Attachment_J-_2_Yankee_Meadows_Specs_Final.docx
DOCX document 257 KB Posted
- Attached to
- Yankee Meadows Campground Reconstruction Federal contract opportunity
- Solicitation number
- 1284N819R0004
About this file
Attachment J- 2 Yankee Meadows Specs Final
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Scanned_Amendment_01.pdf | ||
| Attachment_J-6_-_SF25A_Payment_Bond_expires_07312019.pdf | ||
| Attachment_J-_3a_-_Yankee_Meadows_Dwg_Final.pdf | ||
| Solicitation_1284N819R0004.docx | DOCX document | |
| Attachment_J-8_-_SF24_Bid_Bond.rtf | RTF text file | |
| Attachment_J-_1_Wage_Rate_Determination.docx | DOCX document | |
| Attachment_J-5_-_SF25_Performance_Bond_expires_07312019.pdf | ||
| Attachment_J-4_-_Subcontractor_Form_SF1413.pdf | ||
| Attachment_J-7_-_Representation_by_Corporations.docx | DOCX document | |
| Attachment_J-_3b_-_Yankee_Meadows_Drawing_Cover_Sheet_with_original_signatures.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J- 2 – Specifications Project: Yankee Meadow Campground Reconstruction (Cedar City RD, Dixie NF)
Section C - Description/Specifications/Statement of Work
GENERAL SPECIFICATIONS
YANKEE MEADOW CAMPGROUND RECONSTRUCTION
Final – 12/14/2018
SCOPE OF CONTRACT
The Yankee Meadow Campground was burned over during the 2017 Brian Head fire. This project consists of reconstructing portions of the campground to repair damage caused by the fire, as well as other improvements. The work associated with this project includes:
Base Bid:
Demolition:
Obliterating existing roads that are to be removed.
Campground:
Realigning and reconstructing portions of the existing aggregate roadway and campground spurs Constructing new aggregate roadways, parking areas, and campground spurs, including culverts Constructing new campground sites, including all new site furniture, for single, double and group campsites Constructing improvements to the existing water system Constructing improvements to the host sewer system Constructing a new propane system for the host Optional bid items:
Removal and disposal of existing structures and obstructions (Exception: road obliteration included in base) Furnishing and installing shade structures for single units and group sites Furnishing and installing new double-unit vault comfort station Furnishing and installing tent pads for single and double units Relocating existing interpretive panels Furnishing and installing all signs, including regulatory, directional and site ID signs Furnishing and installing barrier rocks and concrete curb stops Work to be completed by others (Not in Contract):
Removing and reinstalling the existing road closure gate Removing the existing fence and constructing a new fence Quantities associated with these options are identified in the Schedule of Items.
PROJECT LOCATION
The project is located on the Dixie National Forest on the Cedar City Ranger District, Iron County, Utah, it is located approximately 5 miles South and 3-1/2 miles East of Parowan, Utah (approximately 10 miles by road from Parowan). Latitude: 37.759043°, Longitude: -112.758435°. Driving directions from Parowan: Drive South on highway 143 for approx. 3 miles. Turn left onto Bowery Creek Road. Road becomes Forest Road 049. Campground is on the left.
PIT LOCATIONS:
Crushed Aggregate Pit - Parowan: Latitude: 37.851097, Longitude: -112.819612.
Select Borrow Pit – FSR 049: Latitude: 37.797969, Longitude: -112.800916.
SITE INFORMATION AND LIMITATIONS
The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
Construction sites will be closed to the public during construction. The Forest Service will issue a closure order to the public. The Contractor will be responsible for signing and limiting public access.
Contractor will provide all materials and labor necessary to protect streams, wet or dry, during construction activities. The Contractor will be required to submit a stream protection plan and receive approval from the COR, in writing, prior to the beginning of construction.
All construction equipment shall be pressure washed before entering National Forest System lands. The removal of mud and debris from treds, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations.
Water is not available at the site for construction purposes.
Toilet facilities are available at the site.
TRAFFIC CONTROL AND CONSTRUCTION SIGNING
No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the COR and Utah Department of Transportation. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.
WORK CAMPS, STAGING AND STORAGE AREAS
Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage work trailers on site.
No overnight camping will be allowed on site.
INSPECTION OF WORKSITE
The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
START DATE
Spring 2019.
CONTRACT TIME
Base Bid: 150 Calendar Days Optional Items: Period of Performance to be negotiated at the time of Option Item(s) award. It is anticipated that work on option items will take place concurrently with base bid award work, with work on base and option item(s) completed by October 1, 2020.
SPECIFICATIONS
The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to, or are included in payment for other pay items in this contract. These items are considered incidental and no additional compensation will be made.
Section 010250 - Construction Staking Section 011250 - Measurement And Payment Section 011900 - Mobilization Section 013300 - Submittal Procedures Section 014100 - Quality Control Section 022340 - Obliteration Of Old Roadways And Parking Spurs Section 023701 - Sediment And Erosion Control Measures Section 024100 - Waste Material Disposal Section 024102 - Removal And Disposal Of Structures And Obstructions Section 026460 - Colored Concrete Dumpster Pad Section 033000 - Cast-In-Place Concrete Section 033020 - Concrete From Packaged Dry Mix For Minor Structures Section 053000 - Sheet Metal Roofing Section 099100 - Painting Section 099600 - High-Performance Coatings For Water Storage Tank Section 101110 - Three Panel Bulletin Board Section 101400 - Signs Section 101415 - Site Identification Sign (Hdpe) Section 129400 - Family Unit And Site Furnishings Section 129410 - Group Site And Site Furnishings Section 129700 - Fee Tube Section 131110 - Pedestrian Timber Stairway Section 132700 - Precast Concrete Vault Restrooms Section 136000 - Pre-Manufactured Shelter Section 221100 - Water Distribution Systems Section 221102 - Curb Valves And Boxes Section 221105 - Water Hydrants Section 221300 - Onsite Wastewater Treatment Systems Section 231126 - Facility Liquefied-Petroleum Gas Piping Section 311000 - Clearing And Grubbing Section 312000 - Earthwork Section 312010 - Select Borrow Section 312100 - Project Site Preparation And Grading Section 312225 - Excavation & Embankment Section 321204 - Crushed Aggregate Base Or Surface Course Section 322100 - Tent Pads Section 322205 - Barrier Rocks Section 322622 - Precast Colored Concrete Wheel Stops Section 329206 - Seeding Section 332228 - Culvert Pipe And Pipe Arches
END OF SECTION C
February 2019
FINAL 12/14/2018
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-4
USDA FOREST SERVICE, R4
YANKEE MEADOW CAMPGROUND RECONSTRUCTION
SECTION 010250 - CONSTRUCTION STAKING
1. GENERAL
0.1 SUMMARY
A. This work shall consist of the construction staking of roads, parking lots, parking spurs, family units, tent pads, paths, stairways, culverts, buildings, and utilities in accordance with the Drawings and Specifications. The work includes the furnishing of all labor, equipment, instruments, materials, transportation and other incidentals necessary to complete the construction staking in accordance with these specifications and acceptable engineering practice.
0.2 QUALITY CONTROL
A. Construction staking shall be accomplished under the direction of a Civil Engineer, Engineering Technician, or Land Surveyor closely associated and familiar with construction staking; periodic visits to the project site are required.
0.3 MEASUREMENT AND PAYMENT
A. Measurement shall be lump sum for surveying and staking the project through all phases of construction.
PART 1 - PRODUCTS
1.1 GOVERNMENT-FURNISHED SURVEY CONTROL SHEETS
A. The Government will provide the contractor with a set of survey control sheets showing horizontal and vertical control for site to be staked. The Government will provide the Contractor with layout information that will include:
1. Control Points - Northing, Easting, Existing Elevations.
2. Roads, Spurs, Parking Areas - Northing, Easting, and Finish Elevations for centerline and edge of roads, spurs, parking areas.
STAKED BY THE CONTRACTOR
The following items shall be staked by the contractor and approved by the Contracting Officer. CAD drawings are available from the Government upon request:
3. Pathways.
4. Buildings and Other Structures.
5. Campsite (Family, Group) Units and Tent Pads.
6. Utility Lines and Related Objects and Structures.
1.2 STAKES
A. Identification stakes and hubs shall be of sufficient length and width to provide a solid set in the ground and to provide space for marking above ground when applicable. Other dimensions and materials may be used, such as steel reinforcing bars, wire flagging and markers, and metal pins, if approved in writing by the Contracting Officer (CO). The top 2 inches of all slope, guard, reference, clearing, and structure stakes shall be painted or marked with plastic flagging. Colors used on stakes or for flagging shall be as follows:
| 1. Roads, parking lots, and parking spurs | -Orange | ||||
| 2. Waterlines, utilities, and culverts | -Blue | ||||
| 3. Family Units, group units, stairs, and paths | -Red | ||||
| 4. Buildings, excavation and grading | -Yellow | ||||
| 5. Tent pads | -Blue/White Striped |
1.3 SURVEY NOTE PAPER AND BOOKS
A. Paper for survey notes shall be moisture-resistant paper. Notes shall be contained in books with covers that will protect the contents and retain the pages in numerical sequence during field use. Field notebooks or note paper shall be furnished by the contractor.
PART 2 - EXECUTION
2.1 GENERAL
A. The Contractor shall be required to provide all necessary staking and control for all phases of construction. The contractor shall use the data and information shown on the project drawings to establish the location of all facilities to be constructed under this contract. The Contractor may choose any method of establishing horizontal and vertical controls provided the following minimum precision and accuracy requirements are met.
B. Accuracy requirements:
1. Minimum position close; 1/1000
2. Vertical closure: 0.05 ft (vertical)/station (100 feet horizontal)
3. Cross section and slope stake precision:
a. Allowable deviation of cross section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves: +/-3 degrees.
b. Cross section topography measurements shall be taken so that variations in ground form a straight line connecting the cross section points will not exceed: 1.0 ft.
c. Horizontal and vertical accuracy for slope stake, slope stake references, and clearing limits. In feet or percentage of horizontal distance measured form centerline or reference stake, whichever is greater. Slope reference stakes and slope stakes: 0.15 ft or 0.6%. Clearing limits: 1.0 ft.
2.2 ESTABLISHING AND REFERENCING IMPROVEMENT LOCATIONS
A. Access Roads, Parking Spurs, and Parking lots:
1. Slope stakes (cut and fill catch points), clearing limits, and slope stake references shall be established on both sides of the centerline at each station established. Slope stakes and slope stake references shall be located on a line at right angles to tangents and on radial lines or curves. Slope stake catch points shall be located by using the grading plans and/or profiles, typical road section templates, as shown on the drawings and the information provided with staking points.
2. Slope stakes shall be set at 50-foot intervals, at significant breaks in the ground profile, culvert locations, and widening transition points. Slope stakes shall be set at 25 foot intervals around curves having a radius less than 100 feet.
B. Group Units, Family Units and tent Pads
1. Slope stakes shall be established at the corners of family units. Slope stakes shall be written to reference the finish grade of the unit or pad being staked.
C. Paths and Trails
1. Slope stakes (cut and fill catch points), clearing limits, and slope stake references shall be established on both sides of the centerline at each station established. Slope stakes and slope stake references shall be located on a line at right angles to tangents and on radial lines or curves. Slope stake catch points shall be located by using the grading plans and/or profiles, and typical path and trail section templates as shown on the drawings.
2. Slope stakes shall be set at 10-foot intervals, at significant breaks in the ground profile, culvert locations, and widening transition points.
D. Culverts
1. Slope stakes and slope reference stakes shall be set at all culvert locations. A culvert reference stake and hub shall be set on the centerline of the culvert 10 feet from each end or beyond the clearing limit, which ever is greater. The following shall be recorded on these stakes:
a. The actual field measured length
b. The vertical and horizontal distance from hubs to the invert at the ends of the culvert.
E. Waterline, Sewerline, & other Utilities
1. Waterline, Sewerline, & other Utilities shall be staked at the locations shown on the drawings with the specified minimum burial depth. Waterline and sewerline elevations shall be accurately staked to provide for drainage as indicated on the drawings. Grade stakes shall be established as necessary to provide the control for the construction work.
F. Buildings
1. Slope stakes and slope stake references shall be established at each corner and as necessary to provide adequate construction control.
2.3 DISCREPANCIES
A. The contractor shall compare the staked centerline horizontal and vertical alignment with the design data. Differences between previously recorded and observed elevations of bench marks shall be referred to the Contracting Officer. Differences in centerline profile elevations exceeding 1 foot at any two or more consecutive points shall be reported to the contracting Officer for evaluation and possible revision. Staking of these areas shall be deferred until the Contacting Officer resolves these differences.
2.4 VERTICAL CONTROL
A. Vertical control for construction shall be as referenced on the Drawings.
2.5 MARKING STAKES
A. All stakes shall be legibly marked, in the format agreed upon with the Contracting Officer, with a stake pencil that leaves an imprinted or with waterproof ink. Marking shall conform to the nomenclature below;
| PI | Point of Intersection of tangents | |
| PC | Point of curvature | |
| POC | Point on curve | |
| Pt | Point of tangency | |
| POT | Point on tangent | |
| RP | Reference point | |
| P | P-line (preliminary location line) | |
| L | L-line (final location line) | |
| BM | Bench mark | |
| TBM | Temporary bench mark | |
| BT | Begin taper (any) | |
| ET | End taper (any) | |
| C | Cut | |
| F | Fill | |
| L | Centerline | |
| D | Ditch | |
| W | Width |
2.6 SURVEY NOTES
A. All survey data shall be neatly recorded in survey books. All survey notes shall become the property of the Forest Service. Errors shall be deleted by lining out. Date, crew names and positions, instrumentation, and weather shall be recorded in the notes at the beginning of each day’s work. The party chief shall sign or initial each page of the notes immediately after the last entry for each day’s work.
B. Electronically recorded survey notes shall be consecutively numbered and headed to identify the contents. The notes shall be supported and accompanied by a bound book that records the project name and for each day identifies date, crew names and positions, instrumentation, weather, type of survey, stationing of sections between which survey was performed, and survey data or sketched that cannot be electronically recorded. The party chief shall sign or initial the electronically recorded notes and Day Book immediately after the last entry for each day’s work.
END OF SECTION 010250
CONSTRUCTION STAKING 010250-5
USDA FOREST SERVICE, R4
YANKEE MEADOW CAMPGROUND RECONSTRUCTION
SECTION 011250 - MEASUREMENT AND PAYMENT
1. GENERAL
3.1 SUMMARY
A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.
B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.
3.2 DETERMINATION OF QUANTITIES
A. The following measurements and calculations shall be used to determine contract quantities for payment.
1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.
2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.
3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.
4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.
5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.
6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.
B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."
3.3 UNITS OF MEASUREMENT
A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:
1. Acre: Make longitudinal and transverse measurements for area computations horizontally.
2. 50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.
3. 94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.
4. Cubic Yard (CY): A measurement computed by one of the following methods:
a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.
b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.
c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
5. Each (EA): One complete unit, which may consist of one or more parts.
6. Gallons (GAL): The quantity shall be measured by any of the following methods:
a. Measured volume in container.
b. Metered volume by approved metering system.
c. Commercially package volume.
7. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.
8. Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps.
9. Lump Sum (LS): One complete unit.
10. Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.
11. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.
12. Square Foot (SF): Measured on a plane parallel to the surface being measured.
13. Square Yard (SY): Measured on a plane parallel to the surface being measured.
14. Ton: Measured as a short ton consisting of 2,000 pounds.
3.4 METHOD OF MEASUREMENT
A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:
1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.
2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:
a. As a result of changes in the work authorized by the CO.
b. As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.
c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.
4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.
5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.
PART 4 - PRODUCTS (NOT APPLICABLE)
PART 5 - EXECUTION (NOT APPLICABLE)
END OF SECTION 011250
MEASUREMENT AND PAYMENT 011250-3
YANKEE MEADOW CAMPGROUND RECONSTRUCTION
SECTION 011900 - MOBILIZATION
1. GENERAL
6.1 SUMMARY
A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.
6.2 MEASUREMENT AND PAYMENT
A. The measurement shall be lump sum for mobilization. Payment shall be as follows:
1. Bond premiums will be reimbursed after receipt of the evidence of payment.
2. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.
3. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.
4. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.
5. Progress payments for mobilization and preparatory work shall be subject to retainage.
PART 7 - PRODUCTS (NOT USED)
PART 8 - EXECUTION (NOT USED)
END OF SECTION 011900
MOBILIZATION 011900-1
YANKEE MEADOW CAMPGROUND RECONSTRUCTION
SECTION 013300 - SUBMITTAL PROCEDURES
1. GENERAL
9.1 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.
B. See other specification section within this package for additional requirements on submittal.
9.2 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Allow 14 days for processing each re-submittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
C. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. If more than one item is shown on submittal sheet, identify item.
D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
9.3 MEASUREMENT AND PAYMENT
A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.
PART 10 - PRODUCTS
10.1 ACTION SUBMITTALS – (Submittals requiring CO approval)
A. General: Prepare and submit Action Submittals required by individual Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
g. Compliance with recognized testing agency standards.
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Include the following information, as applicable:
a. Dimensions.
b. Identification of products.
c. Fabrication and installation drawings.
d. Roughing-in and setting diagrams.
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.
f. Notation of dimensions established by field measurement.
2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
D. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.
E. Samples: Prepare physical units of materials or products, including the following:
1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
10.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval) A. General: Prepare and submit Informational Submittals required by other Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.
2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."
B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.
D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.
E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.
PART 11 - EXECUTION
11.1 GENERAL
A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.
F. Requests for substitutions will only be considered if contractor submits the following:
1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.
2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.
3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.
4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.
11.2 SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:
TABLE 013000-1
| Spec. Section |
| Section Title |
| Subsection |
| Required Submittal |
| C |
| General Specifications |
| 1.3A |
| Stream Protection Plan |
| C |
| General Specifications |
| 1.4A |
| Traffic Control Plan |
| 010250 |
| Construction Staking |
| 3.6 A |
| Survey Notes |
| 013300 |
| Submittal Procedures |
| 2.1D |
| Construction Schedule |
| 014100 |
| Quality Control |
| 1.3 A |
| Contractor quality control plan |
| 014100 |
| Quality Control |
| 1.3 B |
| Permits, Licenses, and Certificates |
| 014100 |
| Quality Control |
| 1.3 C |
| Test and inspection reports |
| 014100 |
| Quality Control |
| 1.3 D |
| As-Built drawings |
| 023701 |
| Sediment & Erosion Control Measures |
| 1.2A |
| Sediment & Erosion Control Plan |
| 033000 |
| Cast-in-Place Concrete |
| 1.3A |
| Product Data |
| 033000 |
| Cast-in-Place Concrete |
| 1.3B |
| Design Mix |
| 033000 |
| Cast-in-Place Concrete |
| 1.3C |
| Shop Drawings |
| 033000 |
| Cast-in-Place Concrete |
| 1.3D |
| Test Reports |
| 053000 |
| Sheet Metal Roofing |
| 1.3A |
| Color Selection Samples |
| 099100 |
| Painting |
| 1.4A |
| Color Selection Samples |
| 099600 |
| High Performance Coatings |
| 1.3A |
| Product Data |
| 101400 |
| Signs |
| 1.2A |
| Sign List Submittal |
| 101415 |
| Site Identification Sign (HDPE) |
| 1.3A |
| Sample Sign Mock-Up |
| 129400 |
| Family Units |
| 1.2A |
| Product Data |
| 129400 |
| Family Units |
| 1.2B |
| Color Samples |
| 129410 |
| Site Furnishings |
| 1.2A |
| Product Data |
| 132700 |
| Precast Concrete Vault Restrooms |
| 1.2A |
| Manufacturer’s Literature |
| 132700 |
| Precast Concrete Vault Restrooms |
| 1.2B |
| Shop Drawings |
| 132700 |
| Precast Concrete Vault Restrooms |
| 1.2C |
| Design Calculations |
| 132700 |
| Precast Concrete Vault Restrooms |
| 1.2D |
| Concrete Delivery Certificates |
| 136000 |
| Shelter |
| 1.2A |
| Shop Drawings |
| 221100 |
| Water Distribution Systems |
| 1.3A |
| Product Data |
| 221100 |
| Water Distribution Systems |
| 1.3B |
| Water Disposal Plan |
| 221100 |
| Water Distribution Systems |
| 1.3C |
| Operation and Maintenance Data |
| 221105 |
| Water Hydrants |
| 1.3A |
| Manufacturer’s Literature and Maintenance Data |
| 221105 |
| Water Hydrants |
| 1.3B |
| Washed Rock Certification |
| 221105 |
| Water Hydrants |
| 1.3C |
| Maintenance Data |
| 221105 |
| Water Hydrants |
| 1.3D |
| Color Sample |
| 221300 |
| Onsite Wastewater Treatment System |
| 1.3A |
| Product Data |
| 221300 |
| Onsite Wastewater Treatment System |
| 1.3B |
| Coordination Drawings |
| 231126 |
| Fac. Liquefied-Petroleum Gas Piping |
| 1.4A |
| Product Data |
| 231126 |
| Fac. Liquefied-Petroleum Gas Piping |
| 1.4B |
| Shop Drawings |
| 231126 |
| Fac. Liquefied-Petroleum Gas Piping |
| 1.4C |
| Pipe Sizing Calculations |
| 231126 |
| Fac. Liquefied-Petroleum Gas Piping |
| 1.4D |
| Field Quality Control Reports |
| 231126 |
| Fac. Liquefied-Petroleum Gas Piping |
| 1.4E |
| Operation and Maintenance Data |
| 312000 |
| Earthwork |
| 1.3A |
| Bedding and Backfill Certification |
| 312000 |
| Earthwork |
| 1.3A |
| Sieve Analysis |
| 312225 |
| Excavation and Embankment |
| 1.3A |
| Density Test Results |
| 321204 |
| Crushed Aggregate Base or Surface Course |
| 1.2A |
| Compaction Test Results and Proctor |
| 322622 |
| Precast Colored Concrete Wheel Stops |
| 2.1B |
| Certificate of Conformance – Concrete Curb |
| 332228 |
| Culvert Pipe and Pipe Arches |
| 1.3A |
| Shop Drawings |
| 332228 |
| Culvert Pipe and Pipe Arches |
| 1.3B |
| Fabricator’s Certification |
END OF SECTION 013300
SUBMITTAL PROCEDURES 013300-6
YANKEE MEADOW CAMPGROUND RECONSTRUCTION
SECTION 014100 - QUALITY CONTROL
1. GENERAL
12.1 This work shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.
12.2 QUALITY CONTROL
A. The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all services, supplies, and construction conform to the contract requirements.
B. Special Tests and Inspections: Contractor will engage a testing agency to conduct required special tests and inspections. The Contractor shall authorize the testing agency to perform the required testing and inspections on the work completed. The authority shall include:
1. Testing agency will interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.
2. Testing agency will re-test and re-inspect corrected work.
C. Retesting/Reinspecting: Contractor shall provide quality-control services for retesting and reinspection for replaced construction work or for work that failed to comply with the requirements under the contract.
12.3 SUBMITTALS
A. Contractor Quality Control Plan B. Permits, Licenses, and Certificates C. Test and Inspection Reports D. As-Built Drawings
12.4 MEASUREMENT AND PAYMENT
A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.
PART 13 - PRODUCTS (Not Applicable)
PART 14 - EXECUTION
14.1 QUALITY CONTROL SYSTEM
A. General: Perform required testing, inspections, sampling, and similar services per direction specified in the contract drawings and specifications and in accordance with established industry standards.
14.2 CONTRACTOR QUALITY CONTROL PLAN
A. At the time of the preconstruction conference, the Contractor shall submit for approval a written Contractor Quality Control Plan.
1. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.
2. The Government reserves the right to require changes in the plan during the contract period as necessary.
3. No change in the approved plan may be made without written concurrence by the Contracting Officer.
4. At a minimum, the plan shall include the following:
a. A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.
b. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.
c. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.
d. Methods of performing, documenting, and enforcing quality control of all work.
e. Methods of monitoring and controlling environmental pollution and contamination as required by all applicable regulations and laws.
14.3 TEST AND INSPECTION REPORTS
A. Submit three copies of complete test results no later than three calendar days after the test was performed.
B. Submit failing test results and proposed remedial actions within four hours of noted deficiency.
C. Testing and Inspection Reports shall include the following:
1. Date of issue.
2. Project title and number.
3. Name, address, and telephone number of testing agency.
4. Dates and locations of samples, tests, or inspections.
5. Names of individuals performing tests and inspections.
6. Reference Specification Section(s).
7. Complete test or inspection data.
8. Test and inspection results and an interpretation of test results.
9. Ambient conditions at time sample was taken, tested, or inspected.
10. Comments or professional opinion on whether tested or inspected work complies with the Contract Document requirements.
11. Name and signature of laboratory inspector.
12. Recommendations on retesting and reinspecting.
14.4 PERMITS, LICENSES, AND CERTIFICATES
A. For Contracting Officer’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.
14.5 AS-BUILT DRAWINGS
A. The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from the original contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Contracting Officer.
14.6 SAMPLING, TESTING, AND CERTIFICATION REQUIREMENTS
A. Sampling, testing, and Certification requirements and frequency for specific items shall be as specified in the drawings and specification. The following table is a summary of the required sampling, testing, and certification for the project - the table is to assist the Contractor, but may not be all inclusive – additional submittals may be required by specific specification section:
B.
TABLE 014100-1
Item
Subsection Certification or Test Required
Frequency
| 033000 |
| 2.13 |
| Mixing and Delivery |
| Each Truck |
| 033000 |
| 3.13 |
| Concrete – Slump, Air, Temperature |
| 1 composite per truck load delivered |
| 033000 |
| 3.13 |
| Concrete - Compression Test Specimens |
| at 7 days and 28 days (see spec) |
| 221100 |
| 3.2N |
| HDPE Pipe - Bent Strap Test |
| Once Daily |
| 221100 |
| 3.5A |
| Hydrostatic Testing of Water System |
| See Spec. |
| 221100 |
| 3.5B |
| Pressure and Leakage Test – Water Line |
| See Spec. |
| 221100 |
| 3.6A |
| Bacteriological Examination |
| After disinfection, before use |
| 221300 |
| 3.8A |
| Leak Test |
| Prior to Backfill |
| 312000 |
| 3.14C |
| Compaction Test – at Pipe Zone |
| One per 600 Feet of Trench |
| 312000 |
| 3.14C |
| Compaction Test – at Pipe Zone |
| One test – at each road crossing |
| 312000 |
| 3.14D |
| Compaction Test – above Pipe Zone |
| One per 600 Feet of Trench |
| 312000 |
| 3.14D |
| Compaction Test – above Pipe Zone |
| One test every other lift – at each road crossing |
| 312000 |
| 3.14I |
| Tracer Wire Conductivity Test |
| Until Passing |
| 312000 |
| 3.17A |
| Compaction Test – Backfill/Fills |
| One per Vault Toilet |
| 312000 |
| 3.17A |
| Compaction Test – Backfill/Fills |
| 1 per slab |
| 312225 |
| 3.12B |
| Moisture-Density Relationship |
| One Test for Each Soil Type Encountered |
| 312225 |
| 3.12B |
| Compaction – Road Embankment (Method 4) |
| One test every 300 sq. yd. of embankment per lift |
| 312225 |
| 3.12B |
| Compaction – Subgrade |
| One test every 1000 sq. yd. of subgrade |
| 321204 |
| 3.4A |
| Compaction Tests – Road Base and Surface Course |
| One test for every 300 sq. yd. of |
aggregate
| 321204 |
| 3.4A |
| Compaction Tests – Aggregate Base for Concrete Slabs |
| One test for each family unit or group area |
| 321204 |
| 3.4A |
| Compaction Tests – Aggregate Base for Concrete Slabs |
| One test for each prefabricated building pad |
| 332228 |
| 3.7C |
| Compaction Tests |
| One test for every 12 inches of lift placed |
END OF SECTION 014100
QUALITY CONTROL 014100-2
YANKEE MEADOW CAMPGROUND RECONSTRUCTION
SECTION 022340 - OBLITERATION OF OLD ROADWAYS AND PARKING SPURS
1. GENERAL
15.1 This item shall consist of obliteration and work to prevent erosion and encourage revegetation, in accordance with these specifications, of such old roadways or areas as are indicated on the drawings or designated on the ground for obliteration.
15.2 MEASUREMENT AND PAYMENT
A. There will be no separate measurement or payment for work in this Section. Payment will be included in the contract unit price as shown on the Schedule of Items.
PART 16 - PRODUCTS
A. NOT APPLICABLE
PART 17 - EXECUTION
17.1 GENERAL
A. The obliteration of old roadways shall consist of rough grading when needed, ripping or scarifying, cross ditching, and opening drainages. The work shall not commence until after the designated sections are no longer needed to serve traffic.
17.2 ROUGH GRADING
A. Rough grading shall consist of filling the existing ditch (if applicable) and rough out sloping of the roadway. The old road shoulder shall be roughly broken down to present a more natural appearance.
17.3 RIPPING
A. After the rough grading has been completed, the area of the old roadway shall then be ripped, scarified or plowed to a minimum 6 inch depth at maximum 16 inch intervals and left in a condition suitable for reseeding, or to encourage natural revegetation.
17.4 DRAINAGES
A. Live streams and other drainages shall be opened by removing the old structures and grading the approach fills so that they will in no way impair the flow in the channel. Materials with salvage value shall be carefully removed as directed by the Contracting Officer.
END OF SECTION 022340
OBLITERATION OF OLD ROADWAYS AND PARKING SPURS 022340-1
YANKEE MEADOW CAMPGROUND RECONSTRUCTION
SECTION 023701 - SEDIMENT AND EROSION CONTROL MEASURES
1. GENERAL
18.1 The work under this section consists of furnishing all necessary labor, equipment, materials, and performing all operations in connection with construction sediment and control measures.
A. General
1. All erosion and sediment control measures are to be placed prior to any disturbance caused by grading and or excavation and shall conform to the requirements of the appropriate regulatory agency for the State.
2. The Contractor shall be solely responsible for ensuring that erosion and sediment control measures are implemented and maintained at the site.
3. Soil disturbing activities include but are not limited to: Clearing and grubbing, excavation for utilities and foundations, roadway and parking lot construction, construction or modification of site drainage, grading, and preparation for final seeding.
18.2 SUBMITTALS
A. The Contractor shall be required to submit a sediment and erosion control plan in accordance with this specification for approval by the Contracting Officer 2 weeks prior to start of work.
18.3 PERMITS
A. The Contractor shall apply for and pay for a National Pollutant Discharge Elimination System (NPDES) permit from the state the project resides in.
18.4 MEASUREMENT AND PAYMENT
A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.
PART 19 - PRODUCTS
19.1 SYNTHETIC FILTER FABRIC FOR SILT FENCES.
A. Pervious sheet of polypropylene, nylon, or polyethylene fabric conforming to the following physical and hydraulic characteristics:
| · Physical Properties (Min.) |
| Requirement |
| Test Method |
| · Grab Tensile, lbs. |
| W120/F100 |
| ASTM-D-4632 |
| · Grab Elongation, % |
| 15 |
| ASTM-D-4632 |
| · Mullen Burst, psi |
| 275 |
| ASTM-D-3786 |
| · Puncture, lbs. |
| 65 |
| ASTM-D-4833 |
| · Trapezoidal Tear, lbs. |
| 50 |
| ASTM-D-4533 |
| · UV Resistance, % |
| 80 |
| ASTM-D-4355 |
| · AOS, US Sieve # |
| 30/40 |
| ASTM-D-4751 |
| · Permittivity gal/min-sq. ft. |
| 90 |
| ASTM-D-4491 |
B. Filter fabric should contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 120 F.
C. Support Posts: 4 foot - 2 x 2 wood.
19.2 STRAW BALES
A. Oat or wheat straw, free from weeds, viable weed seeds, foreign matter detrimental to plant life, and dry.
1. Grass hay bales are not acceptable.
2. In order to prevent deterioration of the bindings, all bales shall be either wire-bound or string-tied so that bindings are oriented around the sides rather than along the tops and bottoms of the bales.
19.3 STRAW WATTLES OR ROLLS
A. Furnish straw wattles or rolls that are manufactured from weed free straw and wrapped in a tubular photodegradable plastic netting made from 85% high density polyethylene, 14% ethyl vinyl acetate and 1% color for UV inhibition. Conform to the following:
| 1. Diameter | 9 inches min. | |||
| 2. Netting strand thickness | 0.030 inches | |||
| 3. Netting knot thickness | 0.055 inches | |||
| 4. Mass of netting | 0.315 to 0.385 ounces per foot |
PART 20 - EXECUTION
20.1 CONSTRUCTION
A. Install straw bales at local drainage ways to prevent silt intrusion upon adjacent drainage courses. Remove straw bales following establishment of vegetation cover and utilize as mulch at swales or on steep slopes.
B. Prior to construction, install silt fence along the downhill construction limits to prevent silt intrusion upon adjacent land.
C. Install sediment and erosion control measures on the down slope toe of all top soil stock piles.
D. Maintain and remove all erosion controls as specified.
E. Temporary seeding shall be placed on exposed surfaces that will not be brought to final grading or permanent cover treatment within 30 days of the exposure to reduce erosion and sedimentation by stabilizing exposed soils. Seeded areas shall be checked regularly for bare spots, washouts, and healthy growth to assure that a good stand of grass is being maintained. Reseed areas that fail to establish vegetation cover as soon as such areas are identified.
20.2 DUST CONTROL
A. In areas subject to surface and air movement of dust, where on-site or off-site damage is likely to occur, one or more of the following preventive measures shall be taken for dust control:
1. Minimize the period of soil exposure through the use of temporary ground cover and other temporary stabilization practices.
2. Sprinkle the site with water until surface is wet. Repeat as needed.
20.3 SILT FENCE
A. Silt fences are appropriate for the following general locations:
1. Immediately upstream of the point(s) of runoff discharge from a site before flow becomes concentrated. Below disturbed areas where runoff may occur in the form of overland flow.
2. Along the down slope toe of all top soil stock…
This is the start of the file's text. The full file is on GovTribe.