Attachment_2_-_Drawings.pdf

PDF 3 MB Posted

Attached to
Moscow Parking Lot Renovation Federal contract opportunity
Solicitation number
1282FT19R4002
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Moscow Parking Lot Renovation, newest first.
File Type Posted
1282FT19R40002AME0001.pdf PDF
Attachment_1_-_Specifications.pdf PDF
Solicitation_1282FT19R4002.pdf PDF
Attachment_3_-_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LABORATORY LOCATION

VICINITY MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture

Forest Service

MOSCOW LAB

Project located at 1221 South Main Street in Moscow, Idaho.

GREAT DIVIDE DISTRICT OFFICE

22223 STATE HIGHWAY 13

GLIDDEN, WI 54527

PARKING LOT RENOVATION

RECOMMENDED BY:

STATION ENGINEER

DATE

5/8 /19

1:

F

MC

AR

TH

UR

F :\P

RO

JE

CT

S\

MO

SC

OW

D

RI

VE

W

AY

\C

OV

ER

SH

EE

T.

DW

G;

(S22) ROCKY MTN. RESEARCH STATION

MOSCOW FORESTRY SCIENCES LABORATORY

LATAH COUNTY

IDAHO

INDEX OF SHEETS

SHEET SHEET TITLE DATE

1 COVERSHEET

2 Site Plan

3 Site Plan - North East Corner

4 Site Plan - Northwest Corner

5 Site Plan - Southeast corner

6 Details

Stripping Plan

Stripping Plan Details

9 Photos of Site

5/07/2019

Main Lab

Bldg

Flam

Bldg.

Warehouse

East

Greenhouse

Shop

Engineering Bldg

West

Greenhouse

Shop Bldg

Annex

M a i n

S t r e e t

U

S

H i g h w a y

Talyor Ave

Front Parking

Annex

Parking

Northwest

Parking Lot

Southwest

Parking Lot

ADA Parking

SCALE: 1" = 60'

15' 30'0 60'

121'-10"

Site Plan

1. The main entrance asphalt has been heaved by the roots of the trees adjacent to the driveway. Remove the existing asphalt, and base material. Remove organic material including tree roots, at least 2 feet below finished grade. Regrade from sidewalk to a point roughly 75 feet from sidewalk for smooth transition to the street.

2. Remove asphalt down to base material and repave to ensure that water flows to the storm drain from the corner.

3. Remove the existing asphalt in these locations

(areas to be marked on ground) down to base material and repave areas.

4. Remove asphalt, base, and sub-base material in these areas and contour the ground to facilitate moisture runoff to natural areas or drains. In addition, reseed the area with native seeds.

5. Remove existing asphalt and concrete in this area and install new concrete Valley pan that directs water to the existing drain.

6. All the asphalt paved areas on the site are to be cleaned, crack sealed, and then slurry sealed to extend the life of the of parking lot.

Upon completion of the slurry seal, all parking areas are to be new stripped.

7. Remove the three trees that are adjacent to entrance way.

KEY NOTES:

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/8 /19

:4

9 F

MC

AR

TH

UR

F

:\P

RO

JE

CT

S\

MO

SC

OW

D

RI

VE

W

AY

\F

S2

6_

MO

_P

AR

KI

NG

_L

OT

_0

9.D W

G;

S22 Rocky Mtn. Research Station

Moscow Lab Parking Lot Renovation

RMRS

Moscow Forestry Sciences Laboratory

SITE PLAN

04/26/2019

FS2216_MO_Parking_Lot_04262019.dwg

F.McArthur

F.McArthur

X.XXX

A-01

009002

AutoCAD SHX Text Bike Storage

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

Front Parking

L e n g t h

1. The main entrance asphalt has been heaved by the roots of the trees adjacent to the driveway. Remove the existing asphalt, and base material. Remove organic material including tree roots, at least 2 feet below finished grade. Regrade from sidewalk to a point roughly 75 feet from sidewalk for smooth transition to the street.

2. Remove asphalt down to base material and repave to ensure that water flows to the storm drain from the corner.

3. Remove the existing asphalt in these locations

(areas to be marked on ground) down to base material and repave areas.

4. Remove asphalt, base, and sub-base material in these areas and contour the ground to facilitate moisture runoff to natural areas or drains. In addition, reseed the area with native seeds.

5. Remove existing asphalt and concrete in this area and install new concrete Valley pan that directs water to the existing drain.

6. All the asphalt paved areas on the site are to be cleaned, crack sealed, and then slurry sealed to extend the life of the of parking lot.

Upon completion of the slurry seal, all parking areas are to be new stripped.

7. Remove the three trees that are adjacent to entrance way.

KEY NOTES:

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/8 /19

:4

9 F

MC

AR

TH

UR

F

:\P

RO

JE

CT

S\

MO

SC

OW

D

RI

VE

W

AY

\F

S2

6_

MO

_P

AR

KI

NG

_L

OT

_0

9.D W

G;

S22 Rocky Mtn. Research Station

Moscow Lab Parking Lot Renovation

RMRS

Moscow Forestry Sciences Laboratory

SITE PLAN - Northeast Corner

04/26/2019

FS2216_MO_Parking_Lot_04262019.dwg

F.McArthur

F.McArthur

X.XXX

A-02

009003

Northeast Corner Of Property

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Flam

Bldg.

Engineering Bldg

Shop Bldg

Northwest

Parking Lot

Southwest

Parking Lot

121'-10"

9'-11"

1. The main entrance asphalt has been heaved by the roots of the trees adjacent to the driveway. Remove the existing asphalt, and base material. Remove organic material including tree roots, at least 2 feet below finished grade. Regrade from sidewalk to a point roughly 75 feet from sidewalk for smooth transition to the street.

2. Remove asphalt down to base material and repave to ensure that water flows to the storm drain from the corner.

3. Remove the existing asphalt in these locations

(areas to be marked on ground) down to base material and repave areas.

4. Remove asphalt, base, and sub-base material in these areas and contour the ground to facilitate moisture runoff to natural areas or drains. In addition, reseed the area with native seeds.

5. Remove existing asphalt and concrete in this area and install new concrete Valley pan that directs water to the existing drain.

6. All the asphalt paved areas on the site are to be cleaned, crack sealed, and then slurry sealed to extend the life of the of parking lot.

Upon completion of the slurry seal, all parking areas are to be new stripped.

7. Remove the three trees that are adjacent to entrance way.

KEY NOTES:

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/8 /19

:4

9 F

MC

AR

TH

UR

F

:\P

RO

JE

CT

S\

MO

SC

OW

D

RI

VE

W

AY

\F

S2

6_

MO

_P

AR

KI

NG

_L

OT

_0

9.D W

G;

S22 Rocky Mtn. Research Station

Moscow Lab Parking Lot Renovation

RMRS

Moscow Forestry Sciences Laboratory

SITE PLAN -Northwest Corner

04/26/2019

FS2216_MO_Parking_Lot_04262019.dwg

F.McArthur

F.McArthur

X.XXX

A-03

009004

Northwest Corner Of Property

AutoCAD SHX Text Bike Storage

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

East

Greenhouse

Shop

Annex

Annex

Parking

ADA Parking

19'-10"

14'-4"

1. The main entrance asphalt has been heaved by the roots of the trees adjacent to the driveway. Remove the existing asphalt, and base material. Remove organic material including tree roots, at least 2 feet below finished grade. Regrade from sidewalk to a point roughly 75 feet from sidewalk for smooth transition to the street.

2. Remove asphalt down to base material and repave to ensure that water flows to the storm drain from the corner.

3. Remove the existing asphalt in these locations

(areas to be marked on ground) down to base material and repave areas.

4. Remove asphalt, base, and sub-base material in these areas and contour the ground to facilitate moisture runoff to natural areas or drains. In addition, reseed the area with native seeds.

5. Remove existing asphalt and concrete in this area and install new concrete Valley pan that directs water to the existing drain.

6. All the asphalt paved areas on the site are to be cleaned, crack sealed, and then slurry sealed to extend the life of the of parking lot.

Upon completion of the slurry seal, all parking areas are to be new stripped.

7. Remove the three trees that are adjacent to entrance way.

KEY NOTES:

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/8 /19

:4

9 F

MC

AR

TH

UR

F

:\P

RO

JE

CT

S\

MO

SC

OW

D

RI

VE

W

AY

\F

S2

6_

MO

_P

AR

KI

NG

_L

OT

_0

9.D W

G;

S22 Rocky Mtn. Research Station

Moscow Lab Parking Lot Renovation

RMRS

Moscow Forestry Sciences Laboratory

SITE PLAN - Southeast Corner of Lot

04/26/2019

FS2216_MO_Parking_Lot_04262019.dwg

F.McArthur

F.McArthur

X.XXX

A-04

009005

Southeast Corner of Lot

AutoCAD SHX Text Bike Storage

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

NEW ASPHALT 3" MINIMUM

1' KEY-IN1' KEY-IN

SAW CUT

AND TACK

SAW CUT

AND TACK

1. THE PAVEMENT EDGE SHALL BE DEFINED BY A STRAIGHT EDGE FORMED BY A MACHINED SAW CUT.

THE ASPHALT BE LESS THAN 3" THICK.

DRUM ROLLER TO ACHIEVE A SMOOTH, LEVEL PATCH.

6. THE ASPHALT PAVEMENT MATERIAL SHALL BE INSTALLED AND COMPACTED THOROUGHLY AND ROLLED WITH A SMOOTH

NOTES:

T-99 AS MODIFIED BY NCDOT.

3. THE FINAL 1' OF FILL SHALL CONSIST OF ABC MATERIAL COMPACTED TO A DENSITY EQUAL TO 100% OF THAT

OBTAINED BY COMPACTING A SAMPLE OF THE MATERIAL IN ACCORDANCE WITH AASHTO T-80 AS

4. THE ENTIRE THICKNESS/VERTICAL EDGE OF THE CUT SHALL BE TACKED.

OF AT LEAST 95% OF THAT OBTAINED BY COMPACTING A SAMPLE OF THE MATERIAL IN ACCORDANCE WITH AASHTO

2. THE TRENCH SUBGRADE MATERIAL SHALL BE BACKFILLED WITH SUITABLE MATERIAL AND COMPACTED TO A DENSITY

5. THE SAME DEPTH OF PAVEMENT MATERIAL WHICH EXISTS SHALL BE REINSTALLED, BUT IN NO CASE SHALL

EXISTING PAVEMENT

EXISTING PAVEMENT

EXISTING SUBGRADE

EXISTING ABC

EXISTING ABC

NEW ABC 12" MINIMUM DEPTH

MODIFIED BY NCDOT. BITUMINOUS BASE OR BINDER MAY BE SUBSTITUTED IF APPROVED BY TRANSPORTATION

DIRECTOR OR DESIGNEE.

3'-0"

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/8 /19

:4

9 F

MC

AR

TH

UR

F

:\P

RO

JE

CT

S\

MO

SC

OW

D

RI

VE

W

AY

\F

S2

6_

MO

_P

AR

KI

NG

_L

OT

_0

9.D W

G;

S22 Rocky Mtn. Research Station

Moscow Lab Parking Lot Renovation

RMRS

Moscow Forestry Sciences Laboratory

PARKING LOT REPAIR

DETAILS

04/26/2019

FS2216_MO_Parking_Lot_04262019.dwg

F.McArthur

F.McArthur

X.XXX

A-05

009006

Not to Scale

Asphalt Patch Detail

Not to Scale

Valley Pan Detail

Not to Scale

Detail for Area Asphalt is Removed

AutoCAD SHX Text Pavement

AutoCAD SHX Text 6" of crushed aggregate

AutoCAD SHX Text Install 2 #4 rebar 3" off the bottom & 8" from edge

AutoCAD SHX Text New 4" of Topsoil & Seeding.

AutoCAD SHX Text 6" of backfill material or to bottom of excavated material from asphalt removal.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Engineering Bldg

West

Greenhouse

Shop Bldg

Shop

East

Greenhouse

Flam

Bldg.

Annex

Warehouse

Talyor Ave

M a i n

S r e e

U

S

H i g h w a y

1. Pavement markings shall be painted to the widths, lengths, and locations as shown on the plans.

2. Pavement markings for all symbols shall use stencil or thermoplastic markings.

3. All markings shall be yellow latex traffic paint or approved equal, except for accessible parking lot markings shall be blue latex paint.

4. Asphalt surfaces shall be properly cured before applying and pavement markings.

5. Asphalt surfaces shall be dry, clean, and free of contaminants such as surface oils.

Pavement Marking Notes

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/8 /19

:4

9 F

MC

AR

TH

UR

F

:\P

RO

JE

CT

S\

MO

SC

OW

D

RI

VE

W

AY

\F

S2

6_

MO

_P

AR

KI

NG

_L

OT

_0

9.D W

G;

S22 Rocky Mtn. Research Station

Moscow Lab Parking Lot Renovation

RMRS

Moscow Forestry Sciences Laboratory

PARKING LOT

STRIPPING PLAN

04/26/2019

FS090523_R102013_L1-002.dwg

F.McArthur

F.McArthur

X.XXX

A-06

009007

Scale: 1" = 60'

Large Site Plan for Striping

AutoCAD SHX Text Bike Storage

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

9'-0" 9'-0"

9'-0"

9'-0"

Main Lab

Bldg

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/8 /19

:4

9 F

MC

AR

TH

UR

F

:\P

RO

JE

CT

S\

MO

SC

OW

D

RI

VE

W

AY

\F

S2

6_

MO

_P

AR

KI

NG

_L

OT

_0

9.D W

G;

S22 Rocky Mtn. Research Station

Moscow Lab Parking Lot Renovation

RMRS

Moscow Forestry Sciences Laboratory

PARKING LOT

STRIPPING PLAN

DETAILS

04/26/2019

FS090523_R102013_L1-002.dwg

F.McArthur

F.McArthur

X.XXX

A-07

009008

Southeast Parking Lot

Southeast Annex Parking Lot

Northwest Parking Lots

Front Parking Lot

Back Parking Lot

AutoCAD SHX Text Bike Storage

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/8 /19

:4

9 F

MC

AR

TH

UR

F

:\P

RO

JE

CT

S\

MO

SC

OW

D

RI

VE

W

AY

\F

S2

6_

MO

_P

AR

KI

NG

_L

OT

_0

9.D W

G;

S22 Rocky Mtn. Research Station

Moscow Lab Parking Lot Renovation

RMRS

Moscow Forestry Sciences Laboratory

PHOTOS OF SITE

04/26/2019

FS2216_MO_Parking_Lot_04262019.dwg

F.McArthur

F.McArthur

X.XXX

A-08

009009

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text Remove & Patch so water flows to drain.

AutoCAD SHX Text Remove & Patch

AutoCAD SHX Text Remove & Patch

AutoCAD SHX Text Remove & Patch

AutoCAD SHX Text Remove & Patch

AutoCAD SHX Text Remove Asphalt & grade & seed

AutoCAD SHX Text Remove & Regrade & New Asphalt

AutoCAD SHX Text Remove Trees

AutoCAD SHX Text Remove Asphalt & Regrade with new soil & seed

AutoCAD SHX Text Remove Asphalt & grade & Seed

AutoCAD SHX Text New Valley Pan

AutoCAD SHX Text New Valley Pan

Remove Asphalt & Regrade with new soil & seed

Sheets and Views
FS2216_MO_Parking_Lot_04262019-Site Plan
FS2216_MO_Parking_Lot_04262019-Site Plan - NE
FS2216_MO_Parking_Lot_04262019-Site Plan - NW
FS2216_MO_Parking_Lot_04262019-Site Plan - SE
FS2216_MO_Parking_Lot_04262019-Details
FS2216_MO_Parking_Lot_04262019-Stripping Plan
FS2216_MO_Parking_Lot_04262019-Stripping Plan Detail
FS2216_MO_Parking_Lot_04262019-Photos
Coversheet.pdf
Sheets and Views
COVERSHEET
OLE1

File details come from the government source that posted it.