A-10_1282MK18Q0010.pdf

PDF 426 KB Posted

Attached to
Site Preparation Federal contract opportunity
Solicitation number
1282MK18Q0010
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

View the file

Other files for this federal contract opportunity

Other files attached to Site Preparation, newest first.
File Type Posted
A-10_Attachment_4_Wage_Determination_01162018.pdf PDF
A-10_Attachment_A1_UtilizationBioBasedProducts.docx DOCX document
A-10_Attachment_1_Maps.pdf PDF
A-10_Attachment_A2_Experience_Questionnaire2.docx DOCX document
A-10_Attachment_3_Road_Schematic_Plates.pdf PDF
A-10_Attachment_2_Photo_Examples.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

82MK

216 NORTH COLORDO STREET

ATTN PEGGY DOBIE

USDA FOREST SERVICE

GRAND MESA UNCOMPAHGRE GUNNISON N

82Z7 CODE 16. ADMINISTERED BYCODE

X

X

X

115310

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED OR82MK

RFPIFB

10. THIS ACQUISITION ISCODE

RFQ

14. METHOD OF SOLICITATION

13b. RATING

NAICS:

SMALL BUSINESS

05/16/2018 1300 MT

04/25/2018

970-642-4415PEGGY DOBIE

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

1282MK18Q0010

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 48 906853OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

GUNNISON CO 81230

TELEPHONE NO.

17a. CONTRACTOR/

GUNNISON CO 81230-2197

216 N COLORADO STREET

GUNNISON RANGER DISTRICT

USDA FOREST SERVICE

15. DELIVER TO

GUNNISON CO 81230

216 NORTH COLORDO STREET

ATTN PEGGY DOBIE

USDA FOREST SERVICE

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$7.50

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

11.

SEE SCHEDULE

12. DISCOUNT TERMS

THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

8(A)

GRAND MESA UNCOMPAHGRE GUNNISON N

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Grand Mesa, Uncompahgre and Gunnison National Forests - Gunnison Ranger District

2018 East Zone Site Preparation

Contact Person: ________________________________

Phone: _________________________________________

EMail: _________________________________________

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

X

XX

DATED

PEGGY DOBIE

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

OFFER

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT:

REF.

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 2/2012) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

DUNS #: ________________________________________

Delivery: 07/01/2018

001 IAS, EZ, Site Preparation Contract

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

48 2 of

East Zone Site Preparation 1282MK18Q0010 GMUG NFs – Gunnison RD Page 3 of 48

B - SECTION B - Supplies or Services and Prices/Costs Schedule of Items

C - SECTION C - Description/Specifications/Statement of Work

D - SECTION D - Packaging and Marking

E - SECTION E - Inspection and Acceptance

F - SECTION F - Deliveries or Performance

G - SECTION G - Contract Administration Data

H - SECTION H - Special Contract Requirements

I - SECTION I - Contract Clauses

J - SECTION J - List of Documents, Exhibits, and Other Attachments

K - SECTION K - Representations, Certifications, and Other Statements of Offerors

L - SECTION L - Instructions, Conditions, and Notices to Offerors or Respondents

M - SECTION M - Evaluation Factors for Award

GMUG NFs – Gunnison RD Page 4 of 48

B - SECTION B - Supplies or Services and Prices/Costs Schedule of Items

Base Bid Items

Item # Project Area Amount Hours

Estimated Dozer Time

Unit of Measure Price

1 Mill Creek 2 Project Area Rehabilitation of 72 Slash Pile

Ash Pits.

22 Lump Sum $

2 Rambo Salvage Project Area

Rehabilitation of 66 Ash Pits, Site prep for tree planting

28 acres.

21 (Ash Pits)

9(Scarification)

30 (Total)

Lump Sum $

Total Lump Sum Items 1 and 2 $

Option Bid Items

3 Additional Equipment Work (as directed) TBD (Hours) TBD Per Hour $

Equipment Make, Model, Year

This Site Preparation contract is located in two areas. Item One, the Mill Creek II Salvage Sale is on Slumgullion Pass in Section 8-10 and 15-17 of T.43N., R.3W., NMPM, Hinsdale County, Colorado. Item Two is the Rambo Salvage Sale near Spring Creek Pass in Sections 26-29 and 32-34 of T.43N., R.3W., NMPM, Hinsdale County, Colorado. Both areas are accessed from Gunnison via Colorado Highway 149 thorough Lake City to the Slumgullion Pass area.

This is a total Small Business Set Aside.

Vendors must be registered in System for Award Management to be considered responsive.

GMUG NFs – Gunnison RD Page 5 of 48

Item 1 Seventy two (72) burned slash piles across eight units will be rehabilitated by ripping the charcoal bed and soil below, stirring and mixing the ash, soil, and woody debris in the area around the ash pit.

Equipment time for this Schedule Item is estimated at 22 hours (which includes walk-in/out time).

Item 2 is site preparation for planting by machine scarification of the ground on 28 acres in one cutting unit. Sixty six (66) burned slash piles across three units will be rehabilitated by ripping the charcoal bed and soil below, stirring and mixing the ash, soil, and woody debris in the area around the ash pit.

Equipment time is estimated at 30 hours (which includes walk-in/out time).

Optional Item 3 is for hourly equipment rental with operator, fuel, and supplies for minor additional, related work while in the project area as may be directed by the Government representative (COR).

Implementation will be dependent on available funding.

A dozer of the D-4 to D-5 Catepillar size-class (90-120 h.p.) is required for this type of work on this site condition.

A tractor/lowboy trailer can be used to access the all drop points designated at each bid item on the maps.

For access to Schedule Item 1, Offeror’s should be aware of steep grades (9% plus) on the west side of Slumgullion Pass on Colorado Highway 149 between Lake City and Slumgullion Summit.

Moving equipment from Schedule Items 1 and 2 will be on the paved Colorado Highway 149. The distance is four miles. Transport of the equipment by trailer is expected.

Contractor costs for mobilization, walking into treatment areas, operators, maintenance, fuel, and other items will need to be included into the Lump Sum Offer, not as separate costs. Total equipment time is estimated at 52 hours (which includes walk-in/out time).

Contract performance period is seven (7) days.

GMUG NFs – Gunnison RD Page 6 of 48

C - SECTION C - Description/Specifications/Statement of Work

C.1 DESCRIPTION OF WORK

C.1.1. Scope of Contract

The solicitation is for crawler tractor work on the Gunnison Ranger District of the Grand Mesa, Uncompahgre, and Gunnison National Forests. The Contractor shall furnish all labor, equipment, supervision, transportation, supplies, and incidentals to perform all work necessary on the areas specified in the contract.

All aspects of the work program shall be performed in an organized, systematic manner to ensure services are performed over the entire project areas.

Acreage of the site preparation for planting units was determined using a differentially corrected GPS unit. Other acres are from a combination of GPS and GIS technology. Count and location of ash pits was by determined from field reconnaissance and GPS waypoints, cross checked against aerial photographic imagery taken in mid-October, 2017. Not all slash piles may have been burned in November, 2017.

No forest products shall be removed from the project area.

C.1.1.1. This contract is a Performance Based, firm-fixed price contract.

C.1.1.2. The performance period will be from approximately July 1, 2018 to July 31, 2018 depending upon the running of contract time. Seven (7) consecutive days are allowed for Schedule Items 1 and 2 in combination. See F.1.1. – Contract Time.

C.1.2. Location, Access, and Description of Units

Spring 2018 Spring Site Preparation – The contracted work will be in two locations on the Gunnison Ranger District. Each location is bundled as a Schedule Item.

2018 Mill Creek 2 Site Preparation

Schedule Item 1 is on Slumgullion Pass along Colorado Highway 149 nine miles southeast of Lake City, Colorado. Part of the project area is accessed from Forest Road 788 northeast of Colorado Highway 149.

The legal description is Sections 8 to 10, and 15 to 17 of T.43N, R.3W, NMPM, Hinsdale County, Colorado. To access the Slumgullion Project Area, head west from Gunnison on US Highway 50 for 9 miles. Travel south on Colorado Highway 149 for 54 miles, going through the town of Lake City to equipment drop points. A portion of the ash pits to be treated are along or near FR 788, north of the former Slumgullion Campground. A secondary access is through the town of Creede, Colorado, head north on Highway 149 for approximately 40 miles to the Slumgullion worksites. See Maps 1, 2, and 3.

The work includes rehabilitating 72 burned slash pile ash pits prior to tree planting. The ash pits are in recent Engelmann spruce clearcuts. The clearcut units/numbers are displayed on Map 2 for orientation purposes only.

GMUG NFs – Gunnison RD Page 7 of 48

2018 Rambo Salvage Site Preparation

Schedule Item 2 is on Slumgullion Pass along Colorado Highway 149 sixteen miles southeast of Lake City, Colorado. The legal description is Sections 26, 27, 28, 29, 32, and 34. T.43N, R.3W, NMPM, Hinsdale County, Colorado. To access the Slumgullion Project Area, head west from Gunnison on US Highway 50 for 9 miles. Travel south on Colorado Highway 149 for 61 miles, going through the town of Lake City to equipment drop points. All of the ash pits to be treated are along FR 735. A secondary access is through the town of Creede, Colorado, head north on Highway 149 for approximately 34 miles to the Slumgullion worksites. See Maps 1, 2, and 3. The work includes rehabilitating 66 burned slash pile ash pits prior to tree planting. The ash pits are in recent Engelmann spruce clearcuts. The project includes site preparation for tree planting by machine scarification on 28 acres in one cutting unit.

Work To Be Completed By Treatment Unit

Treatment Unit on

Map

Treatment Unit Acres

(Gross)

Average Percent Slope

Number of Ash Pits to

Rehabilitate

Acres of Site Preparation for Planting

1 86 15% 12 -- 2 84 17% 14 -- 3 88 15% 16 -- 4 128 25% 8 -- 5 50 30% 6 -- 6 32 25% 5 -- 7 6 20% 1 -- 8 3 10% 10 --

Schedule Item 1 474 72 0

Treatment Unit on Map

Treatment Unit Acres (Gross)

Average Percent Slope

Number of Ash Pits to Rehabilitate

Acres of Site Preparation for Planting

1 205 12% 29 2 146 22% 17 3 136 18% 20 28

Schedule Item 2 487 66 28

GMUG NFs – Gunnison RD Page 8 of 48

Specifications or Tactics Planned for Use in the 2018 Spring Site Preparation Contract

Specification or Tactic Planned for Use?

Schedule Item(s)

C.4.2.1.1 Machine Site Preparation for Tree Planting Yes 2 C.4.2.1.2 Machine Scarification of Seedbeds for Natural Regeneration

C.4.2.1.3 Rehabilitation of Burned Slash Pile Ash Pits Yes 1, 2 C.4.2.1.4 Reworking Landing Slash Piles --- --- C.4.2.1.5 Slash Piling of Excess Amounts of Woody Debris --- --- C.4.2.1.6 Crushing Slash and Trampling Cull Trees --- ---

C.4.2.2.1 Road Opening/Clearing --- --- C.4.2.2.2 Waterbars and Rolling Dips --- --- C.4.2.2.3 Roadbed Ripping --- --- C.4.2.2.4 Road Slashing --- --- C.4.2.2.5 Road Tank Traps or Earth Berms --- --- C.4.2.2.6 Roadbed Re-contouring --- --- C.4.2.2.7 Road Mogals --- ---

C.4.2.3 Snow Removal --- ---

C.4.2.4 Other Minor “Finesse” Work Yes 3

C.2 DEFINITION OF TERMS

These definitions are given for clarification. Addition definitions and method descriptions are located in the Technical Requirements section.

Ash Pits – The footprint and area surrounding burned slash piles which includes ash, partially burned log ends, and shoulders of unburned or partially burned woody debris, and surrounding woody debris mats.

The ash pit itself is usually a depression in the ground.

Crushing - Process of breaking up, spreading, and compacting slash to reduce slash height, and spreading concentrations of slash out over a larger area by mechanical means.

Trampling - Process of knocking down cull and undesired trees, brush, and deep slash, spreading and compacting slash to reduce slash height, and spreading concentrations of slash out over a larger area by mechanical means. Trees which are trampled shall have their root systems either grubbed out of the soil or be so damaged as to eliminate the trees potential for survival.

Scarification - Process by which mineral soil is exposed and disturbed (but not displaced) by mechanical means to create an acceptable seed bed for trees. Soil is disturbed by turning on the tracks, ripping the soil with the brush rake teeth or rippers, by rocking the blade, or by moving woody debris across the ground.

GMUG NFs – Gunnison RD Page 9 of 48

Slash - All existing woody debris, including but not limited to cull logs, chunks, branches, tops, stumps from push-outs or windthrows, and broken understory trees or brush resulting from natural accumulation, timber felling, logging, thinning, and clearing. Trees severely damaged by the Contractor shall be treated as slash. Tree stumps imbedded naturally in the soil are not considered slash.

Heavy Slash Concentrations - Areas where accumulated larger-diameter slash results in piles or windrows which equal or exceed the following dimensions: average depth of two (2) feet and cover a ground surface of 100 square feet.

Slash Mats – Areas of deep, compacted, organic material generated during timber harvest operations.

Slash mats include cull logs, tops, branches, bark, foliage, and other finely ground organic material, mixed with soil. Untreated slash mats are not suitable seed beds for trees and are not practical to plant trees in.

Slash Piling - The concentrating and compacting of excess amounts of woody debris and slash such that piles may be consumed by burning. Piles must be reasonably dirt-free, compacted, and piled sufficiently tight to facilitate complete burning. Piles in some areas may be left unburned to provide habitat for wildlife.

Road Closure – Treatment to road ways to make them unusable by motorized or mechanized traffic.

The road bed is capable of vegetation production. Drainage is adequate to minimize soil erosion and sedimentation.

Road Obliteration – Treatment to road beds to make them no longer strongly evidence as a travel way, and capable of natural vegetation production. The road prism is usually recontoured back to natural slope.

Snow Removal – Removing snow from road ways to allow more rapid snow melt and drainage.

Removal is normally not down to the road surface in order to protect road surface material from erosion.

C.3 GENERAL SPECIFICATIONS

C.3.1. GOVERNMENT-FURNISHED PROPERTY

There is no Government-furnished property for this project.

C.3.2. OTHER GOVERNMENT-FURNISHED SERVICES

Erosion control seed and seed application will be provided by the Government.

C.3.3. PERSONNEL QUALIFICATIONS

All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require the Contractor to replace any employee whom the Contracting Officer determines to be incompetent, careless or otherwise objectionable.

GMUG NFs – Gunnison RD Page 10 of 48

C.3.4. PROGRESSION OF WORK

Contractor shall perform the work in a progressive, orderly manner. All road closure, site preparation, brush piling and/or crushing work on one unit shall be completed before work is started on another unit, unless wet ground conditions halts work, or if more than one piece of equipment is on the job.

Past experience in this type of site preparation and road closure work has provided insight into the expected production rates (varying some for terrain, ground condition, and needed treatments). Failure to meet expected production rates could be cause for the Contracting Officer to direct the replacement of operators or pieces of equipment, changes in methodologies, or stopping work on the contract.

C.3.5. PROTECTION OF IMPROVEMENTS AND RESOURCES

The Contractor will protect all structural improvements such as cattle guards, gates, fences, ponds, ditches, signs, and roads. The Contractor will restore any improvements damaged by the operation in a timely fashion. Improvements will be restored to pre-operation condition at the expense of the Contractor. Equipment will not cross meadows, live streams, springs, primary roads, or any other non-work areas except as designated by the Contracting Officers Representative. Movement of equipment between work areas will only be allowed on open designated roads. Cross country travel is not allowed to prevent establishment of new OHV routes.

C.3.6. ROAD DAMAGE

Vehicles shall not be operated on roads in the contract area if ground or weather conditions during operation causes lateral displacement or flowing of soil and deep rutting. Such conditions usually develop where frozen ground is thawing, when snow is melting, and during or immediately following rain storms.

C.3.7. USE OF ROADS BY THE CONTRACTOR

In addition to wet weather operating restrictions, it is the intent of this contract that the work be performed with the present system of existing roads. An existing road is one with a distinguishable roadbed that permits vehicle travel without major improvements to the road. Distinguishable roadbeds that are now reforested (have at least 300 stems/acres) with trees at least 3-feet tall, or that would require major earth work to permit vehicle travel are not considered existing roads for the purpose of this contract. Limited improvement of existing roads is permitted to allow for safe vehicle access (e.g., filling or smoothing ruts, removing roadside trees or obstacles and removing trees less than 3-feet tall or obstacles from the roadbed).

Upon written approval of the Forest Service, the Contractor may open closed roads to access a work area. Any closed roads opened by the Contractor will be returned to the closed condition in which it was found (e.g., replacing rocks, stumps or logs/slash previously scattered on the roadbed and restoring drainage or barrier structures removed or altered to permit vehicle travel).

Where seasonal road closure gates are closed to limit public motorized traffic during spring snow melt, the Contractor will be required to close and lock the gate after passing through.

GMUG NFs – Gunnison RD Page 11 of 48

C.3.8. CLEANING OF EQUIPMENT

In order to reduce the spread of noxious weeds to the project area and other public lands, crawler tractors and other equipment will be cleaned by the Contractor prior to moving the equipment onto public lands and the project area. Equipment will be cleaned of mud, dirt, and accumulations of organic material which may harbor seed or plant parts of noxious weeds. Steam cleaning is an acceptable method of reducing the import of noxious weeds. Belly pans must be cleaned prior moving in. Fluid leaks shall be repaired prior to moving onto site.

C.3.9. TRANSPORTATION OF EQUIPMENT

Equipment must be moved between work sites in such a manner as not to damage permanent road surfaces. A lowboy trailer is considered an acceptable method. Any other method must be approved in writing by the Contracting Officer. Maximum gross vehicle weight and vehicle width allowed is 82,500 lbs. and 10 feet. Equipment on a trailer may be wider, but will need to be flagged and placarded with “Over Size Load” signs per State laws. The minimum road or bridge width to be encountered on this project is twelve feet six inches. The Contractor is responsible for transporting Government furnished property or Contractor furnished property to, between, and from all work sites.

The Contractor is responsible for obtaining all necessary permits, licenses, etc., for operating and transporting equipment.

C.3.10. LEAVE TREES

In cutting units, all live trees shall be left standing to the maximum extent possible. Standing dead lodgepole pine and aspen (live or dead) 8-inches dbh and larger, and standing dead Douglas-fir and Engelmann spruce 10-inches dbh and larger, will be protected.

C.3.11. SLASH DISPOSAL

Slash resulting from work on this contract shall be removed from streams, drainages, power lines, telephone right-of-ways, private land, and from within 10-feet of property corners. Slash may be left in road ways which are to be closed. Slash falling upon cut and fill slopes along permanent open roads in the work area shall be removed from cut and fill slopes and scattered into the units in a manner so as to not form piles or windrows. Remaining slash shall be treated to lie within eighteen (18) inches of the ground.

C.3.12. PERSONAL PROTECTIVE EQUIPMENT

The contractor shall train workers in the safe operation and use of equipment that the worker may use before the worker begins using such equipment.

Personal protective equipment (PPE) including hard hats, eye protection, hearing protection, dust masks, gloves, and sturdy work boots should be worn during equipment operations. Personal protective equipment shall be maintained in a sanitary and reliable condition. Defective or damaged personal protective equipment shall not be used.

GMUG NFs – Gunnison RD Page 12 of 48

In any area where the worker is exposed to the potential for flying or falling objects, the contractor shall provide a hard hat, at no cost to the employee, and the contractor shall assure that the employee wears the hard hat. The hard hat must meet the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.

The contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects. This eye protection must meet the minimum requirements of ANSI standard Z87.1-2003.

The contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise for example, chainsaw operation.

Dust or particle masks should be worn during ash pit rehabilitation operations to minimize the inhalation of wood ash.

Refer to Occupational Safety and Health Administration (OSHA) regulations at 29 CFR 1910.266(d) Logging Operations and 29 CFR 1910 Subpart I (1910.132, 133, 135, 136, and 138).

C.3.13. CAMPING PERMITS

Work camp locations will be approved in advance by the Contracting Officers Representative with a District Ranger approved camping permit. Contractors will be required to maintain the camp site in clean, orderly, sanitary condition. Leakage of fuel and oil will be cleaned up and disposed of.

C.4 TECHNICAL REQUIREMENTS

C.4.1. EQUIPMENT SPECIFICATIONS

Past experience has shown that a D-4 to D-5 class dozer is effective for completing the required work.

Other types of heavy equipment maybe substituted for the requested type after approval by the Contracting Officer. As a minimum, other types of heavy equipment must meet the standards outlined below for crawler tractors.

Crawler Tractors

Crawler tractors must be equipped with operable Forest Service approved spark arrestor or turbo charger. As a minimum, the tractor(s) shall be equipped with an open canopy, roll-over protective structure (ROPS), logging type, including brush deflector, overhead canopy and rear screen in accordance with SAEJ-395. The tractor will also be equipped with an operable standard brush rake and track grousers (minimum of two inches high). Experience has shown that crawler tractors should be equipped with belly pan and track guards.

Engine size may range from 90 to 120 net engine H.P. Equipment smaller than 90 H.P. may not be powerful enough to complete work in a timely fashion or be able to move through stands without getting hung-up. Lighter equipment may not be able to crush woody debris or be able to pile slash as required (push and lift slash). Smaller equipment is generally more maneuverable between stumps and

GMUG NFs – Gunnison RD Page 13 of 48 residual trees. Experience has shown that a crawler tractor in the Caterpillar D-4 to D-5 size class (or equivalent size in other manufacturer lines) works best in this type operation.

The crawler tractor must be equipped with a brush rake – clearing blade (with teeth) or brush rake.

Heavy duty rock rakes with top guards to permit high piling are satisfactory. Tooth spacing shall be a maximum of 18-inches and a minimum of 12-inches between teeth. This tooth spacing is necessary to allow debris, rocks, pine cones, and dirt to filter through and not be pushed into the piles.

The dozer must be equipped with rear mounted, hydraulically lifted ripping teeth.

Other Equipment Required

a. Spark arrestor or turbo charger meeting either (I) USDA - Forest Service Standard 5100-1a: or (II) the 80 efficiency level determined according to the appropriate Society of Automotive Engineers (SAE) recommended practices J335 and J350.

b. Fire Extinguishers and Tools on Equipment - while in use, each internal combustion engine including tractors, trucks, yarders, loaders, welder, stationary engines, or comparable heavy equipment shall be provided with at least the following:

One chemical fire extinguisher meeting one of the following specifications:

1. Two and one-half pound or larger size of the dry chemical type, minimum 10: BC rating.

2. Five pound or larger size of the carbon dioxide type, minimum 10: BC rating.

One shovel, sharp, size 0 or larger, round-pointed with the handle at least 36 inches long.

One axe, sharp, double-bit 3-1/2#, or one sharp Pulaski.

Extinguishers, shovels and axes shall be mounted so as to be readily available from the ground. All tools shall be maintained in a serviceable condition.

c. Hobbs Meter.

d. Fluid Leaks – the equipment shall be free of leaking hydraulic fluid or oils. Minor leakage of fluid within normal limits may be accepted by the Contracting Officers Representative. When leakage becomes severe, the Contractor will stop operations and repair the leak. Severe leakage is where fluid reaches the ground, creating pools or stained soil. The Contractor will be responsible for cleaning up and removing fluid spills.

C.4.2. WORK SPECIFICATIONS

For the rehabilitation of burned slash pile ash pits, the treatment area is the ash pit footprint, and the area surrounding the ash pit covered by compacted woody debris (slash mats) and logging slash. The treatment of the surrounding area may extend 30 to 100-feet out from the ash pit.

GMUG NFs – Gunnison RD Page 14 of 48

The boundary of units identified for site preparation for tree planting in Schedule Items 1 and 2 have been marked by orange tree marking paint. The boundary of the machine scarification in Schedule Item 2, Unit 3 will be flagged in blue.

The specific type of treatment in a cutting unit or along a road segment will be determined by the Contracting Officers Representative based on site-specific conditions. More than one treatment method may be used in a single cutting unit or along a single road segment as site conditions dictate. Due to adverse ground conditions and desirable regeneration, some areas for non-treatment will be designated by the Contracting Officers Representative.

Not all of the different treatment sections below will be utilized during this contract. They are included to describe scenarios where a different tactic maybe employed to gain the desired result. The variety of tactics are included so that where additional “finesse” type work is encountered, the matching treatment tactic can be utilized.

C.4.2.1. Methods of Site Preparation for Reforestation and Fuels Treatment

C.4.2.1.1 Machine Site Preparation for Tree Planting

This is a treatment where spots of bare soil are created which will be free of competing vegetation, and suitable for hand planting of tree seedlings. The hand planting may be by planting tools such as the “hoedad”, planting tool, shovel, or powered auger. Trees are planted at a spacing of six to fourteen-feet depending on the availability of good planting spots with acceptable microsites, tree species, aspect and slope of the ground.

Mechanized treatment will be necessary in areas covered by deep, dense sod, sedge, grass, and forb cover, or areas covered by slash mats and logging slash. Planting spots will need to be at least 18 to 24-inches across. Planting spots will need to be spaced out at six to twelve-foot intervals. Potential planting spots occupied by living tree seedlings and saplings do not need to be treated. Where the soil and vegetation has been well disturbed during timber harvest operations, and planting spots are available, site preparation is not necessary.

In areas where slash mats are present, the organic material will be spread out and spots of mineral soil exposed for reforestation requirements. Some mounding of organic material is acceptable when necessary to expose mineral soil. Do not allow organic material from slash mats to be incorporated into slash piles to be burned. Where slash mats are adjacent to roads to be closed, the fine organic material can be spread across the road. The road bed should be ripped prior or during slash mat spread to reduce soil compaction in the road bed and help work fine organic material into the soil. Be wary of short logs and high stumps hidden in the slash mat.

Planting beds for seedlings may be created by disturbing the soil surface by turning on the tracks, ripping the soil with the brush rake or rippers, digging and scalping with the blade, by rocking/dipping the blade, by digging or dragging as excavator bucket across the ground, or by moving woody debris across the ground.

GMUG NFs – Gunnison RD Page 15 of 48

C.4.2.1.2 Machine Scarification of Seedbeds for Natural Regeneration

For most conifer tree species, bare mineral soil is necessary for natural tree seed to land on in order for consistent, adequate seed germination and seedling establishment. Scarification is the process by which mineral soil is exposed and disturbed (but not displaced) by mechanical means to create an acceptable seed bed for trees. Soil is disturbed by turning on the tracks, ripping the soil with the brush rake teeth or rippers, by digging or dragging an excavator bucket across the ground, by rocking/dipping the blade, or by moving woody debris across the ground.

In areas of treatment units unoccupied by desired trees, it is desired that a minimum of forty (40) percent of the ground be in exposed and disturbed mineral soil seedbeds. Where slope exceeds thirty

(30) percent and scarification is directed, the area to be treated is twenty-five (25) percent of the ground surface. Soil is to be disturbed, but not displaced. The scarification is to be scattered across the entire treatment area. Where desired trees are close together, do not treat those areas. Do not scarify the soil under the drip line of the crowns of desired overstory trees (usually within ten-feet of overstory tree boles) to avoid damage to root systems.

At the discretion of the Contracting Officers Representative, treatment of specific steep areas will not be conducted to protect resources. Areas with considerable surface rock which are not conducive to machine scarification, and areas which were sufficiently scarified during logging, will be identified by the Forest Service for non-treatment.

In partial cut stands, most of the residual trees are desired for retention. Protect advanced regeneration and desired trees, but do grub out or machine trample cull trees. Areas of desirable dense seedlings and saplings will be identified by the Contracting Officers Representative to be avoided. In general, lodgepole pine, Douglas-fir, spruce, fir, and aspen trees should be protected.

In areas where slash mats are present, the organic material will be spread out and spots of mineral soil exposed for reforestation requirements. Some mounding of organic material is acceptable when necessary to expose mineral soil. Do not allow organic material from slash mats to be incorporated into slash piles to be burned. Where slash mats are adjacent to roads to be closed, the fine organic material can be spread across the road. The road bed should be ripped prior or during slash mat spread to reduce soil compaction in the road bed and help work fine organic material into the soil. Be wary of short logs and high stumps hidden in the slash mat.

Where roads are identified for closure under this contract, logs and slash mat material may be scattered across the road way to aid in closure.

C.4.2.1.3 Rehabilitation of Burned Slash Pile Ash Pits

In areas where slash piles have been burned in recent years, ash pits exist which will not naturally vegetate for a prolonged period of time. These untreated ash pits do tend to be preferred by several species of undesirable noxious weeds to become established in an area. The ripping and mixing of the ash pit is intended to break-up and mix heat sterilized soil such that desirable vegetation will become established. The established desirable vegetation will deter noxious weed establishment.

GMUG NFs – Gunnison RD Page 16 of 48

For the rehabilitation of burned slash pile ash pits, the treatment area is the ash pit footprint, and the area surrounding the ash pit covered by compacted woody debris (slash mats) and logging slash. The treatment of the surrounding area may extend 30 to 100-feet out from the ash pit.

The Contractor will rip the charcoal bed and soil below, break up surrounding woody debris slash mats, stir and mix the ash, soil, and woody debris, smooth out humps and piles of dirt and ash, scatter remaining logs and poorly burned log ends across the burned area, and scatter/crush remaining fuels in the area.

C.4.2.1.4 Reworking Landing Slash Piles

Landing slash piles which have been ignited, but burned poorly, or did not ignite at all will benefit from being reworked or repiled. Some slash piles and cull log decks were not well compacted during timber harvest operations. These cull log decks are to be burned to reduce the volume of woody debris in the area. There are uneven log ends on the cull log decks which will not burn well and will become burned log ends or chunks.

The Contractor will pile the cull logs into or onto landing slash piles with the heavy equipment. Slash piles will be compacted and pushed up to improve consumability of the debris. The Forest Service may provide chainsaw support to break-up the length of cull logs to facilitate piling.

Logging slash piles commonly have a deep slash mat apron around the pile. Fine organic material in slash piles will smolder for a prolonged period of time, which could create air pollution issues later on.

Woody debris in slash mats has been observed to smolder and “charcoal” for months, creating the potential for an escaped fire. Use the blade/rake to work the fine organic material back away from the slash pile. Do not push the fine organic material into the pile.

C.4.2.1.5 Slash Piling of Excess Amounts of Woody Debris

Slash piling is the concentrating and compacting of excess amounts of slash or woody debris such that the piles may be consumed by burning. Piles must be reasonably dirt-free, compacted, and piled sufficiently tight to facilitate complete burning. Piles in certain areas may be left unburned to provide habitat for wildlife. It is not desired that 100% of woody debris be piled. Light or scattered amounts of woody debris is okay to be left unpiled on site as long as the debris is within eighteen (18) inches of the ground.

Where specified by the Forest Service, the Contractor shall uniformly pile sixty (60) to eighty (80) percent of existing larger-sized slash. Logs larger than 6-inches in diameter, measured at the large end, shall be piled for burning, except that up to 20 logs per acre may be left unpiled provided they are well-scattered, touch the ground for their full length and are not attached to a root wad. Excess slash and logs, including cull standing timber and snags except designated leave trees, shall be moved into piles. It is desired that much of the needles, small twigs and branches, cones, litter, and duff be left on site, unpiled, for nutrient cycling, erosion control, and for a seed source (cones). Undesired live trees will be grubbed out of the ground and piled for disposal, or have their root systems so damaged that the potential for survival is nil. All remaining slash shall be treated to lie within eighteen (18) inches of the ground. At least forty (40) percent of the ground surface shall be scarified, that is, the soil is to be disturbed, but not displaced.

GMUG NFs – Gunnison RD Page 17 of 48

In areas with slopes greater than thirty (30) percent, the Contractor may have the option of either crushing or piling the steeper ground. All remaining slash shall be treated to lie within eighteen (18) inches of the ground and leave twenty-five (25) percent of the ground surface scarified, that is, the soil is to be disturbed, but not displaced. At the discretion of the Contracting Officers Representative, treatment of specific steep areas will not be conducted to protect resources.

Piles to be burned shall be a minimum of 8-feet wide by 6-feet high and 8 and 20-feet long. When it can be done safely, slash shall be piled on the contour rather than parallel to the slope of steep ground to avoid erosion of the soil. Piles must be reasonably dirt-free, compacted, and piled sufficiently tight, steep-sided, and pushed as tall as the equipment will allow in order to facilitate complete burning. Fine organic material from slash mats will not be incorporated into slash piles. If necessary, slash piles will be reworked to reduce the amount of dirt and fine-organic material included in the pile.

Stumps shall not be grubbed out of the ground and incorporated into slash piles due to the amount of dirt. Root wads from down trees will not be included in piles unless old and dirt-free.

Smaller piles of debris may be built and/or left as directed by the Contracting Officers Representative for wildlife habitat.

Piles of slash to be burned shall be located so that burning operations will not damage desirable standing live trees. Piles shall not be constructed within a 100-foot of the edge of units, or within 100 feet of drainage ditches, or within high water marks of live and intermittent streams. All units will be piled in such a manner that after treatment, heavy slash concentrations shall not exist unless otherwise directed by the Contracting Officers Representative.

Experience has shown that treatment of slash mats normally turns up a number of short logs which if in excessive amounts will need to be piled for disposal. The logs will need to be separated from the fine organic debris and dirt during piling to provide for cleaner burning, dirt-free piles. There also tends to be high stumps hidden under slash mats which the operator will need to be careful to avoid for high centering or damaging the equipment.

C.4.2.1.6 Crushing Slash and Trampling Cull Trees

Crushing is the process of breaking up, spreading, and compacting slash to reduce slash height, and spreading concentrations of slash out over a larger area by mechanical means.

Trampling is the process of knocking down standing cull and undesired trees, brush, and deep slash;

spreading and compacting slash to reduce slash height, and spreading concentrations of slash out over a larger area by mechanical means. Trees which are trampled shall have their root systems either grubbed out of the soil or be so damaged as to eliminate the trees potential for survival.

Crushing and trampling of woody debris may be used where heavy slash concentrations do not exist, and most of the slash is comprised of debris less than 6-inches diameter at the large end. Slash shall be treated to lie within eighteen (18) inches of the ground. Where crushing and trampling is used, areas will be treated in such a manner that after treatment, heavy slash concentrations shall not exist, unless

GMUG NFs – Gunnison RD Page 18 of 48 otherwise directed by the Contracting Officers Representative. Small piles of debris may be built and/or left as directed by the Contractor Officers Representative for wildlife habitat.

C.4.2.2 Methods and Features for Road Maintenance, Road Closure and Road Obliteration

Road closure locations and methods may be designated on the ground by the Forest Service using pin flags or plastic flagging, or as directed by the Contracting Officers Representative.

Ripping and slashing are commonly used together in road closure work. Ripping the roadbed is intended to reduce soil compaction, rehabilitate the soil to a vegetative productive condition, and to make the soil surface receptive to grass and tree seed. Slashing is intended to eliminate the use of the roadbed by motorized and mechanized traffic. Waterbars are installed or maintained during the process for erosion control.

Drainage crossings will be treated to provide for water flow with minimized erosion and sedimentation.

Roads which will be left open to public motorized and mechanized use will be maintained to reduce soil erosion. In general, maintenance will be by installing or improving waterbars, rolling dips, and drainage ditches. The size and shape of drainage facilities will be such to remain effective for an extended period of time while allowing passage by normal high clearance highway vehicles operated by prudent drivers.

A minimal amount of road surface blading may be conducted as necessary and practical considering the type of heavy equipment used in the contract work, such as a dozer back blading with a swing brush rake.

The Forest Service may provide chainsaw support for the Contractor during closure operations and apply erosion control seed as needed.

C.4.2.2.1 Road Opening/Clearing

Level road closure berms or tank traps, move obstructing slash, stumps, logs, rocks and other debris off to the side to allow full-sized motor vehicles to safely operate on the roadway. Waterbars and rolling dips will be cleared and made functional. A minimum of road surface blading will be conducted only as needed to facilitate traffic. Otherwise leave “grassed over” road surfaces alone and use the equipment tracks to “smooth” the road surface. Road slashing materials should be conserved at the side of the road for future reuse in closing the roadway.

C.4.2.2.2 Waterbars and Rolling Dips

Water bars are earthen berms installed in a road way or exposed area with the intention of deflecting moving water off to the side of the road and into vegetated areas, thus minimizing soil movement and erosion. The road way may or may not be closed to motorized and mechanized travel. The berm is usually installed at a 30o to 45o angle to the slope. Where waterbars exist, the Contractor will clean out the dip and outlet to maintain functionality. On open roads, the equipment operator will compact the berm by running over it several times during construction to firm the feature up to motor vehicle passage.

GMUG NFs – Gunnison RD Page 19 of 48

While waterbars may be somewhat short and abrupt, rolling dips are longer (often 20 to 40 feet) to allow vehicles towing trailers to cross, or facilitate higher speeds. Same principle, just longer and larger.

See “Exhibit 3 - Waterbar” for a display of the waterbars and rolling dips.

Location and spacing of waterbars will depend on the soil type and grade of the road. It best to divert water early before it has an opportunity to flow, increase in volume, and increase in speed. Often a waterbar near the top of a grade are more efficient than waterbars further down the slope.

C.4.2.2.3 Roadbed Ripping

Rip the roadbed with rippers or brush rake teeth to break-up soil compaction and roughen the road surface. The ripped road surface will be more receptive to grass and tree seed establishment. Surface water flow is disrupted on the road surface, reducing the soil erosion potential. The intent is to return the roadbed to vegetative production and assist in preventing motorized or mechanized use. The road closure may be for a short number of years, or a permanent closure. Ripping is commonly applied along the entire length of the road segment except where the road surface is already revegetated or is too rocky to rip. Pulling up rocks helps in discouraging vehicle traffic. Ripping should be as deep as the equipment will allow.

Short of full road re-contouring, during the ripping process, as much of the fill material on the downhill side of the road is to be pulled back up onto the roadbed. Realistically, the amount of fill to be drifted back up will be dependent on the type of heavy equipment in use and whether or not a brush rake or straight dozer blade is installed. It is not necessary that drifted fill material be spread and smoothed.

Mounds and windrows of soil will be acceptable as long as water flow or erosion control is not compromised. Woody debris and rocks maybe mixed into the drifted material.

Waterbars will be installed or maintained to minimize water flowing across the disturbed surface for erosion control. Waterbar frequency or spacing will be dependent on soil type, cross slope, and road grade. Steeper slopes and road grades will necessitate closer waterbar spacing to divert water from the disturbed area.

C.4.2.2.4 Road Slashing

Placement of logs, slash, stumps, and rocks on a roadbed to prevent motorized and mechanized use.

The roadbed prism may or may not be left intact for future reopening and use. Felling or pushing over nearby trees often provides the woody debris necessary to close the roadway to use. Caution is required to avoid creating a situation where Off Road Vehicles are able to pioneer new travel ways adjacent to closed routes because all the obstructing materials are placed in the closed road. Commonly the entire length of road segment to be closed will be treated as needed to prevent use and avoid erosion.

C.4.2.2.5 Road Tank Traps or Earth Berms

Large, tall, abrupt, and steep-sided earthen berms installed with the intention of closing road ways to motorized and mechanized use. Placement of rocks, logs, stumps and slash enhance the road closure effectiveness. The roughened surface will be receptive to grass and tree seed for revegetation. Earth

GMUG NFs – Gunnison RD Page 20 of 48

Berms also act as waterbars for erosion control. Tank traps are usually one of several road closure features utilized on a road segment. See “Exhibit 3 - Earth Berms” for an illustration.

C.4.2.2.6 Roadbed Re-contouring

Restoring an excavated roadbed prism back to full vegetative productivity by pulling road fill material up on to the roadbed and cut slope, thus returning the ground line back to the natural contour. Prior to re-contouring, the roadbed will be ripped to reduce soil compaction. Logs, slash, stumps, and rocks are placed on the roadbed to further discourage and prevent motorized and mechanized use.

C.4.2.2.7 Road Mogals

A random pattern of divits and soil mounds along a road way segment produced by an excavator or backhoe with the intention of physically closing a roadbed to motorized and mechanized use. Slash, logs, stumps and rocks are placed in the roadway to further discourage vehicular use. The mogal road surface will be more receptive to grass and tree seed establishment. Surface water flow is disrupted on the road surface, reducing the soil erosion potential. See “Exhibit 3 - Mogals” for an illustration of mogal Installation.

C.4.2.3 Snow Removal

Snow removal is to allow more rapid snow melt and drainage such that the roadbed will firm-up earlier to normal vehicle traffic. It is assumed that normal vehicles will not be using the road way immediately.

Blade overburden snow from road ways to the downhill side of the road. Removal is normally not to the road surface in order to protect road surface material from erosion. Usually blading to within four to six-inches of the road surface is adequate. Commonly, at that depth is an ice lens, which protects the surface that can be left.

Snow berms will be broken at intervals to facilitate drain water getting off the road way. Make berm breaks at culvert inlet/outlets, in rolling dips, and low natural drain points.

Where snow depth is shallow and drifted snow is not present, simply running the equipment on the snow blade up will break-up the snow pack and accelerate melting.

C.4.2.4 Other Minor “Finesse” Work

Other minor amounts of unspecified equipment work may requested by the Contracting Officers Representative while the equipment is in the project area, if contract time allows, and if the minor work is agreed to by the Contractor. Minor “finesse” work could include, but is not limited to, items such as installing or maintaining erosion control facilities away from roads and cutting units, cleaning up other slash concentrations, or closing jeep trails.

This is the start of the file's text. The full file is on GovTribe.