QuillStewardship_AppendixD.pdf
PDF 4 MB Posted
- Attached to
- Quill Stewardship Federal contract opportunity
- Solicitation number
- 1282MK19R4001
About this file
Appendix D
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1282MK19R4001_Amend1.pdf | ||
| Updated_Attachment_1_-_Quill_LoggingPlan.pdf | ||
| QuillStewardship_AppendixB.docx | DOCX document | |
| Attachment_3_-_Wage_Determination_WY190040.pdf | ||
| 1282MK19R4001.pdf | ||
| QuillStewardship_AppendixA.docx | DOCX document | |
| Attachment_2_-_Wage_Determination_1979-0948.pdf | ||
| Attachment_1_-_Quill_LoggingPlan.pdf | ||
| QuillStewardship_AppendixB.docx | DOCX document | |
| QuillStewardship_AppendixC.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quill Stewardship Roads
Medicine Wheel Ranger District
Big Horn County, Wyoming
Appendix D
Quill Stewardship Bighorn National Forest
1282MK19R4001
Quill Stewardship Bighorn National Forest
* INDEX *
TITLE PAGE (S)
COVER SHEET 1
SIGNATURE SHEET 2
INDEX 3
FOREST LOCATION MAP 4
PROJECT LOCATION MAP 5
SPECIFIED ROAD LIST 6
PROJECT NOTES 7
SUMMARY OF QUANTITIES 8
SCHEDULE OF ITEMS 9
DRAWINGS
ROLLING DIP 10
AGGREGATE SURFACING 11
ROAD RECONDITIONING 12
CONSTRUCTION SIGNS 13
TYPE II (POWDER RIVER) ROAD CLOSURE GATE 14
` TEMPORARY TRAFFIC CONTROL 15
DESCRIPTION OF WORK 16-17
SPECIFICATIONS
SPECIFICATION LIST 18
SPECIAL PROJECT SPECIFICATIONS 19 - 69
I I
.i
: I fT···
I
\j
J
I
�\ I
/1 / I
I ,,, ____ _,, \ I .:; ,,-, ,\ J 'I
'I
"11--
\'\23!1.i-�� ' -
I I I
'\i!::'9 , ,,,.,----1
,,,.,, i
,r-'
I
.... ......... J.<47 ' ..... ' 14 '
--l2.$113 l - .... .. ;
'9-... .. , r __ ..., • I , \, I eo f
,-,,, I
I I r . , , I . I I
I
I' ,, --··-t·-·· .... , I
I '
I
I
I
Quill Stewardship Bighorn National Forest
SPECIFIED ROAD LIST
ROAD NAME NUMBER MILES CONSTRUCT RECONSTRUCT
BUCKSHOT 124313 0.9 -0- 0.9
MILES CONSTRUCTION (C): 0.0
MILES RECONSTRUCTION (R): 0.9
PROJECT TOTAL MILES: 0.9 .
PROJECT NOTES
1. SPECIFICATIONS
THE SPECIFICATIONS FOR THIS CONTRACT ARE CONTAINED WITHIN
THE DOCUMENT “STANDARD SPECIFICATIONS FOR CONSTRUCTION
OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS”,
DOCUMENT FP-14 U.S. CUSTOMARY UNITS. A COPY OF THESE
SPECIFICATIONS CAN BE OBTAINED BY VISITNG THE WEBSITE:
http://flh.fhwa.dot.gov/resources/specs/
2. SPECIFICATION 201 – CLEARING LIMITS
CLEARING LIMITS WILL BE AS SHOWN ON THE DRAWINGS FOR
ROAD RECONDITIONING.
3. SPECIFICATION 204 - ROLLING DIP LOCATIONS
ROLLING DIP LOCATIONS AS SHOWN ON THE CONSTRUCTION PLANS
ARE APPROXIMATE AND THE EXACT LOCATIONS WILL BE STAKED
IN THE FIELD BY THE FOREST SERVICE.
4. SPECIFICATION 301 – AGGREGATE
AGGREGATE FOR USE ON THIS PROJECT WILL COME FROM A
STOCKPILE LOCATED IN THE BALD MOUNTAIN PIT T56N, R92W,
SEC. 29
5. SPECIFICATION 303 - DITCHES
REESTABLISH DITCHES ONLY WHERE NEEDED TO CORRECT
DRAINAGE. THOSE LOCATION WILL BE AGREED TO ON THE
GROUND.
6. SPECIFICATION 633 – OBJECT & BARRICADE MARKERS
THE OBJECT MARKERS AND BARRICADE FOR USE ON THE POWDER
RIVER GATE WILL BE SUPPLIED BY THE GOVERNMENT FOR
INSTALLATION BY THE CONTRACTOR.
7. SPECIFICATION 635 – CONSTRUCTION SIGNS
CASE II CONSTRUCTION WARNING SIGNS WILL BE REQUIRED ON
THIS SALE.
8. SPECIFICATION 650 – POWDER RIVER GATE
INSTALLATION OF THE POWDER RIVER GATE WILL INVOLVE THE
INSTALLATION OF 3 NEW POSTS (HINGE, LOCKED OPEN AND
LOCKED CLOSED). THE GATE WILL BE TIED INTO THE EXISTING
FENCELINE.
1282MK19R4001
http://flh.fhwa.dot.gov/resources/specs/
SUMMARY OF QUANTITIES
(QUILL STEWARDSHIP ROADS)
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
151(01) Mobilization Lump Sum 1
201(03) Clearing and grubbing, disposal of tops and limbs E (Scattering), logs E (Scattering), stumps E (Scattering)
Mile 0.55
204(20) Drainage excavation, type Rolling Dip Each 1
301(03) Aggregate base, grading N/A , compaction method A Cy 250
303(01)A Road reconditioning, N/A inch depth, surfacing aggregate surfacing, compaction method A
Mile 0.35
303(01)N Road reconditioning, N/A inch depth, surfacing native surfacing, compaction method A
Mile 0.55
633(06)L Installing Barricade Markers (BM-L-24) Government Furnished Each 2
633(06)R Installing Barricade Markers (BM-R-24) Government Furnished Each 2
633(07) Installing Object Markers (OM-2-B) Government Furnished Each 4
650(01) Furnish and install road closure device, Type II, Size 16’ Each 1
TOTAL
NOTE: Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
Quill Stewardship Bighorn National Forest
SCHEDULE OF ITEMS
(QUILL STEWARDSHIP ROADS)
BUCKSHOT - ROAD #124313
MP 0.0 TO 0.9
NOTE: Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
151(01) Mobilization Lump Sum
201(03) Clearing and grubbing, disposal of tops and limbs E (Scattering), logs E (Scattering), stumps E (Scattering)
Mile 0.55
204(20) Drainage excavation, type Rolling Dip Each 1
301(03) Aggregate base, grading N/A , compaction method A Cy 250
303(01)A Road reconditioning, N/A inch depth, surfacing aggregate surfacing, compaction method A
Mile 0.35
303(01)N Road reconditioning, N/A inch depth, surfacing native surfacing, compaction method A
Mile 0.55
633(06)L Installing Barricade Markers (BM-L-24) Government Furnished Each 2
633(06)R Installing Barricade Markers (BM-R-24) Government Furnished Each 2
633(07) Installing Object Markers (OM-2-B) Government Furnished Each 4
650(01) Furnish and install road closure device, Type II , Size 16” Each 1
TOTAL
Quill Stewardship Bighorn National Forest
TYP. EXTRA
MILEPOST SECTION DRAIN. WIDTH (ft) DESCRIPTION
0.0 JCT. WITH FSR #13
0.0 RECON. (A) 1’ DITCH BEGIN RECONDITIONING
BEGIN PLACEMENT OF
AGGREGATE
0.0 EXISTING 18” CMP
0.05 EXISTING 12” CMP
CLEAN INLET AND OUTLET
0.25 EXISTING FENCE NO GATE
0.30 EXISTING 32”X42” CMPA
0.30 END PLACEMENT OF
AGGREGATE
0.35 EXISTING WIRE GATE
0.35 INSTALL POWDER RIVER GATE,
BARRACIDE MARKERS AND
OBJECT MARKERS.
0.35 RECON. (A) ½’ DITCH BEGIN 20’ WIDE CLEARING
0.45 EXISTING 24” CMP
0.60 EXISTING NATURAL DIP
0.65 EXISTING NATURAL DIP
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
DESCRIPTION OF WORK BIGHORN NATIONAL FOREST
ROAD NUMBER 124313 STANDARD of
DRAWING
TYP. EXTRA
MILEPOST SECTION DRAIN. WIDTH (ft) DESCRIPTION
0.70 EXISTING 18” CMP
CLEAN OUTLET
0.75 CONSTRUCT ROLLING DIP
0.80 EXISTING NATURAL DIP
0.85 EXISTING 36” CMP
0.90 END RECONDITIONING
END CLEARING
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
DESCRIPTION OF WORK BIGHORN NATIONAL FOREST
ROAD NUMBER 124313 STANDARD of
DRAWING
Quill Stewardship Bighorn National Forest
STANDARD SPECIFICATIONS FOR CONSTRUCTION OF
ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS
FP- 14
U.S. CUSTOMARY UNITS
QUILL STEWARDSHIP ROADS
SPECIFICATION LIST
Spec. No. Title Road Numbers Special Project Specifications
151 MOBILIZATION #124313
201 CLEARING AND GRUBBING #124313
204 EXCAVATION AND EMBANKMENT #124313 X
301 UNTREATED AGGREGATE COURSE #124313 X
303 ROAD RECONDITIONING #124313 X
633 PERMANENT TRAFFIC CONTROL #124313 X
635 TEMPORARY TRAFFIC CONTROL #124313 X
650 ROAD CLOSURE DEVICES #124313 X
Quill Stewardship Bighorn National Forest
Special Project Specifications
Table of Contents Table of Contents Preface 101 - Terms, Format, and Definitions ........................................................................ 21 - 24 102 - Bid, Award, and Execution of Contract 103 - Scope of Work 104 - Control of Work.................................................................................................. 27-28 105 - Control of Material 106 - Acceptance of Work ......................................................................................... 30 - 32 107 - Legal Relations and Responsibility To the Public............................................ 33 - 36 108 - Prosecution and Progress 109 - Measurement and Payment 156 - Public Traffic .................................................................................................... 39 - 41 171 - Weed and Disease Prevention .......................................................................... 42 - 43 204 - Excavation and Embankment ........................................................................... 44 - 55 301 - Untreated Aggregate Courses…………………………………………………56 - 62 303 - Road Reconditioning ........................................................................................ 63 - 65 633 - Pemanent Traffic Control………………………………………………………….66 635 - Temporary Traffic Control 650 - Road Closure Devices………………………………………………………...68 - 69
Quill Stewardship Bighorn National Forest
Preface Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of
National Forest System Roads.
Quill Stewardship Bighorn National Forest
101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the FAR (Federal Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association
Mine Safety and Health Administration
National Institute of Standards and Technology
National Electrical Safety Code
West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the
“purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Quill Stewardship Bighorn National Forest
1282MK19R4001
http://www.nist.gov/
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal
Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale
Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition
Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges.
Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the
Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Quill Stewardship Bighorn National Forest
Figure 101-1—Illustration of road structure terms.
101.04_nat_us_11_06_2007
Bighorn National Forest
101.04 Definitions.
Delete the following definitions:
Contract Modification
Day
Notice to Proceed
Solicitation
Quill Stewardship Bighorn National Forest
102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work 103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
Quill Stewardship Bighorn National Forest
104 - Control of Work 104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.03_nat_us_01_22_2009
104.03 Specifications and Drawings.
Delete 104.03.
104.03_nat_us_02_22_2005
104.03 Specifications and Drawings.
Add the following:
(c) As-Built-Plans. Furnish one set of as built plans. The Government will provide one set of contract plans to be used exclusively for recording the as-built details of the project.
Use red pencil or red ink to record the information on the as-built plans.
Note all additions or revisions to the location, character, and dimensions of the prescribed work shown on the contract plans. Line out all details shown that are not applicable to the completed work. Check off details shown that were incorporated into the completed work without change.
Retain the plans at the project site and, as work progresses, continually update them to reflect the as-built details. Upon request, make the plans available to the CO to review for compliance with these specifications.
Show the following types of changes on the as-built plans:
(1) Typical section(s)
(a) Revisions in dimensions
(b) Revisions in materials
(2) Plan and profile
Revisions to the alignment
Changes in the construction limits
Revisions in location, type, and grade of road approaches
Location and type of utilities
Location, size, and type of underdrains
Skew of culverts
Channel changes
Location of monuments and permanent references
Elevations for all aerial and underground crossings of utilities
Location, length, and type of fencing
Revisions to grades, elevations, and stationing of intersection PIs
Equations
Culvert diameter, length, type, and stationing. On culvert extensions, indicate the length of the existing pipe and the length of the extension.
Location, length, stationing, and type of retaining walls
Location, length, stationing, and end treatment of guardrail
(3) Bridge
(a) Stationing of bridge ends
(b) Revisions to footing and seal elevations
(c) Pile length, size, type, and tip elevation
(d) Any changes in plan or dimensions including any major changes in reinforcing
(4) Miscellaneous
(a) Revisions to parking areas or turnouts
(b) Final location, type and length of curbs, sidewalks, etc.
Furnish the as-built working plans to the CO before the final inspection. Correct all details found during the final inspection that are not shown on the as-built plans and return to the CO within 5 days.
104.03_nat_us_02_22_2005
104.03 Drawings and Specifications
Delete subsection 104.03 104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
104.07_nat_us_02_17_2005
Add Subsection.
104.07 Other Contracts.
Example: The Federal Highway Administration is administering and is intending to award a contract for the reconstruction of 3 1/2 miles of Salmon la Sac Road approximately 5 miles north of this project. Schedule activities to assure no delays or interference to the operations of the Federal Highway Administration contract.
Quill Stewardship Bighorn National Forest
105 - Control of Material 105.02_nat_us_01_18_2007
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The
Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work 106.01_nat_us_07_31_2007
106.01 Conformity with Contract Requirements.
Delete Subsection 106.01 and substitute the following:
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the
Contractor upon request. Government tests may or may not be performed at the work site.
If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price.
Four methods of determining conformity and accepting work are described in Subsections
106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method;
(2) Number of samples;
(3) Sample transport;
(4) Test procedures;
(5) Testing laboratories;
(6) Reporting;
(7) Estimated time and costs; and
(8) Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed
Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the
Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis.
The CO will determine disposition of the nonconforming work.
106.01_nat_us_07_31_2007
Quill Stewardship Bighorn National Forest
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
Quill Stewardship Bighorn National Forest
107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
Quill Stewardship Bighorn National Forest
107 - Legal Relations and Responsibility To the Public 107.08_nat_us_05_11_2004
107.08 Sanitation, Health, and Safety.
Add the following:
Perform all operations in a prudent, conscientious, safe and professional manner. Ensure that all personnel involved in handling and packaging the hazardous waste are trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures, and spills. Provide handling and personal protective equipment appropriate to ensure safe handling of the hazardous waste according to 29 CFR 1910.120). Notify the Forest Service of all hazardous material that may be brought onto the National Forest.
107 - Legal Relations and Responsibility to the Public 107.08_nat_us_03_29_2005
107.08 Sanitation, Health, and Safety
Delete the entire subsection.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
Quill Stewardship Bighorn National Forest
107 - Legal Relations and Responsibility To the Public 107.11_nat_us_02_17_2005
107.11 Protection of Forests, Parks, and Public Lands:
Add the following:
Add appropriate fire plan and equipment language.
Quill Stewardship Bighorn National Forest
108 - Prosecution and Progress 108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment 109.00_nat_us_02_17_2005
109 Deletions Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of
15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
109.03_nat_us_02_17_2005
Quill Stewardship Bighorn National Forest
156 - Public Traffic 156.00_nat_us_04_17_2007
Delete Section 156 in its entirety and replace with the following:
Description
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Construction sign panels 633
Retro-reflective sheeting 718.01
Temporary concrete barrier 618
Temporary plastic fence 710.11
Temporary traffic control devices 718.22
156.03 General. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed ___ minutes at any one time followed by an open period of no less than ___ minutes.
Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post construction signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the
Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
Quill Stewardship Bighorn National Forest
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services
Association, the National Safety Council, the International Municipal Signal
Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1.
The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.
Table 156-1
Temporary Road Closures
Road
Number
From
Terminus
To
Terminus
Maximum
Consecutive
Days of
Closure
Minimum
Consecutive
Days Open
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Compensation is made as an indirect payment.
156.03_nat_us_02_24_2005
Quill Stewardship Bighorn National Forest
156.03 Accommodating Traffic During Work.
Delete the following from the last paragraph:
according to Subsection 106.07(b)
156.04_nat_us_02_24_2005
156.04 Maintaining Roadways During Work.
(a) Add the following:
Do not construct detours outside of the clearing limits or use alternate route detours without the approval of the CO.
156.08_nat_us_02_24_2005
156.08 Traffic and Safety Supervisor.
Delete this subsection in its entirety.
Quill Stewardship Bighorn National Forest
171 - Weed and Disease Prevention 171.00_nat_us_03_30_2005
Description
171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on
National Forest System lands.
Material
171.02 Conform to the following Subsection:
Water 725.01
Construction Requirements
171.03 General . Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest System lands.
Perform all work at a location designated on the plans or other locations approved in writing. Provide the CO with an opportunity to monitor the washing and inspection.
171.04 Equipment. Use a high pressure washing system.
For work on National Forest System lands, use a washing system that traps all wash water and either stores it for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds in an approved manner.
Do not mix soaps, detergents, or other chemicals with the wash water.
For work at a commercial washing facility, use an approved facility.
171.05 Washing. Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.
171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment. Rewash the construction equipment as necessary or as directed.
171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02.
Measurement
171.08 Do not measure weed prevention for payment.
Payment
171.09 Include all costs associated with the Section 171-Weed Prevention in the unit price for Section 151-Mobilization.
Quill Stewardship Bighorn National Forest
204 - Excavation and Embankment 204.00_nat_us_03_26_2009
Replace Section 204 in its entirety with the following:
Description
204.01 This work consists of excavating material and constructing embankments. This includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.
204.02 Definitions.
(a) Excavation. Excavation consists of the following:
(1) Roadway excavation. All material excavated from within the right-of-way or easement areas, except subexcavation covered in (2) below and structure excavation covered in Sections 208 and 209. Roadway excavation includes all material encountered regardless of its nature or characteristics.
(2) Subexcavation. Material excavated from below subgrade elevation in cut sections or from below the original groundline in embankment sections.
Subexcavation does not include the work required by Subsections 204.05, 204.06(b), and 204.06(c).
(3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism. Borrow excavation includes unclassified borrow, select borrow, and select topping.
(b) Embankment construction. Embankment construction consists of placing and compacting roadway or borrow excavation. This work includes:
(1) Preparing foundation for embankment;
(2) Constructing roadway embankments;
(3) Benching for side-hill embankments;
(4) Constructing dikes, ramps, mounds, and berms; and
(5) Backfilling subexcavated areas, holes, pits, and other depressions.
(c) Conserved topsoil. Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation.
(d) Waste. Excess and unsuitable roadway excavation and subexcavation that cannot be used.
Quill Stewardship Bighorn National Forest
Material
204.03 Conform to the following Subsections:
Backfill material 704.03
Select borrow 704.07
Select topping 704.08
Topping 704.05
Unclassified borrow 704.06
Water 725.01
Construction Requirements
204.04 Preparation for Roadway Excavation and Embankment Construction. Clear the area of vegetation and obstructions according to Sections 201 and 203.
204.05 Reserved.
204.06 Roadway Excavation. Excavate as follows:
(a) General. Do not disturb material and vegetation outside the construction limits.
Incorporate only suitable material into embankments. Replace any shortage of suitable material caused by premature disposal of roadway excavation. Dispose of unsuitable or excess excavation material according to Subsection 204.14.
At the end of each day's operations, shape to drain and compact the work area to a uniform cross-section. Eliminate all ruts and low spots that could hold water.
Retrieve material deposited outside of the clearing limits as directed by the CO. Place unsuitable material in designated areas.
(b) Rock cuts. Blast rock according to Section 205. Excavate rock cuts to 6 inches below subgrade within the roadbed limits. Backfill to subgrade with topping or with other suitable material. Compact the material according to Subsection 204.11
(c) Earth cuts. Scarify earth cuts to 6 inches below subgrade within the roadbed limits.
Compact the scarified material according to Subsection 204.11.
(d) Pioneer Roads. Road pioneering, slash disposal, and grubbing of stumps may proceed concurrently with excavation. Conduct excavation and placement operations so material to be treated under Section 201 will not be incorporated into the roadway unless specified in the slash treatment method. Maintain drainage during pioneering operations.
Remove snow and ice in advance of the work and deposit beyond the roadway limits in a manner that will not waste material or generate sediment. Do not incorporate snow and ice into embankments. Place snow or ice in a manner to prevent resource damage.
Quill Stewardship Bighorn National Forest
204.07 Subexcavation. Excavate material to the limits designated by the CO. Take cross-sections according to Section 152. Prevent unsuitable material from becoming mixed with the backfill. Dispose of unsuitable material according to Subsection 204.14. Backfill the subexcavation with topping, or other suitable material. Compact the material according to
Subsection 204.11.
204.08 Borrow Excavation. Use all suitable roadway excavation in embankment construction. Do not use borrow excavation when it results in excess roadway excavation.
Deduct excess borrow excavation from the appropriate borrow excavation quantity.
Obtain borrow source acceptance according to Subsection 105.02. Develop and restore borrow sources according to Subsection 105.03. Do not excavate beyond the established limits. When applicable, shape the borrow source to permit accurate measurements when excavation is complete.
204.09 Preparing Foundation for Embankment Construction. Prepare foundation for embankment construction as follows:
(a) Embankment less than 4 feet high over natural ground. When designated, remove topsoil and break up the ground surface to a minimum depth of 6 inches by plowing or scarifying. Compact the ground surface according to Subsection 204.11.
(b) Embankments over an existing asphalt, concrete, or gravel road surface. Scarify gravel roads to a minimum depth of 6 inches. Scarify or pulverize asphalt and concrete roads to 6 inches below the pavement. Reduce all particles to a maximum size of 6 inches and produce a uniform material. Compact the surface according to Subsection 204.11.
(c) Embankment across ground not capable of supporting equipment. Dump successive loads of embankment material in a uniformly distributed layer to construct the lower portion of the embankment. Limit the layer thickness to the minimum depth necessary to support the equipment.
(d) Embankment on an existing slope steeper than 1V:3H. Cut horizontal benches in the existing slope to a sufficient width to accommodate placement and compaction operations and equipment. Bench the slope as the embankment is placed and compacted in layers. Begin each bench at the intersection of the original ground and the vertical cut of the previous bench.
204.10 Embankment Construction. Incorporate only suitable roadway excavation material into the embankment. When the supply of suitable roadway excavation is exhausted, furnish unclassified borrow to complete the embankment. Obtain written approval before beginning construction of embankments over 6 feet high at subgrade centerline. Construct embankments as follows:
Quill Stewardship Bighorn National Forest
(a) General. At the end of each day's operations, shape to drain and compact the embankment surface to a uniform cross-section. Eliminate all ruts and low spots that could hold water.
During all stages of construction, route and distribute hauling and leveling equipment over the width and length of each layer of material.
Compact embankment side slopes flatter than 1V:1.75H with a tamping type roller or by walking with a dozer. For slopes 1V:1.75H or steeper, compact the slopes as construction of the embankment progresses.
Where placing embankment on one side of abutments, wing walls, piers, or culvert headwalls, compact the material using methods that prevent excessive pressure against the structure.
Where placing embankment material on both sides of a concrete wall or box structure, conduct operations so compacted embankment material is at the same elevation on both sides of the structure.
Where structural pilings are placed in embankment locations, limit the maximum particle size to 4 inches.
(b) Embankment within the roadway prism. Place embankment material in horizontal layers not exceeding 12 inches in compacted thickness. Incorporate oversize boulders or rock fragments into the 12-inch layers by reducing them in size or placing them individually as required by (c) below. Compact each layer according to Subsection
204.11 before placing the next layer.
Material composed predominately of boulders or rock fragments too large for 12-inch layers may be placed in layers up to 24 inches thick. Incorporate oversize boulders or rock fragments into the 24-inch layer by reducing them in size or placing them individually according to (c) below. Place sufficient earth and smaller rocks to fill the voids. Compact each layer according to Subsection 204.11 before placing the next layer.
(c) Individual rock fragments and boulders. Place individual rock fragments and boulders greater than 24 inches in diameter as follows:
(1) Reduce rock to less than 48 inches in the largest dimension.
(2) Distribute rock within the embankment to prevent nesting.
(3) Place layers of embankment material around each rock to a depth not greater than that permitted by (b) above. Fill all the voids between rocks.
(4) Compact each layer according to Subsection 204.11 before placing the next layer.
(d) Embankment outside of roadway prism. Where placing embankment outside the staked roadway prism, place material in horizontal layers not exceeding 24 inches in compacted thickness. Compact each layer according to Subsection 204.11.
Quill Stewardship Bighorn National Forest
204.11 Compaction. Compact the embankment using one of the following methods as specified:
(a) Compaction A. Use AASHTO T 27 to determine the amount of material retained on a Number 4 sieve. If there is more than 80 percent retained on the No. 4 sieve use procedure (1). If there is 50 to 80 percent retained on the No. 4 sieve use procedure (2).
If there is less than 50 percent retained on the No. 4 sieve use procedure (3).
(1) Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation.
(a) Four roller passes of a vibratory roller having a minimum dynamic force of
40,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.
(b) Eight roller passes of a 20-ton compression-type roller.
(c) Eight roller passes of a vibratory roller having a minimum dynamic force of
30,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.
Increase the compactive effort for layers deeper than 12 inches as follows:
For each additional 6 inches or fraction thereof, increase the number of roller passes in (a) above by four passes.
For each additional 6 inches or fraction thereof, increase the number of roller passes in (b) and (c) above, by eight passes.
(2) Use AASHTO T 99 to determine the optimum moisture content of the portion of the material passing a No. 4 sieve. Multiply this number by the percentage of material passing a No. 4 sieve, and add 2 percent to determine the optimum moisture content of the material. Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content.
Use compression-type rollers at speeds less than 6 feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width according to (1) above.
(3) Classify the material according to AASHTO M 145. For material classified A-1 or A-2-4, determine the maximum density according to AASHTO T 180, method D.
For other material classifications, determine the optimum moisture content and maximum density according to AASHTO T 99, method C.
Quill Stewardship Bighorn National Forest
Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified
A-6 and A-7 to within 2 percent of the optimum moisture content.
Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density. Determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures.
When required, use AASHTO T 224 to correct for coarse particles.
(b) Compaction B. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment.
Operate compaction equipment over the full width of each layer until there is no visible evidence of further consolidation or, if when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes.
(c) Compaction C. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.
204.12 Ditches. Slope, grade, and shape ditches. Remove all projecting roots, stumps, rock, or similar matter. Maintain all ditches in an open condition and free from leaves, sticks, and other debris.
Form furrow ditches by plowing or using other acceptable methods to produce a continuous furrow. Place all excavated material on the downhill side so the bottom of the ditch is approximately 18 inches below the crest of the loose material. Clean the ditch using a hand shovel, ditcher, or other suitable method. Shape to provide drainage without overflow.
204.13 Sloping, Shaping, and Finishing. Complete slopes, ditches, culverts, riprap, and other underground minor structures before placing aggregate courses. Slope, shape, and finish as follows:
(a) Sloping. Leave all earth slopes with uniform roughened surfaces, except as described in (b) below, with no noticeable break as viewed from the road. Except in solid rock, round tops and bottoms of all slopes including the slopes of drainage ditches. Round material overlaying solid rock to the extent practical. Scale all rock slopes. Slope rounding is not required on tolerance class D though M roads.
If a slide or slipout occurs on a cut or embankment slope, remove or replace the material, and repair or restore all damage to the work. Bench or key the slope to stabilize the slide.
Reshape the cut or embankment slope to an acceptable condition.
Quill Stewardship Bighorn National Forest
(b) Stepped slopes. Where required by the contract, construct steps on slopes of
1⅓V:1H to 1V:2H. Construct the steps approximately 18 inches high. Blend the steps into natural ground at the end of the cut. If the slope contains nonrippable rock outcrops, blend steps into the rock. Remove loose material found in transitional area. Except for removing large rocks that may fall, scaling stepped slopes is not required.
(c) Shaping. Shape the subgrade to a smooth surface and to the cross-section required.
Shape slopes to gradually transition into slope adjustments without noticeable breaks. At the ends of cuts and at intersections of cuts and embankments, adjust slopes in the horizontal and vertical planes to blend into each other or into the natural ground.
(d) Finishing. Finish the roadbed to be smooth and uniform, and shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material. Finish roadbeds to the tolerance class shown in table 204-2.Ensure that the subgrade is visibly moist during shaping and dressing. Scarify to 6 inches below the bottom of low sections, holes, cracks, or depressions and bring back to grade with suitable material. Maintain proper ditch drainage.
For surfaced roads, remove all material larger than 6 inches from the top 6 inches of the roadbed.
For unsurfaced roads, use one of the following methods to finish the roadbed:
(1) Method A. Remove all material larger than 6 inches from the top 6 inches of the roadbed and replace with suitable material.
(2) Method B. Use a vibratory grid roller or approved equal with a minimum weight of 10 tons. Roll at least 5 full-width passes or until there is no visible evidence of further consolidation.
(3) Method C. For roads designated as Construction Tolerance Class K, L, or M, finish the roadbed by spreading the excavation. Eliminate rock berms.
204.14 Disposal of Unsuitable or Excess Material. Dispose of unsuitable or excess material at designated sites or legally off of the project.
When there is a pay item for waste, shape and compact the waste material in its final location.
Do not mix clearing or other material not subject to payment with the waste material.
204.15 Acceptance. See Table 204-1 for sampling and testing requirements.
Material for embankment and conserved topsoil will be evaluated under Subsections 106.02 and 106.04.
Excavation and embankment construction will be evaluated under Subsections 106.02 and
106.04.
Quill Stewardship Bighorn National Forest
Clearing and removal of obstructions will be evaluated under Sections 201 and 203.
Measurement
204.16 Measure the Section 204 items listed in the bid schedule according to Subsection
109.02 and the following as applicable.
(a) Roadway excavation. Measure roadway excavation in its original position as follows:
(1) Include the following volumes in roadway excavation:
(a) Roadway prism excavation;
(b) Rock material excavated and removed from below subgrade in cut sections;
(c) Unsuitable material below subgrade and unsuitable material beneath embankment areas when a pay item for subexcavation is not shown in the bid schedule;
(d) Ditches, except furrow ditches measured under a separate bid item;
(eTopsoil;
(f) Borrow material used in the work when a pay item for borrow is not shown in the bid schedule;
(g) Loose scattered rocks removed and placed as required within the roadway;
(h) Conserved material taken from stockpiles and used in Section 204 work;
and
(i) Slide and slipout material not attributable to the Contractor's method of operation.
(2) Do not include the following in roadway excavation:
(a) Overburden and other spoil material from borrow sources;
(b) Overbreakage from the backslope in rock excavation;
(c) Water or other liquid material;
(d) Material used for purposes other than required;
(e) Roadbed material scarified in place and not removed;
(f) Material excavated when stepping cut slopes;
(g) Material excavated when rounding cut slopes;
(h) Preparing foundations for embankment construction;
(i) Material excavated when benching for embankments;
(j) Slide or slipout material attributable to the Contractor's method of operation;
(k) Conserved material taken from stockpiles constructed at the option of the
Contractor; and
(l) Material excavated outside the established slope limits.
(3) When both roadway excavation and embankment construction pay items are shown in the bid schedule, measure the following as roadway excavation only:
(a) Unsuitable…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.