About this file
This document is an amendment to a solicitation for the construction of a mezzanine structure inside a storage facility in Parlier, California. The solicitation is being conducted by the Department of Agriculture's Agricultural Research Service Pacific West Area, and seeks to have a contractor construct a self-supporting mezzanine structure within an existing warehouse building. The amendment provides responses to questions from potential offerors, clarifying that no attachment points or connections to the existing building are required for the mezzanine, which will be an independent structure. It also confirms that local permits and inspections are not needed, painting of the mezzanine is not required, and that the space below the mezzanine staircase can be used for additional storage. Photos of the warehouse interior and intended installation location are provided. No changes are made to the response date or other contractual terms.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Mezzanie Site Walk Sign In Sheet.pdf | ||
| Attachment 3 Contractor RFI FORM.pdf | ||
| Attachment 3 Contractor RFI FORM.pdf | ||
| Attachment 4 - ARS-371 - CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE.pdf | ||
| Attachment 5 - ARS-372 - CONTRACTOR REQUEST FOR PAYMENT TRANSMITTAL.pdf | ||
| 12905B23Q0107 - RFQ - Construction.pdf | ||
| Attachment 1 - Statement of Work.pdf | ||
| Attachment 2 - Davis-Bacon Act WD Number CA20230018.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12905B23Q0107 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ARS-12905B
ALBANY CA 94710
800 BUCHANAN STREET
USDA ARS PWA AAO ACQ/PER PROP
06/26/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/26/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Q: Will there be any attachment points from the new Mezzanine Structure to the existing
Warehouse Building. If so is there any details available.
A: There will be no attachment points from the Mezzanine to the existing building. The mezzanine will be a self-standing structure.
Q: There is some concern of lateral stability of the proposed structure without any cross bracing or connection to existing structures.
A: The concern has to be addressed by your engineer team.
Q: Will contractor be required to provide CAD Format As-builts of the Mezzanine Structure?
A: CAD Format is not necessary
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
LAM V. PHAM
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12905B23Q0107/0001
Q: Will contractor be allow to store building materials within he Warehouse Structure?
A: Yes
Q: Will any local permit / inspections be required?
A: No
Q: Will the mezzanine structure be required to be painted?
A: No
Q: Reference Modeling below, there will be quite a bit of space below the staircase and landing, will this need to be accessible for additional storage?
A: Yes, if possible.
Q: Is there any current electrical or plumbing that will have to be relocated.
A: No
Q: Can you provide photos of the location of where mezzanine shall be installed?
A: See photos below. The mezzanine will be installed on the area shown on the first three photos. The fourth photo is the entrance.
Q: Will the mezzanine rest on post or will walls be required to support the decking?
A: The mezzanine will be a self-standing structure. There are no walls or columns to attach to. See photos attached.
Q: Please advise the height of the mezzanine.
A: Standard 2X6 wall studs¿ height with necessary top and bottom plates needed for wall framing.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
| Sol_12905B23Q0107_Amd_0001 |
| 1 |
| 2 |
| 3 |
| 4 |
File details come from the government source that posted it. Updated .