Attachment_2_-_Drawings.pdf
PDF 3 MB Posted
- Attached to
- Moscow Parking Lot Renovation Federal contract opportunity
- Solicitation number
- 1282FT19R4002
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1282FT19R40002AME0001.pdf | ||
| Attachment_1_-_Specifications.pdf | ||
| Solicitation_1282FT19R4002.pdf | ||
| Attachment_3_-_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LABORATORY LOCATION
VICINITY MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture
Forest Service
MOSCOW LAB
Project located at 1221 South Main Street in Moscow, Idaho.
GREAT DIVIDE DISTRICT OFFICE
22223 STATE HIGHWAY 13
GLIDDEN, WI 54527
PARKING LOT RENOVATION
RECOMMENDED BY:
STATION ENGINEER
DATE
5/8 /19
1:
F
MC
AR
TH
UR
F :\P
RO
JE
CT
S\
MO
SC
OW
D
RI
VE
W
AY
\C
OV
ER
SH
EE
T.
DW
G;
(S22) ROCKY MTN. RESEARCH STATION
MOSCOW FORESTRY SCIENCES LABORATORY
LATAH COUNTY
IDAHO
INDEX OF SHEETS
SHEET SHEET TITLE DATE
1 COVERSHEET
2 Site Plan
3 Site Plan - North East Corner
4 Site Plan - Northwest Corner
5 Site Plan - Southeast corner
6 Details
Stripping Plan
Stripping Plan Details
9 Photos of Site
5/07/2019
Main Lab
Bldg
Flam
Bldg.
Warehouse
East
Greenhouse
Shop
Engineering Bldg
West
Greenhouse
Shop Bldg
Annex
M a i n
S t r e e t
U
S
H i g h w a y
Talyor Ave
Front Parking
Annex
Parking
Northwest
Parking Lot
Southwest
Parking Lot
ADA Parking
SCALE: 1" = 60'
15' 30'0 60'
121'-10"
Site Plan
1. The main entrance asphalt has been heaved by the roots of the trees adjacent to the driveway. Remove the existing asphalt, and base material. Remove organic material including tree roots, at least 2 feet below finished grade. Regrade from sidewalk to a point roughly 75 feet from sidewalk for smooth transition to the street.
2. Remove asphalt down to base material and repave to ensure that water flows to the storm drain from the corner.
3. Remove the existing asphalt in these locations
(areas to be marked on ground) down to base material and repave areas.
4. Remove asphalt, base, and sub-base material in these areas and contour the ground to facilitate moisture runoff to natural areas or drains. In addition, reseed the area with native seeds.
5. Remove existing asphalt and concrete in this area and install new concrete Valley pan that directs water to the existing drain.
6. All the asphalt paved areas on the site are to be cleaned, crack sealed, and then slurry sealed to extend the life of the of parking lot.
Upon completion of the slurry seal, all parking areas are to be new stripped.
7. Remove the three trees that are adjacent to entrance way.
KEY NOTES:
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/8 /19
:4
9 F
MC
AR
TH
UR
F
:\P
RO
JE
CT
S\
MO
SC
OW
D
RI
VE
W
AY
\F
S2
6_
MO
_P
AR
KI
NG
_L
OT
_0
9.D W
G;
S22 Rocky Mtn. Research Station
Moscow Lab Parking Lot Renovation
RMRS
Moscow Forestry Sciences Laboratory
SITE PLAN
04/26/2019
FS2216_MO_Parking_Lot_04262019.dwg
F.McArthur
F.McArthur
X.XXX
A-01
009002
AutoCAD SHX Text Bike Storage
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
Front Parking
L e n g t h
1. The main entrance asphalt has been heaved by the roots of the trees adjacent to the driveway. Remove the existing asphalt, and base material. Remove organic material including tree roots, at least 2 feet below finished grade. Regrade from sidewalk to a point roughly 75 feet from sidewalk for smooth transition to the street.
2. Remove asphalt down to base material and repave to ensure that water flows to the storm drain from the corner.
3. Remove the existing asphalt in these locations
(areas to be marked on ground) down to base material and repave areas.
4. Remove asphalt, base, and sub-base material in these areas and contour the ground to facilitate moisture runoff to natural areas or drains. In addition, reseed the area with native seeds.
5. Remove existing asphalt and concrete in this area and install new concrete Valley pan that directs water to the existing drain.
6. All the asphalt paved areas on the site are to be cleaned, crack sealed, and then slurry sealed to extend the life of the of parking lot.
Upon completion of the slurry seal, all parking areas are to be new stripped.
7. Remove the three trees that are adjacent to entrance way.
KEY NOTES:
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/8 /19
:4
9 F
MC
AR
TH
UR
F
:\P
RO
JE
CT
S\
MO
SC
OW
D
RI
VE
W
AY
\F
S2
6_
MO
_P
AR
KI
NG
_L
OT
_0
9.D W
G;
S22 Rocky Mtn. Research Station
Moscow Lab Parking Lot Renovation
RMRS
Moscow Forestry Sciences Laboratory
SITE PLAN - Northeast Corner
04/26/2019
FS2216_MO_Parking_Lot_04262019.dwg
F.McArthur
F.McArthur
X.XXX
A-02
009003
Northeast Corner Of Property
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Flam
Bldg.
Engineering Bldg
Shop Bldg
Northwest
Parking Lot
Southwest
Parking Lot
121'-10"
9'-11"
1. The main entrance asphalt has been heaved by the roots of the trees adjacent to the driveway. Remove the existing asphalt, and base material. Remove organic material including tree roots, at least 2 feet below finished grade. Regrade from sidewalk to a point roughly 75 feet from sidewalk for smooth transition to the street.
2. Remove asphalt down to base material and repave to ensure that water flows to the storm drain from the corner.
3. Remove the existing asphalt in these locations
(areas to be marked on ground) down to base material and repave areas.
4. Remove asphalt, base, and sub-base material in these areas and contour the ground to facilitate moisture runoff to natural areas or drains. In addition, reseed the area with native seeds.
5. Remove existing asphalt and concrete in this area and install new concrete Valley pan that directs water to the existing drain.
6. All the asphalt paved areas on the site are to be cleaned, crack sealed, and then slurry sealed to extend the life of the of parking lot.
Upon completion of the slurry seal, all parking areas are to be new stripped.
7. Remove the three trees that are adjacent to entrance way.
KEY NOTES:
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/8 /19
:4
9 F
MC
AR
TH
UR
F
:\P
RO
JE
CT
S\
MO
SC
OW
D
RI
VE
W
AY
\F
S2
6_
MO
_P
AR
KI
NG
_L
OT
_0
9.D W
G;
S22 Rocky Mtn. Research Station
Moscow Lab Parking Lot Renovation
RMRS
Moscow Forestry Sciences Laboratory
SITE PLAN -Northwest Corner
04/26/2019
FS2216_MO_Parking_Lot_04262019.dwg
F.McArthur
F.McArthur
X.XXX
A-03
009004
Northwest Corner Of Property
AutoCAD SHX Text Bike Storage
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
East
Greenhouse
Shop
Annex
Annex
Parking
ADA Parking
19'-10"
14'-4"
1. The main entrance asphalt has been heaved by the roots of the trees adjacent to the driveway. Remove the existing asphalt, and base material. Remove organic material including tree roots, at least 2 feet below finished grade. Regrade from sidewalk to a point roughly 75 feet from sidewalk for smooth transition to the street.
2. Remove asphalt down to base material and repave to ensure that water flows to the storm drain from the corner.
3. Remove the existing asphalt in these locations
(areas to be marked on ground) down to base material and repave areas.
4. Remove asphalt, base, and sub-base material in these areas and contour the ground to facilitate moisture runoff to natural areas or drains. In addition, reseed the area with native seeds.
5. Remove existing asphalt and concrete in this area and install new concrete Valley pan that directs water to the existing drain.
6. All the asphalt paved areas on the site are to be cleaned, crack sealed, and then slurry sealed to extend the life of the of parking lot.
Upon completion of the slurry seal, all parking areas are to be new stripped.
7. Remove the three trees that are adjacent to entrance way.
KEY NOTES:
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/8 /19
:4
9 F
MC
AR
TH
UR
F
:\P
RO
JE
CT
S\
MO
SC
OW
D
RI
VE
W
AY
\F
S2
6_
MO
_P
AR
KI
NG
_L
OT
_0
9.D W
G;
S22 Rocky Mtn. Research Station
Moscow Lab Parking Lot Renovation
RMRS
Moscow Forestry Sciences Laboratory
SITE PLAN - Southeast Corner of Lot
04/26/2019
FS2216_MO_Parking_Lot_04262019.dwg
F.McArthur
F.McArthur
X.XXX
A-04
009005
Southeast Corner of Lot
AutoCAD SHX Text Bike Storage
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
NEW ASPHALT 3" MINIMUM
1' KEY-IN1' KEY-IN
SAW CUT
AND TACK
SAW CUT
AND TACK
1. THE PAVEMENT EDGE SHALL BE DEFINED BY A STRAIGHT EDGE FORMED BY A MACHINED SAW CUT.
THE ASPHALT BE LESS THAN 3" THICK.
DRUM ROLLER TO ACHIEVE A SMOOTH, LEVEL PATCH.
6. THE ASPHALT PAVEMENT MATERIAL SHALL BE INSTALLED AND COMPACTED THOROUGHLY AND ROLLED WITH A SMOOTH
NOTES:
T-99 AS MODIFIED BY NCDOT.
3. THE FINAL 1' OF FILL SHALL CONSIST OF ABC MATERIAL COMPACTED TO A DENSITY EQUAL TO 100% OF THAT
OBTAINED BY COMPACTING A SAMPLE OF THE MATERIAL IN ACCORDANCE WITH AASHTO T-80 AS
4. THE ENTIRE THICKNESS/VERTICAL EDGE OF THE CUT SHALL BE TACKED.
OF AT LEAST 95% OF THAT OBTAINED BY COMPACTING A SAMPLE OF THE MATERIAL IN ACCORDANCE WITH AASHTO
2. THE TRENCH SUBGRADE MATERIAL SHALL BE BACKFILLED WITH SUITABLE MATERIAL AND COMPACTED TO A DENSITY
5. THE SAME DEPTH OF PAVEMENT MATERIAL WHICH EXISTS SHALL BE REINSTALLED, BUT IN NO CASE SHALL
EXISTING PAVEMENT
EXISTING PAVEMENT
EXISTING SUBGRADE
EXISTING ABC
EXISTING ABC
NEW ABC 12" MINIMUM DEPTH
MODIFIED BY NCDOT. BITUMINOUS BASE OR BINDER MAY BE SUBSTITUTED IF APPROVED BY TRANSPORTATION
DIRECTOR OR DESIGNEE.
3'-0"
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/8 /19
:4
9 F
MC
AR
TH
UR
F
:\P
RO
JE
CT
S\
MO
SC
OW
D
RI
VE
W
AY
\F
S2
6_
MO
_P
AR
KI
NG
_L
OT
_0
9.D W
G;
S22 Rocky Mtn. Research Station
Moscow Lab Parking Lot Renovation
RMRS
Moscow Forestry Sciences Laboratory
PARKING LOT REPAIR
DETAILS
04/26/2019
FS2216_MO_Parking_Lot_04262019.dwg
F.McArthur
F.McArthur
X.XXX
A-05
009006
Not to Scale
Asphalt Patch Detail
Not to Scale
Valley Pan Detail
Not to Scale
Detail for Area Asphalt is Removed
AutoCAD SHX Text Pavement
AutoCAD SHX Text 6" of crushed aggregate
AutoCAD SHX Text Install 2 #4 rebar 3" off the bottom & 8" from edge
AutoCAD SHX Text New 4" of Topsoil & Seeding.
AutoCAD SHX Text 6" of backfill material or to bottom of excavated material from asphalt removal.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Engineering Bldg
West
Greenhouse
Shop Bldg
Shop
East
Greenhouse
Flam
Bldg.
Annex
Warehouse
Talyor Ave
M a i n
S r e e
U
S
H i g h w a y
1. Pavement markings shall be painted to the widths, lengths, and locations as shown on the plans.
2. Pavement markings for all symbols shall use stencil or thermoplastic markings.
3. All markings shall be yellow latex traffic paint or approved equal, except for accessible parking lot markings shall be blue latex paint.
4. Asphalt surfaces shall be properly cured before applying and pavement markings.
5. Asphalt surfaces shall be dry, clean, and free of contaminants such as surface oils.
Pavement Marking Notes
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/8 /19
:4
9 F
MC
AR
TH
UR
F
:\P
RO
JE
CT
S\
MO
SC
OW
D
RI
VE
W
AY
\F
S2
6_
MO
_P
AR
KI
NG
_L
OT
_0
9.D W
G;
S22 Rocky Mtn. Research Station
Moscow Lab Parking Lot Renovation
RMRS
Moscow Forestry Sciences Laboratory
PARKING LOT
STRIPPING PLAN
04/26/2019
FS090523_R102013_L1-002.dwg
F.McArthur
F.McArthur
X.XXX
A-06
009007
Scale: 1" = 60'
Large Site Plan for Striping
AutoCAD SHX Text Bike Storage
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
9'-0" 9'-0"
9'-0"
9'-0"
Main Lab
Bldg
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/8 /19
:4
9 F
MC
AR
TH
UR
F
:\P
RO
JE
CT
S\
MO
SC
OW
D
RI
VE
W
AY
\F
S2
6_
MO
_P
AR
KI
NG
_L
OT
_0
9.D W
G;
S22 Rocky Mtn. Research Station
Moscow Lab Parking Lot Renovation
RMRS
Moscow Forestry Sciences Laboratory
PARKING LOT
STRIPPING PLAN
DETAILS
04/26/2019
FS090523_R102013_L1-002.dwg
F.McArthur
F.McArthur
X.XXX
A-07
009008
Southeast Parking Lot
Southeast Annex Parking Lot
Northwest Parking Lots
Front Parking Lot
Back Parking Lot
AutoCAD SHX Text Bike Storage
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/8 /19
:4
9 F
MC
AR
TH
UR
F
:\P
RO
JE
CT
S\
MO
SC
OW
D
RI
VE
W
AY
\F
S2
6_
MO
_P
AR
KI
NG
_L
OT
_0
9.D W
G;
S22 Rocky Mtn. Research Station
Moscow Lab Parking Lot Renovation
RMRS
Moscow Forestry Sciences Laboratory
PHOTOS OF SITE
04/26/2019
FS2216_MO_Parking_Lot_04262019.dwg
F.McArthur
F.McArthur
X.XXX
A-08
009009
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text Remove & Patch so water flows to drain.
AutoCAD SHX Text Remove & Patch
AutoCAD SHX Text Remove & Patch
AutoCAD SHX Text Remove & Patch
AutoCAD SHX Text Remove & Patch
AutoCAD SHX Text Remove Asphalt & grade & seed
AutoCAD SHX Text Remove & Regrade & New Asphalt
AutoCAD SHX Text Remove Trees
AutoCAD SHX Text Remove Asphalt & Regrade with new soil & seed
AutoCAD SHX Text Remove Asphalt & grade & Seed
AutoCAD SHX Text New Valley Pan
AutoCAD SHX Text New Valley Pan
Remove Asphalt & Regrade with new soil & seed
| Sheets and Views |
| FS2216_MO_Parking_Lot_04262019-Site Plan |
| FS2216_MO_Parking_Lot_04262019-Site Plan - NE |
| FS2216_MO_Parking_Lot_04262019-Site Plan - NW |
| FS2216_MO_Parking_Lot_04262019-Site Plan - SE |
| FS2216_MO_Parking_Lot_04262019-Details |
| FS2216_MO_Parking_Lot_04262019-Stripping Plan |
| FS2216_MO_Parking_Lot_04262019-Stripping Plan Detail |
| FS2216_MO_Parking_Lot_04262019-Photos |
| Coversheet.pdf |
| Sheets and Views |
| COVERSHEET |
| OLE1 |
File details come from the government source that posted it.