicle parking site/ turn around area.

(3) Place boulders to prevent vehicles from entering the pond: boulders to be 3-foot minimum diameter with flat face down and/or partially embedded as appropriate to inhibit displacement.

(4) Modify slope around area to prevent any sediment coming off the road into pond and such that excess inflow into the pond flows away and is dispersed back into the woods and eventually the creek channel below the pond.

(5) Armor the area with 6-inch plus rock or permeable pavers that would allow vegetation to grow where drafting hose from trucks will enter the pond. Could be similar design as the outflow structures.

(6) Increase the capacity of the pond. Current capacity is approximately 7,500 gallons; target capacity is 10,000 to 12,500 gallons. Pond may be expanded up to 20-feet to the west to increase the holding capacity.

(7) Place boulders along side of FA31 road to block vehicles from driving into the pond: boulders to be 3-foot minimum diameter with flat face down and/or partially embedded as appropriate to inhibit displacement.

(8) Create drainage along FA31 road to drain away from pond where possible.

(9) Trees to be cut: One 49-inch DBH Douglas Fir shall be cut; seven to ten Port Orford cedar saplings under 4-inch DBH shall be hand cut to prevent the spread of Port Orford cedar root disease; and up to three other hazard trees may be cut if needed for Contractor safety. Trees shall be left on the ground for fire wood. Lop tops and limbs. Lop slash created (trees and limbs smaller than 4-inches in diameter) to 1-foot or less, or chip.

RPMs Be aware of Bear Springs water diversion site off of 41N31 near the bear springs drafting location. There is an intake box on the North side of the road along the spring source. Be sure to protect this feature if while making improvements to the site any actions impact the water diversion.

Tate Creek @ 39N51 SW1/4 Sec. 2, T39N, R1W, MDBM Existing Condition: The access road was recently added to the Forest Transportation system but no improvements have been made for drafting. Overflow from the site drains directly back into the creek.

Reducing the slope down to the existing site may improve pump operation.

Specifications (Contractor determines sequence):

(1) Add rock (1-inch plus) to the road surface approximately 150-feet leading to the designated drafting site.

(2) Block access from road to the creek with large boulders: boulders to be 3-foot minimum diameter with flat face down and/or partially embedded as appropriate to inhibit displacement.

(3) Add native boulder bank reinforcement to armor the creek bank.

(4) Place large boulders as wheel stops to prevent vehicles from entering the Creek: boulders to be 3-foot minimum diameter with flat face down and/or partially embedded as appropriate to inhibit displacement.

(5) Add appropriate geotextile and 3-inch aggregate subgrade.

(6) Perform slope improvement to drain away from creek.

(7) Block unauthorized routes, and stabilize other creek access using native rocks; allow sites to revegetate naturally.

RPMs This site has Burgundy houndstongue (Cynoglossum officinale) and will need to be treated to remove houndstongue prior to work occurring. Forest Service will treat, but shall be given 1-2 days' notice before work is initiated by Contractor at this site.

McCloud River @ Algoma and 39N06 Existing Condition: The existing site pulls up directly adjacent to the McCloud River. Some rock is in place but there is no grading for managing drainage or streamside protections.

Specifications (Contractor determines sequence):

(1) Add rock (1-inch plus) to the road surface leading to the designated drafting site.

SMMU Water Drafting Site Improvements Page 18 of 38

(2) Add native boulder bank reinforcement to armor the creek bank.

(3) Place large boulders to prevent vehicles from entering the Creek: boulders to be 3-foot minimum diameter with flat face down and/or partially embedded as appropriate to inhibit displacement.

(4) Add appropriate geotextile and 3-inch aggregate subgrade.

(5) Perform infiltration improvement for tank overflow by installing a French drain or equivalent system parallel to the river and downslope of parking area (labelled as…

This is the start of the file's text. The full file is on GovTribe.