Attachment_2_-_Drawings_and_Photos.pdf
PDF 3 MB Posted
- Attached to
- Flagstaff Southwest Forest Sciences Complex Flooring Replacement Federal contract opportunity
- Solicitation number
- 1282FT18R0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1282FT18R0007AME0001.pdf | ||
| Attachment_1_-_Specifications.pdf | ||
| Solicitation_1282FT18R0007.pdf | ||
| Attachment_3_-_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
VICINITY MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture
Forest Service
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 COVER SHEET
A-01 BASEMENT FLOOR PLAN
A-02 FIRST FLOOR PLAN
A-03 SECOND FLOOR PLAN
A-04 BASEMENT FLOOR PICTURES
A-05 FIRST FLOOR PICTURES
A-06 SECOND FLOOR PICTURES
A-07
GREENHOUSE FLOORING DEMO
PICTURES
SOUTHWEST FOREST SCIENCES COMPLEX - LOCATED ON THE
SOUTHWEST CORNER OF NORTHERN ARIZONA UNIVERSITY AT 2500
SOUTH PINE KNOLL DRIVE IN FLAGSTAFF, ARIZONA.
RECOMMENDED BY:
APPROVED:
DATE
DATE
DATE
STATION ENGINEER
DATE
DATE
4/2 5/1
8 1 2:
F
MC
AR
TH
UR
E :\P
RO
JE
CT
S\
FL
AG
ST
AF
F
FL
OO
RI
NG
\C
OV
ER
SH
EE
T.
DW
G;
Flagstaff Southwest Forest Sciences
Complex Reflooring
Arizona
Coconino
SOUTHWEST FOREST SCIENCES COMPLEX
RMRS - Rocky Mtn. Research Station
SOUTHWEST FOREST SCIENCES COMPLEX
ROCKY MOUNTAIN RESEARCH STATION
2500 South Pine Knoll drive
Flagstaff, AZ 86001
04/26/2018
Elevator
Removable Entrance Mat
Fixed Entrance Walk-off Mat
Epoxy Resin Flooring
VCT Tile with Accent Trim
LEGEND
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 4/1
8 1 1:
F
MC
AR
TH
UR
E :\P
RO
JE
CT
S\
FL
AG
ST
AF
F
FL
OO
RI
NG
\R
S2
6_
FL
AG
ST
AF
F_
FL
OO
RI
NG
.D W
G;
RMRS
Rocky Mtn. Research Station
Flagstaff Southwest Forest Sciences
Complex Reflooring
Basement Flooring Plan
04/20/2018
RS2216_Flagstaff_Flooring.dwg
F.MCARTHUR
F.MCARTHUR
X.XXX
A-01
008002
Scale: 1/16": = 1'-0"
Basement New Flooring Plan
Scale: 1/16" = 1' - 0"
Elevator New Floor Plan
AutoCAD SHX Text Dear Taliban, Mr. Bin Laden, Mr. Arafat, and Mr. Hussein, et al: We are pleased to announce that we unequivocally accept your challenge to an old-fashioned game of whoop-ass. Now that we understand the rule that there are no rules, we look forward to playing without them for the first time. Since this game is a winner-take-all, we unfortunately are unable to invite you to join us at the victory celebration. But rest assured that we will toast you -- LITERALLY. While we will admit that you are off to an impressive lead, it is however now our turn at the plate. By the way, we will be playing on your diamond now... Batter up! Our team line up is as follows: Manager ~ George W. Bush Ass't Manager ~ Dick Cheney Head Coach ~ Colin Powell Assistant Coach ~ Donald Rumsfeld Starting Pitcher ~ Norman Schwartzkoff 1st Base ~ U. S. Marine Corps 2nd Base ~ U. S. Navy 3rd Base ~ U.S. Air Force Shortstop and clean up hitter ~ U. S. Army Outfield ~ Firemen and Policemen Umpire ~ None Required * remember - the manager told you there'll be no discussion; no negotiation! Pinch hitters as needed ~ U.S. Navy SEALS U.S. Army Green Berets U.S. Army Rangers U.S. Air Force PJs Delta Force And, since there are no rules, we've decided to add: 4th Base ~ United Kingdom 5th Base ~ Russia 6th Base ~ China Other Bases (as desired) ~ Pakistan, Japan, Germany, France, Spain, Italy "Turkistan and lots of other ...stans" and more. Opening Ceremonies: Vocal 1: Celine Dion ~ The Star Spangled Banner Vocal 2: Lee Greenwood ~ God Bless The U.S.A. Vocal 3: Neil Diamond ~ Comin' To America Vocal 4: Bruce Springstein ~ Born In The U.S.A. Vocal 5: The Mormon Tabernacle Choir ~ Battle Hymn of the Republic You may choose whomever you want for your team ... it won't really matter (even if you all shave), our guys are gonna win!!! Sincerely, On behalf of the 270,000,000 citizens of the United States of America P.S. May we recommend at this time that you give your soul to Allah; 'cause your ass is ours! Goodbye
AutoCAD SHX Text Dear Taliban, Mr. Bin Laden, Mr. Arafat, and Mr. Hussein, et al: We are pleased to announce that we unequivocally accept your challenge to an old-fashioned game of whoop-ass. Now that we understand the rule that there are no rules, we look forward to playing without them for the first time. Since this game is a winner-take-all, we unfortunately are unable to invite you to join us at the victory celebration. But rest assured that we will toast you -- LITERALLY. While we will admit that you are off to an impressive lead, it is however now our turn at the plate. By the way, we will be playing on your diamond now... Batter up! Our team line up is as follows: Manager ~ George W. Bush Ass't Manager ~ Dick Cheney Head Coach ~ Colin Powell Assistant Coach ~ Donald Rumsfeld Starting Pitcher ~ Norman Schwartzkoff 1st Base ~ U. S. Marine Corps 2nd Base ~ U. S. Navy 3rd Base ~ U.S. Air Force Shortstop and clean up hitter ~ U. S. Army Outfield ~ Firemen and Policemen Umpire ~ None Required * remember - the manager told you there'll be no discussion; no negotiation! Pinch hitters as needed ~ U.S. Navy SEALS U.S. Army Green Berets U.S. Army Rangers U.S. Air Force PJs Delta Force And, since there are no rules, we've decided to add: 4th Base ~ United Kingdom 5th Base ~ Russia 6th Base ~ China Other Bases (as desired) ~ Pakistan, Japan, Germany, France, Spain, Italy "Turkistan and lots of other ...stans" and more. Opening Ceremonies: Vocal 1: Celine Dion ~ The Star Spangled Banner Vocal 2: Lee Greenwood ~ God Bless The U.S.A. Vocal 3: Neil Diamond ~ Comin' To America Vocal 4: Bruce Springstein ~ Born In The U.S.A. Vocal 5: The Mormon Tabernacle Choir ~ Battle Hymn of the Republic You may choose whomever you want for your team ... it won't really matter (even if you all shave), our guys are gonna win!!! Sincerely, On behalf of the 270,000,000 citizens of the United States of America P.S. May we recommend at this time that you give your soul to Allah; 'cause your ass is ours! Goodbye
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
Removable Entrance Mat
Fixed Entrance Walk-off Mat
Epoxy Resin Flooring
VCT Tile with Accent Trim
LEGEND
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 4/1
8 1 1:
F
MC
AR
TH
UR
E :\P
RO
JE
CT
S\
FL
AG
ST
AF
F
FL
OO
RI
NG
\R
S2
6_
FL
AG
ST
AF
F_
FL
OO
RI
NG
.D W
G;
RMRS
Rocky Mtn. Research Station
Flagstaff Southwest Forest Sciences
Complex Reflooring
First Floor Flooring Plan
04/20/2018
RS2216_Flagstaff_Flooring.dwg
F.MCARTHUR
F.MCARTHUR
X.XXX
A-02
008003
Scale: 1/16" = 1' - 0"
First Floor New Flooring
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
167'-9"
Removable Entrance Mat
Fixed Entrance Walk-off Mat
Epoxy Resin Flooring
VCT Tile with Accent Trim
LEGEND
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 4/1
8 1 1:
F
MC
AR
TH
UR
E :\P
RO
JE
CT
S\
FL
AG
ST
AF
F
FL
OO
RI
NG
\R
S2
6_
FL
AG
ST
AF
F_
FL
OO
RI
NG
.D W
G;
RMRS
Rocky Mtn. Research Station
Flagstaff Southwest Forest Sciences
Complex Reflooring
Second Floor Flooring Plan
04/20/2018
RS2216_Flagstaff_Flooring.dwg
F.MCARTHUR
F.MCARTHUR
X.XXX
A-03
008004
Scale: 1/16" = 1' - 0"
Second Floor New Flooring Plan
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 4/1
8 1 1:
F
MC
AR
TH
UR
E :\P
RO
JE
CT
S\
FL
AG
ST
AF
F
FL
OO
RI
NG
\R
S2
6_
FL
AG
ST
AF
F_
FL
OO
RI
NG
.D W
G;
RMRS
Rocky Mtn. Research Station
Flagstaff Southwest Forest Sciences
Complex Reflooring
Basement Floor Pictures
04/20/2018
RS2216_Flagstaff_Flooring.dwg
F.MCARTHUR
F.MCARTHUR
X.XXX
A-04
008005
Entrance Removable Walkoff Mat
Basement Hallway
Basement Hallway
Basement Hallway
Basement in Front of Elevator
Basement - Room to be epoxy flooring
Basement - Room to be epoxy flooring
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 4/1
8 1 1:
F
MC
AR
TH
UR
E :\P
RO
JE
CT
S\
FL
AG
ST
AF
F
FL
OO
RI
NG
\R
S2
6_
FL
AG
ST
AF
F_
FL
OO
RI
NG
.D W
G;
RMRS
Rocky Mtn. Research Station
Flagstaff Southwest Forest Sciences
Complex Reflooring
First Floor Pictures
04/20/2018
RS2216_Flagstaff_Flooring.dwg
F.MCARTHUR
F.MCARTHUR
X.XXX
A-05
008006
First Floor North Hallway
First Floor North Hallway (NW Corner)
First Floor South Hallway (SW Corner)
First Floor South Hallway
First Floor (NW Corner at Stairwell)
First Floor - Entrance (New Walkoff Matt)
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 4/1
8 1 1:
F
MC
AR
TH
UR
E :\P
RO
JE
CT
S\
FL
AG
ST
AF
F
FL
OO
RI
NG
\R
S2
6_
FL
AG
ST
AF
F_
FL
OO
RI
NG
.D W
G;
RMRS
Rocky Mtn. Research Station
Flagstaff Southwest Forest Sciences
Complex Reflooring
Second Floor Pictures
04/20/2018
RS2216_Flagstaff_Flooring.dwg
F.MCARTHUR
F.MCARTHUR
X.XXX
A-06
008007
Second Floor Hallway (SW Corner)
Second Floor - North South Hallway
Second Floor - North Hallway
Second Floor - NE Corner by Elevator
Second Floor Hallway
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 4/1
8 1 1:
F
MC
AR
TH
UR
E :\P
RO
JE
CT
S\
FL
AG
ST
AF
F
FL
OO
RI
NG
\R
S2
6_
FL
AG
ST
AF
F_
FL
OO
RI
NG
.D W
G;
RMRS
Rocky Mtn. Research Station
Flagstaff Southwest Forest Sciences
Complex Reflooring
Greenhouse Flooring Demo Pictures
04/20/2018
RS2216_Flagstaff_Flooring.dwg
F.MCARTHUR
F.MCARTHUR
X.XXX
A-07
008008
South Hallway
North Hallway
North Hallway
South Hallway - Restroom Door
Closeup of floor in North Hallway
General Notes:
This portion of the project is to remove the existing VCT flooring and adhesive in the hallways. Clean concrete surface to make acceptable to match the existing concrete floors in adjoining spaces. Install thresholds at doorways with remaining flooring.
Approximately 750 Square Feet of flooring to be removed.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Coversheet |
| Sheets and Views |
| 17x11 EXPANDED |
| RS2216_Flagstaff_Flooring |
| Sheets and Views |
| RS2216_Flagstaff_Flooring-Basement_New |
| RS2216_Flagstaff_Flooring-First Floor New |
| RS2216_Flagstaff_Flooring-Second Floor New |
| RS2216_Flagstaff_Flooring-Basement_Pics |
| RS2216_Flagstaff_Flooring-First Floor_Pics |
| RS2216_Flagstaff_Flooring-Second Floor_Pics |
| RS2216_Flagstaff_Flooring-Greenhouse Pics |
File details come from the government source that posted it.