12815619Q0001.pdf

PDF 835 KB Posted

Attached to
FSR 516 Guardrail Improvements Federal contract opportunity
Solicitation number
12815619Q0001
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

RFQ

View the file

Other files for this federal contract opportunity

Other files attached to FSR 516 Guardrail Improvements, newest first.
File Type Posted
12815619Q0001_Amendment_0001.pdf PDF
FSR_516_Guardrail_SSpec.pdf PDF
FSR_516_Guardrail_Plans.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

950818

SOUTHWESTERN REGION

333 BROADWAY SE

ALBUQUERQUE NM 87102

USDA Forest Service - Joni Dutcher

3463 Las Palomas Road Alamogordo, NM 88310

JONI DUTCHER 505-842-3121

104/22/2019

12815619Q0001

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

PROJECT: FSR 516 GUARDRAIL IMPROVEMENTS - COCONINO NATIONAL FOREST

The USDA Forest Service, Coconino National Forest, Flagstaff, Arizona, has a requirement for removal and replacement of 1,500 feet of existing guardrail sections with new materials as well as the repair of a guardrail terminal cable as designated by the Contracting Officer Representative on Forest Service Road FSR 516 (Snowbowl

Rd). This project also includes options for a tangent type guardrail terminal, guardrail buffer terminal object markers, and an additional 200 feet of guardrail replacement.

Location: To reach FSR 516: From Flagstaff, AZ take Highway 180 approximately 6.6 miles NW to FSR 516 Snowbowl Road. Project is located at the junction of FSR 516 and

Highway 180 and continues 6.98 miles to the entrance of Snowbowl.

MAGNITUDE OF PROJECT: Between $100,000 and $250,000. This solicitation is a 100 percent Total Small Business Set-Aside.

Period Of Performance: The contractor shall complete all working within 60 calendar days. Contract may be suspended if inclement weather exists. The contractor shall

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 60 calendar days and complete it within ________________ ________________ calendar days after receiving

FAR 52.211-10

05/20/2019

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

SOUTHWESTERN REGION

333 BROADWAY SE

ALBUQUERQUE NM 87102

JONI DUTCHER

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 54

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

12815619Q0001 notify the COR three (3) days prior to starting work at the site.

NAICS: 237990 $36.5 Million is size standard for small business.

Payment and Performance bonds will be required upon award from awarded contractor only. No bid bonds are required.

Davis-Bacon Wages apply.

All questions must be submitted in writing by close of business day on May 22, 2019. Please submit all questions via email to joni.dutcher@usda.gov

A formal site visit is scheduled for May 8, 2019 at 1030 MST at the Coconino National Forest

Supervisor Office located at 1824 S. Thompson

Street, Flagstaff, AZ 86000

***** YOU MUST BE REGISTERED IN SAM IN ORDER TO

BE AWARDED THIS CONTRACT *****

Coconino FSR 516 Guardrail replacement

FOB: Destination

Period of Performance: 08/01/2019 to 09/30/2019

001 Guardrail Replacement on FSR 516 - See SOW

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

CONSTRUCTION RFQ SOL NO: 12815619Q0001

UNIT: COCONINO NATIONAL FOREST

PROJ NAME: FSR 516 GUARDRAIL IMPROVEMENTS

52.215-1 INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (JAN 2017)

(a) Definitions. As used in this provision --

“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.”

“In writing,” “writing,” or “written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

“Proposal modification” is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

“Time,” if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals.

(1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages

(i) addressed to the office specified in the solicitation, and

(ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show --

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

PROJ NAME: FSR 516 GUARDRAIL IMPROVEMENTS

(3) Submission, modification, revision, and withdrawal of proposals.

(i) Offerors are responsible for submitting proposals, and any modification, or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii)

(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and --

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.

(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.

(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.

(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.

PROJ NAME: FSR 516 GUARDRAIL IMPROVEMENTS

(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.

(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).

(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall --

(1) Mark the title page with the following legend:

This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed -- in whole or in part -- for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of -- or in connection with -- the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government’s right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and

(2) Mark each sheet of data it wishes to restrict with the following legend:

Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

(f) Contract award.

(1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

(2) The Government may reject any or all proposals if such action is in the Government’s interest.

(3) The Government may waive informalities and minor irregularities in proposals received.

(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.

(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government’s best interest to do so.

(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.

PROJ NAME: FSR 516 GUARDRAIL IMPROVEMENTS

(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.

(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.

(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(i) The agency’s evaluation of the significant weak or deficient factors in the debriefed offeror’s offer.

(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(iv) A summary of the rationale for award.

(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.

(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.

(End of Provision)

CHECKLIST OF MINIMUM REQUIREMENTS

AND CERTIFICATION OF OFFER

_____Provide your business email to facilitate communications____________________________

_____DUNS Number ___________________________

_____ Have active vendor record for the DUNS number above in the System for Award Management (SAM) https://www.sam.gov

_____ Respond with the COMPLETE RETURN PACKAGE (See Section M, Evaluation Factors on how to respond). Failure to provide the required information for Evaluation factors may result in your offer being removed from competitive range.

NOTE: All questions shall be submitted in writing via email joni.dutcher@usda.gov by May 22nd. All responses to questions shall be posted to www.FBO.gov by May 28th.

mailto:joni.dutcher@usda.gov http://www.fbo.gov/

PROJ NAME: FSR 516 GUARDRAIL IMPROVEMENTS

PART I – THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

BASE

ITEM # DESCRIPTION OF PROJECT ITEMS

UNIT OF

MEASUR

E

EST.

QTY

PAY

UNIT

UNIT PRICE TOTAL AMOUNT

B1.1 Mobilization – See FP-14 151(01) LSQ 1 LS $_________ $____________

B2.1 Remove and Dispose of Existing Guardrail and Guardrail Terminals (Including posts, rail, cables, etc.) See FP-14 203(01)

CQ 1500 LF $_________ $____________

B3.1

Furnish and Install New G4 W-Beam Guardrail per Standard 617-10, Sheet C-02 (Type IV, Weathering steel with wood posts) Contractor to field verify post length. Extended posts may be required due to slope conditions per FP14 Section 617.04. See FP-14 617(01)

CQ 1400 LF

B4.1 Furnish and Install New Guardrail Low Speed Terminal per Standard 617-14, Sheet C-04, See

FP-14 617(02)

CQ 1 EA $_________ $____________

B5.1 Furnish and Install New Guardrail Flared Terminal per Standard 617-19, Sheet C-06 (Straight Flared Option) FP-14 617(03)

CQ 4 EA $_________ $____________

B6.1 Replace Damaged Guardrail Terminal Cable System (Protect Existing Terminal Posts and Beam in Place) FP-14 617(04)

CQ 1 EA $_________ $____________

TOTAL OF ALL BASE ITEMS

O1 – SCHEDULE OF OPTION ITEMS

OPTION

ITEM # DESCRIPTION OF PROJECT ITEMS

UNIT OF

MEASUR

E

EST.

QTY

PAY

UNIT

UNIT PRICE TOTAL AMOUNT

O1.1

Furnish and Install New Guardrail Tangent Terminal instead of Guardrail Flared Terminal per Standard 617-20, Sheet C-07 - FP-14 617(05)

CQ 1

EA

TOTAL WITH OPTIONS 01

PROJ NAME: FSR 516 GUARDRAIL IMPROVEMENTS

O2 – SCHEDULE OF OPTION ITEMS

OPTION

ITEM # DESCRIPTION OF PROJECT ITEMS

UNIT OF

MEASUR

E

EST.

QTY

PAY

UNIT

UNIT PRICE TOTAL AMOUNT

O2.1

Furnish and Install New Guardrail Buffer Terminal Object Marker Decal on Existing Guardrail Terminal (per Detail OM-BT Decal, sheet C-01) FP-14 617(06)

CQ 23

EA

TOTAL WITH OPTIONS 01 & 02

O3 – SCHEDULE OF OPTION ITEMS

OPTION

ITEM # DESCRIPTION OF PROJECT ITEMS

UNIT OF

MEASUR

E

EST.

QTY UNIT PRICE TOTAL AMOUNT

O3.1 Remove and Dispose of Existing Guardrail and Guardrail Terminals (Including posts, rail, cables, etc.) FP-14 203(01)

CQ 200 LF $_________ $____________

O3.2

Furnish and Install New G4 W-Beam Guardrail per Standard 617-10, Sheet C-02 (Type IV, Weathering steel with wood posts) Contractor to field verify post length. Extended posts may be required due to slope conditions per FP14 Section 617.04. FP-14 617(01)

CQ 150

LF

O3.3 Furnish and Install New Guardrail Low Speed Terminal per Standard 617-14, Sheet C-04 Section 617.04. FP-14 617(02)

CQ 1 EA $_________ $____________

O3.4 Furnish and Install New Guardrail Flared Terminal per Standard 617-19, Sheet C-06 (Straight Flared Option) FP-14 617(03)

CQ 1 EA $_________ $____________

TOTAL WITH OPTIONS 01 & 02 & 03

CERTIFICATION OF OFFER AND SUBMISSIONS FOR THIS REQUEST FOR PROPOSALS:

VENDOR COMPANY NAME:____________________________________ DUNS#____________________

AUTHORIZED TO SIGN (NAME & TITLE):__________________________________________________________

SIGNATURE:____________________________________________________ DATE:_____________________

BUSINESS EMAIL: __________________________________________

PROJ NAME: FSR 516 GUARDRAIL IMPROVEMENTS

C - SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C1 – GENERAL DESCRIPTION OF WORK

The Contractor shall furnish all supervision, materials, equipment and vehicles, tools, parts, labor, transportation, lodging, and miscellaneous items to remove and replace 1,500 feet of existing guardrail sections with new materials. This work will include replacing all wooden posts, railing, cables and associated hardware as well as the repair of a guardrail terminal cable as designated by the COR on FSR 516 (Snowbowl Rd). This project also includes options for furnishing and installing a tangent type guardrail terminal in lieu of the low speed terminal in B4.1, guardrail buffer terminal object markers, and an additional 200 feet of guardrail replacement

All work shall be in accordance with the plans and specifications contained herein. No changes to the specifications, terms, or conditions of this Request For Quotations (RFQ) shall be made without the prior approval of the Contracting Officer in writing.

The Government intends to award a contract based on Best Value -- LPTA (Lowest Price Technically Acceptable). The offeror that demonstrates that they have technical skill required and lowest price. In order to remain in the competitive range, Offerors (Contractors) shall submit the Return Package with the requirements in Section M, Evaluation Factors.

C.2 – LOCATION OF PROJECT

From Flagstaff, AZ take HWY 180 approximately 6.6 miles NW to FSR 516/Snowbowl Rd. Project is located at the junction of FSR 516 and HWY 180 and continues 6.98 miles to the entrance of Snowbowl.

C.3 – SCOPE OF WORK

When the term “remove” or “replace” is used, the old concrete post encasement (if existing) must be hauled offsite and disposed of in accordance with local, state, and federal regulations. There are local vendors who take concrete for recycling.

For all sites, provide and maintain barricades per MUTCD for continuous traffic flow and public safety.

C3.1 BASE LINE ITEM B1.1

Mobilization, one-time fee. Unit of measure is Lump Sum (LS).

C3.2 BASE LINE ITEM B2.1

Remove and Dispose of Existing Guardrail and Guardrail Terminals (Including posts, rail, cables, etc.) at the following locations and in accordance with the drawings and specifications. Unit of measure is Linear Feet (LF).

C3.3 BASE LINE ITEM B3.1

Furnish and Install New G4 W-Beam Guardrail per Standard 617-10, Sheet C-02 (Type IV, Weathering steel with wood posts) Contractor to field verify post length. Extended posts may be required due to slope conditions per FP14 Section 617.04, in accordance with the drawings and specifications. Unit of measure is Linear Feet (LF).

C3.3 BASE LINE ITEM B4.1

Furnish and Install New Guardrail Low Speed Terminal per Standard 617-14, Sheet C-04. This line item will be awarded in conjunction with B4.1. Unit of measure is (CQ).

C3.4 BASE LINE ITEM B5.1

Furnish and Install New Guardrail Flared Terminal per Standard 617-19, Sheet C-06 (Straight Flared Option)

PROJ NAME: FSR 516 GUARDRAIL IMPROVEMENTS

C3.5 BASE LINE ITEM B6.1

Replace Damaged Guardrail Terminal Cable System (Protect Existing Terminal Posts and Beam in Place). This line item will be awarded in conjunction with B6.1. Unit of measure is Contract Quantities (CQ).

C3.6 OPTION LINE ITEM O1.1

Furnish and Install New Guardrail Tangent Terminal instead of Guardrail Flared Terminal per Standard 617-20, Sheet C-07

C3.7 OPTION LINE ITEM O2.1

Furnish and Install New Guardrail Buffer Terminal Object Marker Decal on Existing Guardrail Terminals (per Detail OM- BT Decal, sheet C-01)

C3.8 OPTION LINE ITEM O3.1

Remove and Dispose of Existing Guardrail and Guardrail Terminals (Including posts, rail, cables, etc.)

C3.9 OPTION LINE ITEM O3.2

Furnish and Install New G4 W-Beam Guardrail per Standard 617-10, Sheet C-02 (Type IV, Weathering steel with wood posts) Contractor to field verify post length. Extended posts may be required due to slope conditions per FP14 Section 617.04.

C3.10 OPTION LINE ITEM O3.3

Furnish and Install New Guardrail Low Speed Terminal per Standard 617-14, Sheet C-04 Section 617.04.

C3.11 OPTION LINE ITEM O3.4

Furnish and Install New Guardrail Flared Terminal per Standard 617-19, Sheet C-06 (Straight Flared Option)

C4.1 WORK SCHEDULE

The contractor shall complete all work within 60 calendar days. Contract time may be suspended if weather conditions prevent work. The contractor shall notify the COR one month prior to starting work at the site.

C5.1 POINT OF CONTACT/CONTRACTING OFFICER REPRESENTATIVE

Nicholas Warnke Assistance Forest Engineer 800 South 6th Street Williams, AZ 86046 Phone: 928-635-8370 Email: nicholas.warnke@usda.gov

452.211-72 STATEMENT OF WORK/SPECIFICATIONS. (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

(End of Clause) mailto:nicholas.warnke@usda.gov

PROJ NAME: FSR 516 GUARDRAIL IMPROVEMENTS

452.211-73 Attachments to Statements Of Work/Specifications. (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

(End of Clause)

D - SECTION D – PACKAGING AND MARKING

D1—GENERAL INFORMATION:

See Section J for Exhibits that are incorporated as part of the statement of work:

Reference Section J for Exhibits:

Exhibit 1 – U.S. Department of Labor, Wage Determination Exhibit 2 – Bio-preferred Requirements Attachment 1 – Guardrail Plans/Maps/Drawings – 12 pages Attachment 2 – Guardrail SSpecifications – 24 pages

See Section M (Required submission with schedule of prices) – Evaluation Factors for LPTA:

Technical Capability shall be submitted in the form of a statement or document that demonstrates the contractor’s capability to perform the work to meet or exceed the requirements of this solicitation. In order to meet the Technical Capability Requirements, offers shall address the following factors:

Factor a – The standard for concrete replacement is the ability to remove concrete with mechanical means, to prepare the subgrade or subbase for new concrete, in accordance the with plans and specifications (Exhibits 3 and 4).

The standard for asphalt crack sealing and asphaltic road repairs is the ability to apply crack sealer via hot method application, and to fill in large gaps and potholes with a cold-mix asphaltic material, to include compaction, in accordance with the plans and specifications (Exhibits 3 and 4).

Offerors should develop a statement or documentation that demonstrates contractor technical capability to perform roadway concrete replacement and asphaltic road repairs. You may provide your own drawings, illustrations, documents, or photos to support your capability to perform the work.

Price -- Competitive offers will establish price reasonableness. Therefore, when contracting on a firm-fixed-price basis, comparison of the proposed prices will satisfy the requirement to perform a price analysis (cost analysis need not be performed). Contracting Officer intends to award without discussions, offerors shall provide their best prices up front.

Pricing will serve as a final determining factor for award under LPTA.

E - SECTION E – INSPECTION AND ACCEPTANCE

52.246-12 Inspection of Construction. (AUG 1996)

(a) Definition. Work includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

PROJ NAME: FSR 516 GUARDRAIL IMPROVEMENTS

(c) Government inspections and tests are for the sole benefit of the Government and do not -

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph

(i) below.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

(End of clause)

52.246-13 Inspection – Dismantling, Demolition, or Removal of Improvements. (AUG 1996)

(a) Unless otherwise designated by the specifications, all workmanship performed under the contract is subject to Government inspection at all times and places where dismantling or demolition work is being performed. The Contractor shall furnish promptly, and at no increase in contract price, all reasonable facilities, labor, and materials necessary for safe and convenient inspection by the Government. The Government shall perform inspections in a manner that will not unduly delay the work.

(b) The Contractor is responsible for damage to property caused by defective workmanship. The Contractor shall promptly segregate and remove from the premises any unsatisfactory facilities, materials, and equipment used in contract performance, and promptly replace them with satisfactory items. If the Contractor fails to proceed at once in a workmanlike manner with performance of the work or with the correction of defective workmanship, the

PROJ NAME: FSR 516 GUARDRAIL IMPROVEMENTS

Government may (1) by contract or otherwise, replace the facilities, materials, and equipment or correct the workmanship and charge the cost to the Contractor and (2) terminate for default the Contractor's right to proceed.

The Contractor and any surety shall be liable, to the extent specified in the contract for any damage or cost of repair or replacement.

(End of clause)

52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)

(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.

(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.

(c) The Contractor shall remedy at the Contractor’s expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor’s expense any damage to Government-owned or controlled real or personal property, when that damage is the result of—

(1) The Contractor’s failure to conform to contract requirements; or

(2) Any defect of equipment, material, workmanship, or design furnished.

(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor’s warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.

(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.

(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor’s expense.

(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall—

(1) Obtain all warranties that would be given in normal commercial practice;

(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting

Officer; and

(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.

(h) In the event the Contractor’s warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor’s, manufacturers, or supplier’s warranty.

(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.

(j) This warranty shall not limit the Government’s rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.

(End of clause)

F - SECTION F – DELIVERIES OR PERFORMANCE

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 14 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 days. The time stated for completion shall include final cleanup of the premises.

(End of clause)

PROJ NAME: FSR 516 GUARDRAIL IMPROVEMENTS

452.236-75 Maximum Workweek – Construction Schedule. (NOV 1996)

Within 5 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following in writing for approval:

(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposes to carry out the work.

The maximum workweek that will be approved is Monday through Friday, 0800 - 1700.

(End of clause)

G – SECTION G – CONTRACT ADMINISTRATION DATA

452.215-73 Postaward Conference. (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled within 7 days after the date of contract award. The conference will be held at: Coconino National Forest – Supervisor’s Office, 1824 S. Thompson Street, Flagstaff, AZ 86000.

H - SECTION – SPECIAL CONTRACT REQUIREMENTS

H1 COCONINO NATIONAL FORESTS: INDUSTRIAL FIRE PLAN

The following requirements are a part of this solicitation and any resultant contract or permit, and shall be provided at the Contractor’s expense:

1. Wildfire Prevention – During periods of contract/permit performance, fire prevention and immediate suppression actions shall be performed by the Contractor.

2. Execution of Industrial Fire Plan

a. Forest Service personnel involved will, in all cases, coordinate through the Contracting Officer’s Representative (COR) or Permit Administrator, except in cases of emergency, Red Flag Days, or Forest closure.

b. The Contractor shall designate a Fire Guard, fluent in English, who shall be responsible for executing and carrying out the Industrial Fire Plan requirements. The name of this representative will be provided to the COR at the pre-work meeting.

c. The Contractor shall include the Industrial Fire Plan requirements in all subcontracts.

d. The Contractor shall assure that all contract employees are informed of the existence and conditions of the Industrial Fire Plan requirements.

3. Compliance Inspection

a. Inspection by the Forest Service will be made to insure compliance with the fire requirements.

b. Should any deficiencies appear during the inspection, the Contractor/Permit holder will be informed and the deficiencies shall be corrected within 24 hours. Activities with the potential to start fires shall be halted until the deficiencies are corrected and the corrections are approved by the COR.

c. The Contractor’s Fire Guard shall make daily inspections to insure that the terms of the Industrial Fire Plan requirements are met at all times, both on the job-site and in the Contractor’s camp.

PROJ NAME: FSR 516 GUARDRAIL IMPROVEMENTS

4. Fire Prevention Requirements

a. Fire Toolbox - During contract performance, the Contractor shall furnish and maintain, at the Contractor’s expense, one mobile Fire Toolbox, within ¼ mile or less of the location where the Contractor is currently performing work and camping.

Authorized users shall furnish and maintain, in good working order, fires tools to be used only for suppressing wildland fires. Each operation shall be provided with one firefighting tool per person to equip all personnel engaged in authorized user’s operations. Approved firefighting tools may include the following: pulaski; McLeod tool; long handled shovel. These tools are separate from those required to be mounted on equipment.

The fire toolbox shall be replenished with cleaned, re-sharpened, reconditioned, or new tools by the Contractor after each use.

b. Work Hours – The Contractor shall restrict operations in accordance with the following Industrial Fire Plan level unless the COR waives the requirement in writing.

Each day of operation when there is a predicted change in the Industrial Fire Plan level, the Forest Service will inform the Contractor between 3 and 6 pm MST (4 and 7 pm MDT). Notification will be made of which stage in the industrial fire precaution plan (Supplement 1) to be followed the next day within the local operating area.

No later than 9 am MST (10 am MDT) the following day, the Forest Service will inform the Contractor of any change in the fire precaution schedule. In the case of Red Flag Days, the Forest Service will inform the Contractor as soon as possible after the National Weather Service issues their high wind warning for that day, which often comes after 9 am MST.

c. Blasting – Use of fuses in blasting shall not be permitted. A long-handled round-pointed shovel and at least five gallons of water for fire fighting purposes shall be available at all times. A fire guard must remain on the blasting site for a minimum of one hour after blasting operations have concluded.

d. Welding – An area of sufficient size but not less than a 10 foot radius shall be cleared down to mineral soil before welding operations are started. Prior to welding, authorized user shall have available a round-pointed long-handled shovel, at least 5-gallons of water, and a 5-pound fire ABC dry chemical extinguisher at each welding site. A fire guard must remain on the welding site for a minimum of one hour after welding operations have concluded.

e. Burning of Refuse – No slash or other debris, such as that resulting from clearing on right-of-way, shall be burned without the written consent of the Coconino National Forest.

f. Fire Tools on Equipment Passenger carrying vehicles, including light pickup trucks and all-terrain vehicles, shall be equipped with one (1) long-handled round pointed shovel and one (1) ABC dry chemical fire extinguisher not less than 2 1/2 pounds capacity. Each internal combustion fuel carrying piece of equipment (dump truck, dozer, excavator, backhoe, etc…) shall be equipped with one long-handled round-pointed shovel, and one 5-pound capacity ABC dry chemical fire extinguisher. Shovels and fire extinguishers shall be so mounted as to be readily reached from the ground.

g. Spark Arresters and Mufflers – Authorized user will ensure that each internal combustion engine shall be equipped with a spark arrester qualified and rated under USDA Forest Service Standard (Spark Arrester Guide) 5100-1a or the latest revision of Society of Automotive Engineers "medium size engine, SAE recommended practice J350" unless it is:

(a) Equipped with a turbine-driven exhaust supercharger such as the turbocharger. There shall be no exhaust bypass.

PROJ NAME: FSR 516 GUARDRAIL IMPROVEMENTS

(b) A multi-position engine, such as on power saws purchased after 6/30/77 which must meet the performance levels set forth in the Society of Automotive Engineers "multi-positioned small engine exhaust fire ignition standard, SAE recommended practice J335B" as now or hereafter amended. Those purchased prior to the above date shall be equipped with an approved spark arrester/muffler containing a 0.023 inch mesh screen in good condition.

(c) A passenger carrying vehicle or light truck, or medium truck up to 40,000 GVW, used on roads and equipped with a factory designed muffler and an exhaust system in good working condition.

(d) A heavy duty truck, such as a dump truck, or other vehicle used for commercial hauling, used only on roads and equipped with a factory designed muffler and with a vertical stack exhaust system extending above the cab.

Exhaust equipment described in this Subsection, including spark arresters and mufflers, shall be properly installed and constantly maintained in serviceable condition and not modified in any manner.

h. Powered Hand Tools – During periods of use, each powered handtool operator shall have readily available for use, one long-handled round-pointed shovel and one chemical-pressurized ABC dry chemical fire extinguisher of not less than 8-ounce capacity by weight. Muffler, extinguisher, and shovel shall be maintained in good working order at all times. Fueling or refueling of a powered handtool shall be done in an area which has been completely cleared of material which will carry fire.

Powered hand tools shall be moved at least 10 feet from the place of fueling or refueling before starting.

i. Gas Oil Storage and Service Areas –The location of equipment service areas and gas and oil storage areas shall be approved in writing by the permit administrator. All areas shall be cleared of brush, litter, grass or other flammable debris for a radius of 50 feet.

5. Communications – Authorized users shall ensure a serviceable telephone, radio-telephone or radio communication system is available to provide prompt and reliable communications between the authorized user’s operations and the Prescott National Forest. In the the event of a wildland fire ignition, users shall contact Coconino NF Dispatch –

(928) 527-3552.

6. Wildfire Suppression

a. The Contractor shall take independent action immediately to suppress all fires originating within the contract boundary and camp location. The Contractor shall continue fighting the fire until released from the fire by the Forest Service. The Contractor will take appropriate action on a fire outside the contract area or campsite to the level of their firefighting experience, abilities and qualifications. The Contractor may be requested to assist the Forest Service with fighting a fire if the personnel have been trained and equipped with the proper personnel protective equipment (PPE).

If contract operations are interrupted for firefighting purposes the Contractor shall notify the COR as soon as practical.

b. If the Contractor pursues fighting any wildfire which has moved from off the USFS contract land and crosses onto lands of other ownership, such as private property, the Contractor shall be aware that dangers may be present associated with urbanized areas. For example, the Contractor will need to become highly alert, and take extreme care to avoid dangers associated with open flames or operating heavy equipment near propane/butane tanks and underground gas lines, overhead/underground electric lines, underground septic tanks, and private outbuildings which may contain hazardous or flammable/explosive chemicals. Coordination as soon as possible with USFS and/or local municipal firefighters who are better trained for safe wildland/urban-interface fire suppression tactics is recommended when faced with fires on private lands.

c. All fires shall be reported immediately to the most available Forest Service office. The COR will insure that all fire reports are forwarded immediately to the Coconino Fire Dispatch Office. Even though the fire may have been suppressed by the Contractor’s crew, this report is still required. The office and telephone numbers to which fires shall be reported will be furnished to the Contractor at the contract pre-work meeting.

d. The Contractor shall not perform fire suppression activity, or provide reinforcement support, on any wildfires that originates and remains outside the contract boundary or Contractor’s camp location, without meeting the criteria below.

PROJ NAME: FSR 516 GUARDRAIL IMPROVEMENTS

If the Contractor wishes to be available to assist the Forest Service with emergency wildfire suppression or support activities beyond the contract boundary, all the Contractor’s, and/or Subcontractor’s, equipment must first be signed up on an Equipment Rental Agreement, USDA/USDI Optional Form 294, issued by the Apache-Sitgreaves National Forests. (In cases of extreme emergency, the Forest Service can finalize this agreement at the fire location.)

Emergency use of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.