This document is an amendment to a solicitation for a Ross Draw Project for site preparation. The amendment provides revisions to Section 8 on erosion prevention and control, adds question and answer responses, and includes two additional maps detailing project boundaries, juniper removal and mastication areas, and habitat buffers. Contractors must acknowledge receipt of this amendment by the specified date and time to be considered for the award. The work involves erosion control, soil stabilization, and vegetation management activities to prepare the site located in Arizona for the Ross Draw Project being conducted by the USDA Forest Service.

View the file

Other files for this federal contract opportunity

Other files attached to Ross Draw Project for Site Preparation, newest first.
File Type Posted
Solicitation for Ross Draw Project.pdf PDF
FS SCA 1977-0211.pdf PDF
Schedule of Items - Ross Draw_Attachment D.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)

Company Name:

Address:

(X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A0001

Ref Solicitation No 12970222Q0020 | Ross Draw Project

See attached continuation sheet(s)

USDA Forest Service SPOC Southwest

WASHINGTON DC 20250-0001

1400 Independence Ave SW MS-1138 Washington DC 20250-1138

12970222Q0020

1 4

07/11/2022

06/29/2022 sabrinarucker Highlight sabrinarucker Highlight sabrinarucker Highlight sabrinarucker Highlight sabrinarucker Highlight sabrinarucker Highlight sabrinarucker Highlight

SOLICITATION REVISIONS

This amendment is issued to incorporate the following changes into solicitation number 12970222Q0020.

1) Add: Q&A Responses

2) Revise: Section 8, Entitled Erosion Prevention and Control, of the solicitation.

3) Add: Two (2) additional maps

QUESTIONS & ANSWERS RESPONSES

Section 8, Erosion Prevention and Control is revised in its entirety to read as follows:

When determined by the Forest Service, Contractor shall (1) avoid operating equipment when soil conditions are such that excessive damage will result; (2) construct erosion control structures as needed to control erosion; (3) repair promptly any existing erosion control structures damaged by Contractor's operations; (4) complete seasonal erosion control work prior to suspending operations; and (5) perform other soil erosion control work as may be required under this contract. (6) Contractor shall adjust the kinds and intensity of erosion control work done to ground and weather conditions and the need for controlling runoff.

Erosion control work shall be kept current immediately preceding expected seasonal periods of precipitation or runoff. (7) Resource damage resulting from contractor’s operations due to failure to perform required erosion control work, shall be repaired by the contractor.

PAGE 2 OF 4 PAGES CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED

RFQ NO. 12970222Q0020 - A0001

AZ-260

NA-51

N A C

A

A

E

D

D

M

S

O

K

V

C

P

T

B

B

E

A

C

D

9585D

Project Boundary Heritage Sites-Protection Measures Ephemeral Wash Habitat Buffer Tank Habitat Buffer ±0 0.2 0.4 0.6 0.8

Miles

Ross Draw Treatments and Boundaries

PAGE 3 OF 4 PAGES

AZ-260

NA-51

N A C

A

A

E

D

D

M

S

O

K

V

C

P

T

B

B

E

A

C

D

9585D

Project Boundary Juniper Removal Mastication

Heritage Sites-Protection Measures Ephemeral Wash Habitat Buffer Tank Habitat Buffer ±0 0.2 0.4 0.6 0.8

Miles

Ross Draw Treatments and Boundaries

PAGE 4 OF 4 PAGES

File details come from the government source that posted it. Updated .